Aircraft Scheduled Airframe Maintenance and Downtime Integrated Cost Model
ADVANCES IN OPERATIONS RESEARCH, Haziran 2016
SALTOĞLU REMZİ,HUMAİRA NAZMİA,İNALHAN GÖKHAN
|
Cost based performance evaluation of supply chain types regarding demand uncertainty: A proposed mathematical model
Fen Bilimleri Enstitüsü, İstanbul Teknik Üniversitesi, 2009
HASAN CAN KESKİN
|
Developing a framework for target cost in post-disaster housing by minimizing time and optimizing cost using 3D model
Lisansüstü Eğitim Enstitüsü, İstanbul Teknik Üniversitesi, 2024
ZAFER ÜZMEZ
|
Mathematical model proposal and cost optimization in the creation of an emission reduction roadmap for an industrial enterprise in Turkey
Enerji Enstitüsü, İstanbul Teknik Üniversitesi, 2023
DENİZ CAN
|
A Conceptual Model for Analyzing Life Cycle Cost of Residential Windows in Turkey
The World Sustainable Building – SB08 Conference, MELBOURNE/AVUSTRALYA, Vol. 2, 21 Eylül 2008, s. 2254-2261
YAMAN HAKAN,ÇETİNER İKBAL,TAVİL GÜLTEN ASLIHAN,ÇOŞKUN KEVSER
|
Cost Model Approach for Next Generation Emergency Call Systems - Italy Case Study (WOS:000391099300016)
VEHITS 2016 2nd International Conference on Vehicle Technology and Intelligent Transport Systems, Roma/İTALYA, 23 Nisan 2016, s. 130-137
APAK AHMET,ÜSTOĞLU İLKER
|
A crashing-based time-cost trade-off model considering quality cost and contract clauses
International Journal of Construction Management, Vol. 23, No. 6, Haziran 2023, s. 954-963, ISSN: 1562-3599
AKIN FIRAT DOĞU, POLAT TATAR GÜL, TÜRKOĞLU HARUN, DAMCI ATİLLA
|
Allocation of Returned Products among Different Recovery Options through an Opportunity Cost Based Dynamic Approach
Decision Sciences, Vol. 45, No. 6, Aralık 2014, s. 1083-1116, ISSN: 1540-5915
ÖZDEMİR AKYILDIRIM ÖZNUR,DENİZEL KARAKAYA EMİNE MELTEM,FERGUSON MARK
|
A Fuzzy Multi Objective Model for Solving Project Network Goal Programming Problem With Bonus and Incremental Penalty Cost
Computer and Industrial Engineering, Vol. 82, 2015, s. 143-150
ÇEBİ FERHAN,İREM OTAY
|
A crashing-based time-cost trade-off model considering quality cost and contract clauses
International Journal of Construction Management, Vol. 23, No. 6, Haziran 2023, s. 954-963, ISSN: 1562-3599
AKIN FIRAT DOĞU, POLAT TATAR GÜL, TÜRKOĞLU HARUN, DAMCI ATİLLA
|
COMPUTER AIDED DESIGN AND COST ESTIMATION MODEL OF COMMERCIAL SODA ASHPROCESSES FOR TURKISH TRONA MINERAL
MODELLING, SIMULATION AND CONTROL HYDROMETALLURGICAL PROCESSES, Vol. 1, No. null, Ocak 1993, s. 213-222
SAYGILI G , OKUTAN H
|
A Building Cost Estimation Model Based On Functional Elements
A|Z ITU Journal of the Faculty of Architecture, Vol. 4, No. 1, Ocak 2007, s. 73-87
YAMAN HAKAN,TAŞ ELÇİN FİLİZ
|
“A Building Cost Estimation Model Based On Functional Elements”
A|Z ITU Journal of the Faculty of Architecture, Vol. Vol:4, No. No: 1, Ocak 2007, s. s. 73-87, ISSN: 1302-8324
Y. DOC. DR. HAKAN YAMAN, Y. DOC. DR. ELCIN TAS
|
A Building Cost Estimating Model Based on Cost Significant Work Packages
Engineering, Construction and Architectural Management, Vol. 3, No. 12, 2005, s. 251 – 263, ISSN: 0969-9988, Emerald
Y. DOC. DR. ELCIN TAS, Y. DOC. DR. HAKAN YAMAN
|
A Building Cost Estimation Model Based on Functional Elements
AZ ITU Journal of the Faculty of Architecture, Vol. 4, No. 1, 2007, s. 73-87, ISSN: 2564-7571
YAMAN HAKAN,TAŞ ELÇİN FİLİZ
|
Computer Aided Design and Cost Estimation Model of Soda Ash Processes From Trona
7 th. International Mineral Processing Symposium
DURMAZHİLMİOĞLU. N,, OKUTAN. H,
|
Time Cost Quality Trade off Model for Subcontractor Selection Using Discrete Particle Swarm Optimization Algorithm
31st Annual ARCOM Conference, 7 Eylül 2015
BİNGÖL BEFRİN NEVAL,POLAT TATAR GÜL
|
Method for optimal vertical alignment of highways
PROCEEDINGS OF THE INSTITUTION OF CIVIL ENGINEERS-TRANSPORT, Vol. 162, No. 4, 2009, s. 177-188, ISSN: 0965-092X
,GÖKTEPE AHMET BURAK,LAV ABDULLAH HİLMİALTUN S.
|
A building cost estimation model based on cost significant work packages
Engineering, Construction and Architectural Management, Vol. 12, No. 3, Haziran 2005, s. 251-263, ISSN: 0969-9988
TAŞ ELÇİN FİLİZ,YAMAN HAKAN
|
A fuzzy multi objective model for solving project network problem with bonus and incremental penalty cost
Computers & Industrial Engineering, Vol. 82, Nisan 2015, s. 143-150, ISSN: 03608352
ÇEBİ FERHAN,OTAY İREM
|