Health and Safety Documentation System Establishment inConstruction Projects through Planning and Scheduling, 5th International Project and Construction Management Conference
5th International Project and Construction Management Conference (IPCMC 2018), 16 Kasım 2018
SEVİM MERVE,GÜRCANLI GÜRKAN EMRE
|
Heavy Equipment Scheduling for Horizontal Construction Projects
7th International Conference on Engineering, Project, and Production Management, No. 182, 21 Eylül 2016, s. 265-273
GÜRCANLI GÜRKAN EMRE,TÜRKOĞLU HARUN,BİLİR MAHÇİÇEK SENEM
|
A Design Approach for General Type-2 Fuzzy Logic Controllers with an Online Scheduling Mechanism
2020 IEEE International Conference on Fuzzy Systems (FUZZ-IEEE), 19 Temmuz 2020
SAKALLİ AHMET,KUMBASAR TUFAN,MENDEL JERRY
|
A New Model for the On Line Vehicle Scheduling Problem with Drivers Working Hours
8th International Logistics and Supply Chain Congress 2010, Istanbul/TÜRKİYE, 4 Kasım 2010, s. 424-431
TAŞKIN. ARSLAN, TANYAŞ. MEHMET, BASKAK. MURAT
|
Project scheduling maximizing the fuzzy net present value influenced by the decision maker attitude
JOURNAL OF MULTIPLE-VALUED LOGIC AND SOFT COMPUTING, Vol. 25, No. 2-3, Eylül 2015, s. 147-168, ISSN: 1542-3980
UÇAL SARI İREM,DOROTA KUCHTA
|
A Nurse Scheduling Case in a Turkish Hospital
International Symposium for Production Research 2021, 7 Ekim 2021
YASAN EDANUR, CESUR TUĞBA, ASLAN TUBA NUR, KONYALIOĞLU AZİZ KEMAL, KÖSE RANA EZGİ, BELDEK TUĞÇE, ÇEBİ FERHAN
|
Heuristics and Simulated Annealing Algorithm for the Surgical Scheduling Problem Heuristics, Metaheuristics and Approximate Methods in Planning and Scheduling
2016, s. 225-241, Springer
HANÇERLİOĞULLARI KÖKSALMIŞ GÜLŞAH, KÖKSALMIŞ EMRAH, HANÇERLİOĞULLARI KADİR ÖYMEN
|
Delay Scheduling A New Concept for Stabilization in Multiple Delay Systems
Journal of Vibration and Control, Vol. 11, No. 9, Eylül 2005, s. 1159-1172, ISSN: 1077-5463
NEJAT OLGAC,ERGENÇ ALİ FUAT,RİFAT SİPAHİ
|
Delay scheduling an unconventional use of time delay for trajectory tracking
Mechatronics, Vol. 17, No. 4-5, Mayıs 2007, s. 199-206, ISSN: 09574158
RİFAT SİPAHİ,NEJAT OLGAC,ERGENÇ ALİ FUAT
|
Application of a Fast Evolutionary Algorithm to Short term Hydro thermal Generation Scheduling
Energy Sources, Part B: Economics, Planning, and Policy, Vol. 6, No. 4, Ağustos 2011, s. 395-405, ISSN: 1556-7249
TÜRKAY BELGİN,FATİH MECİTOĞLU,SAİM BARAN
|
A novel differential evolution application to short term electrical power generation scheduling
International Journal of Electrical Power & Energy Systems, Vol. 33, No. 6, Temmuz 2011, s. 1236-1242, ISSN: 01420615
KELES ALİ,UYAR AYŞE ŞİMA,TÜRKAY BELGİN
|
Scheduling Asphalt Highway Construction Operations Using the Combination of Line of Balance and Discrete Event Simulation Techniques
IEEM International Conference on Industrial Engineering and Engineering Management (IEEM09), 8 Aralık 2009
POLAT TATAR GÜL,BUYUKSARACOGLU YALCİN,DAMCI ATİLLA
|
On modeling of priority-based SIP request scheduling
SIMULATION MODELLING PRACTICE AND THEORY, Vol. 80, Ocak 2018, s. 128-144, ISSN: 1569-190X
YAVAŞ DEMİR YAŞA,HÖKELEK İBRAHİM,GÜNSEL KALYONCU BİLGE
|
On fluid-flow modeling of priority based request scheduling for finite buffer SIP server
International Journal of Communication Systems, Vol. 30, No. 17, Kasım 2017, s. 3357, ISSN: 10745351
YAVAŞ DEMİR YAŞA,HÖKELEK İBRAHİM,GÜNSEL KALYONCU BİLGE
|
Heavy Equipment Scheduling For Horizontal Construction Projects
7th International Conference on Engineering, Project, and Production Management, 21 Ekim 2016
GÜRCANLI GÜRKAN EMRE,TÜRKOĞLU HARUN,BİLİR MAHÇİÇEK SENEM
|
AirNet: Energy-Aware Deployment and Scheduling of Aerial Networks
IEEE Transactions on Vehicular Technology, Vol. 69, Ocak 2020, ISSN: 0018-9545","1939-9359
BOZKAYA ELİF, FOERSTER KLAUS, SCHMİD STEFAN, CANBERK BERK
|
The Financial Effect of the Electricity Price Forecasts’ Inaccuracy on a Hydro-Based Generation Company
ENERGIES, Vol. 11, No. 8, Ağustos 2018, ISSN: 1996-1073
UĞURLU UMUT,KAYA AYCAN,TAŞ OKTAY,ÖKSÜZ İLKAY
|
Residential Load Scheduling Optimization forDemand-Side Management under Time-of-Use Rate
2018 6th International Istanbul Smart Grids and Cities Congress and Fair, ICSG 2018, 25 Nisan 2018
DUMAN ANIL CAN,GÜLER ÖNDER,DEVECİ KAAN,GÖNÜL ÖMER
|
Mixed-integer linear programming based load scheduling optimization for smart homes in Turkey
The 15th International Conference of Young Scientists on Energy Issues(CYSENI 2018), Kaunas/LİTVANYA, 23 Mayıs 2018, ISSN: 1822-7554
DUMAN ANIL CAN,GÜLER ÖNDER,GÖNÜL ÖMER,DEVECİ KAAN
|
THE EFFECTS OF UNFORESEEN CHANGES IN AGGREGATED LOAD SCHEDULING ON TRANSMISSION SYSTEM OPERATION
16th International Conference on Clean Energy (ICCE-2018), Famagusta/KUZEY KIBRIS TÜRK CUMHURİYETİ, 9 Mayıs 2018
BAĞRIYANIK FATMA GÜL,BAĞRIYANIK MUSTAFA,DAĞ HASAN
|