ARAMA SONUÇLARI

Toplam 37 adet sonuçtan 20 tanesi görüntülenmektedir.

Arama









Yıllara göre arama

Özel Aralık Girişi

Project Management of Railway Investments and Safety Relations: A Case Study for Marmaray
1st Railway Safety Management Systems Workshop, ANKARA/TÜRKİYE, 23 Ekim 2014
ALPKÖKİN PELİN
Pelin Alpkökin Belirtilmemiş
A framework for child safety and health management by analogy to occupational safety and health management
Safety Science, Nisan 2014
BAŞ ESRA
Esra Baş Özgün Makale
Studies on emergency evacuation management for maritime transportation
MARITIME POLICY MANAGEMENT, Vol. 45, No. 5, 2018, s. 622-648, ISSN: 0308-8839
SARVARİ PEİMAN ALİPOUR,ÇEVİKCAN EMRE,ÜSTÜNDAĞ ALP,ÇELİK METİN
An integrated OSH risk management approach to surgical flow disruptions in operating rooms
Safety Science, Kasım 2018, ISSN: 0925-7535
BAŞ ESRA
Esra Baş Özgün Makale
A new resilient risk management model for Offshore Wind Turbine maintenance
SAFETY SCIENCE, 2018, ISSN: 0925-7535
MENTEŞ AYHAN,TURAN OSMAN
Ayhan Menteş Özgün Makale
A Semi Automated Rule Based Approach for Safety BasedScheduling
5th International Project and Construction Management Conference (IPCMC 2018), 16 Kasım 2018
SEVİM MERVE,GÜRCANLI GÜRKAN EMRE
Gürkan Emre Gürcanlı Tam metin bildiri
A resilient risk management model for safe maintenance of fishing vessels
International Conference on Maritime Safety andOperations, 13 Ekim 2016
MENTEŞ AYHAN,HELVACIOĞLU İSMAİL HAKKI,TURAN OSMAN
İsmail Hakkı Helvacıoğlu Tam metin bildiri
A resilient risk management model for safe maintenance of fishing vessels
International Conference on Maritime Safety and Operations, 13 Ekim 2016
MENTEŞ AYHAN,HELVACIOĞLU İSMAİL HAKKI,TURAN OSMAN
Ayhan Menteş Tam metin bildiri
A new fuzzy risk score for occupational safety and health management
12th International FLINS Conference, 24 Ağustos 2016
BAŞ ESRA,ŞAHİN ÖZGE
Esra Baş Tam metin bildiri
Health and Safety Documentation System Establishment inConstruction Projects through Planning and Scheduling, 5th International Project and Construction Management Conference
5th International Project and Construction Management Conference (IPCMC 2018), 16 Kasım 2018
SEVİM MERVE,GÜRCANLI GÜRKAN EMRE
Gürkan Emre Gürcanlı Tam metin bildiri
Change in Occupational Health and Safety Management System: ISO 45001:2018
5th International Project and Construction Management Conference (IPCMC 2018), 16 Kasım 2018
UZUN MERT,BİLİR MAHÇİÇEK SENEM,GÜRCANLI GÜRKAN EMRE
Gürkan Emre Gürcanlı Tam metin bildiri
Change in Occupational Health and Safety Management System: ISO 45001:2018
5th International Project and Construction Management Conference (IPCMC 2018), 16 Kasım 2018
UZUN MERT,BİLİR MAHÇİÇEK SENEM,GÜRCANLI GÜRKAN EMRE
Senem Bilir Mahçiçek Tam metin bildiri
Innovative Safety Management Training Through e Learning
Architectural Engineering and Design Management, Vol. 4, No. 3, Aralık 2008, s. 239-250, ISSN: 17452007
ACAR EMRAH,WALL JOHN,MCNAMEE FRANK,CARNEY MANNİX,YAZICI ÖNEY ELA
Emrah Acar Özgün Makale
Definitions of Human Factor Analysis for the Maritime Safety Management Process
International Association of Maritime Universities (IAMU) 6th Annual General Assembly and Conference, 24 Kasım 2005, s. 235-243
ER ZUHAL,ÇELİK METİN
Zuhal Er Tam metin bildiri
Functional Safety Applications on Railway Systems: Turkish National Railway Signalization Project
24th International Congress on Condition Monitoring and Diagnostics Engineering Management (COMADEM 2011), Stavanger/NORVEÇ, 30 Mayıs 2011, s. 1683-1692
SÖYLEMEZ MEHMET TURAN,DURMUŞ MUSTAFA SEÇKİN,YILDIRIM UĞUR
Mehmet Turan Söylemez Tam metin bildiri
Digital Imaging Tools for Gusset Plate Evaluation
The Fifth International Conference on Bridge Maintenance, Safety and Management, 11 Temmuz 2010
CHRİSTOPHER HİGGİNS, QUANG NGUYEN, O. TUGRUL TURAN
Ömer Tuğrul Turan Tam metin bildiri
Safety barriers for risk management of fishing vessels off the coasts and in open seas of Turkey
MARTECH 2016 - 3rd International Conference on Maritime Technology and Engineering, 4 Temmuz 2016
MENTEŞ AYHAN,YETKİN MURAT,AKYILDIZ HAKAN
Hakan Akyıldız Tam metin bildiri
A Method to Calculate the Accident Probabilities in Construction Industry Using a Poisson Distribution Model
Advances in Safety Management and Human Factors, Florida/AMERİKA BİRLEŞİK DEVLETLERİ, 27 Temmuz 2016, s. 513-523, ISSN: 2194-5357
BİLİR MAHÇİÇEK SENEM,GÜRCANLI GÜRKAN EMRE
Gürkan Emre Gürcanlı Tam metin bildiri
Definitions at human factor analysis for maritime safety management process
International Association of Maritime Universities (IAMU). (2005), 26 Ekim 2005
ER ZUHAL,ÇELİK METİN
Zuhal Er Tam metin bildiri
Hanger replacement effect: experimental and numerical investigation on the Bosphorus bridge
IABMAS 2018, 9th International Conference on Bridge Maintenance, Safety and Management, 9 Temmuz 2018
BAŞ SELÇUK,APAYDIN NURDAN,İLKİ ALPER,CATBAS NECATI
Alper İlki Tam metin bildiri

İLETİŞİM BİLGİLERİ

İstanbul Teknik Üniversitesi Rektörlüğü İTÜ Ayazağa Kampüsü Rektörlük Binası, Maslak-Sarıyer / İstanbul Tel: +90 212 285 3930