ARAMA SONUÇLARI

Toplam 925 adet sonuçtan 20 tanesi görüntülenmektedir.

Arama









Yıllara göre arama

Özel Aralık Girişi

Predicting Cost Impacts of Nonconformances in Construction Projects Using Interpretable Machine Learning
Journal of Construction Engineering and Management, Vol. 150, No. 1, Ocak 2024, ISSN: 0733-9364
KOÇ KERİM, BUDAYAN CENK, EKMEKCİOĞLU ÖMER, TOKDEMİR ONUR BEHZAT
Onur Behzat Tokdemir Özgün Makale
ALISS: Advanced Linear Scheduling System
Construction Management and Economics, Vol. 24, No. 12, Ekim 2006, s. 1253-1267, ISSN: 0144-6193
TOKDEMİR ONUR BEHZAT,ARDİTİ DAVİD,BALCİK CENK
An Integrated Approach to Subcontractor Selection in Construction Projects
Creative Construction Conference, BUDAPEŞTE/MACARİSTAN, 6 Temmuz 2013, s. 617-627
POLAT TATAR GÜL,BİNGÖL BEFRİN NEVAL,DAMCI ATİLLA
Atilla Damcı Tam metin bildiri
Estimation of ideal construction duration in tender preparation stage for housing projects
Organization, Technology and Management in Construction: an International Journal, Vol. 15, No. 1, Ocak 2023, s. 192-212, ISSN: 1847-6228
TIRATACI HAKAN, YAMAN HAKAN
Hakan Yaman Özgün Makale
Investigation of Productivity in the Construction Industry
6th International Project and Construction Management Conference (e-IPCMC2020), 12 Kasım 2020, s. 641-644
BİLİR MAHÇİÇEK SENEM,GÜRCANLI GÜRKAN EMRE
Gürkan Emre Gürcanlı Tam metin bildiri
Comprehensive Root Cause Analysis of Construction Defects Using Semisupervised Graph Representation Learning
Journal of Construction Engineering and Management, Vol. 149, Eylül 2023, ISSN: 0733-9364
MOSTOFİ FATEMEH, TOKDEMİR ONUR BEHZAT, TOĞAN VEDAT
Onur Behzat Tokdemir Özgün Makale
Measuring the Effectiveness of IT Utilization in Construction A Different Point of View
ARCOM, Proceedings of the Association of Researchers in Construction Management (ARCOM) 26th Annual Conference, LEEDS/İNGİLTERE, Vol. 1, 6 Eylül 2010, s. 643-652
İLHAN BAHRİYE,YAMAN HAKAN
Hakan Yaman Tam metin bildiri
Exploring the Adaptability of Daily Look-Ahead Meetings in the Construction Industry
6th International Project and Construction Management Conference (e-IPCMC2020), İstanbul/TÜRKİYE, 12 Kasım 2020, s. 1318-1325
YILMAZ ANIL,TOKDEMİR ONUR BEHZAT
Onur Behzat Tokdemir Tam metin bildiri
Construction Professionals’ Motivation: Case Study of Turkey
14TH INTERNATIONAL CONFERENCE ORGANIZATION, TECHNOLOGY AND MANAGEMENT IN CONSTRUCTION, 4 Eylül 2019
DAMCI ATİLLA,ARDİTİ DAVİD,POLAT TATAR GÜL,TÜRKOĞLU HARUN
Gül Polat Tatar Tam metin bildiri
Integrated Project Delivery (IPD) and Traditional Procurement Methods in Construction Industry-Towards a Team Based Approach
6th International Project and Construction Management Conference (e-IPCMC2020), 12 Kasım 2020, s. 1040-1050
ÜSTÜN PELİN,GÜRCANLI GÜRKAN EMRE
Gürkan Emre Gürcanlı Tam metin bildiri
Tracking major resources for automated progress monitoring of construction activities: masonry work case
Construction Innovation, Vol. 21, No. 4, Ekim 2021, s. 648-667, ISSN: 1471-4175
GÜVEN IŞIN GÜRŞANS, ERGEN PEHLEVAN ESİN
Esin Ergen Pehlevan Özgün Makale
Critical success factors for construction industry transition to circular economy: developing countries’ perspectives
Engineering, Construction and Architectural Management, Haziran 2023, ISSN: 0969-9988
KOÇ KERİM, DURDYEV SERDAR, TLEUKEN AİDANA, EKMEKCİOĞLU ÖMER, MBACHU JASPER, KARACA FERHAT
Ömer Ekmekcioğlu Özgün Makale
Introducing Sustainable And Innovative Materials To Construction Industry: Lessons Learned From A Research Project
6th International Project and Construction Management Conference - eIPCMC 2020, 12 Kasım 2020
İLTER AKIN TOLGA, YONAR FATİH
Akın Tolga İlter Tam metin bildiri
Occupationally Safer Designs in Construction Industry: BIM Based Solution Method
5th International Project and Construction Management Conference (IPCMC 2018), 16 Kasım 2018
TOZER KEMAL DİRGEN,ÇELİK TAHİR,GÜRCANLI GÜRKAN EMRE
Gürkan Emre Gürcanlı Tam metin bildiri
AN APPROACH FOR SAFETY COST ESTIMA TION OF BUILDING CONSTRUCTION
The Eighth International Structural Engineering and Construction Conference, Sidney/AVUSTRALYA, 23 Kasım 2015, s. 869-874
BİLİR MAHÇİÇEK SENEM,GÜRCANLI GÜRKAN EMRE
Senem Bilir Mahçiçek Tam metin bildiri
Process Observation in Building Construction Methods Education A Case Study
2nd International Conference on Design Education, Sidney/AVUSTRALYA, 28 Haziran 2010
ALTUN MEHMET CEM,YAZICIOĞLU FATİH
Explaining the supply of home repair and renovation services in the undeclared economy: lessons from Europe
Construction Management and Economics, Vol. 39, Şubat 2021, ISSN: 0144-6193","1466-433X
KAYAOĞLU YILMAZ AYŞEGÜL, WİLLİAMS COLİN
Turkish Architectural and Civil Engineering Education within the Scope of Sustainable Construction
5. International Project Construction Management Conference, Girne/KUZEY KIBRIS TÜRK CUMHURİYETİ, 16 Kasım 2018, s. 200-208
TOPAK FATİH,TOKDEMİR ONUR BEHZAT,PEKERİÇLİ MEHMET KORAY,TANYER ALİ MURAT
Onur Behzat Tokdemir Tam metin bildiri
The New Severity Scale of Occupational Accidents for Construction Projects
5th International Project and Construction Management Conference (IPCMC 2018), 16 Kasım 2018
BİLİR MAHÇİÇEK SENEM,GÜRCANLI GÜRKAN EMRE
Gürkan Emre Gürcanlı Tam metin bildiri
Challenges in Line-of-Balance Scheduling
Journal of Construction Engineering and Management, Vol. 128, No. 6, Aralık 2002, s. 545-556, ISSN: 0733-9364
ARDİTİ DAVİD,TOKDEMİR ONUR BEHZAT,SUH KANGSUK

İLETİŞİM BİLGİLERİ

İstanbul Teknik Üniversitesi Rektörlüğü İTÜ Ayazağa Kampüsü Rektörlük Binası, Maslak-Sarıyer / İstanbul Tel: +90 212 285 3930