ARAMA SONUÇLARI

Toplam 290 adet sonuçtan 20 tanesi görüntülenmektedir.

Arama









Yıllara göre arama

Özel Aralık Girişi

An Analysis Of Dispute Resolution Literature in Construction Management Journals
BEAR 2008 & CIB W89: International Conference in Building Education an, 2008
, D. ILTER, A. DIKBAS
Deniz Artan Bildiri
RATEWORKSPACE: BIM INTEGRATED POST-OCCUPANCY EVALUATION SYSTEM FOR OFFICE BUILDINGS
JOURNAL OF INFORMATION TECHNOLOGY IN CONSTRUCTION, Vol. 27, Nisan 2022, s. 441-485, ISSN: 1874-4753
ARTAN DENİZ, ERGEN PEHLEVAN ESİN, KULA BEHLÜL, GÜVEN IŞIN GÜRŞANS
Identification of Queries for Decision Making in BuildingOperation and Maintenance
5th International Project and Construction Management Conference (IPCMC 2018), 16 Kasım 2018
ARTAN DENİZ,YILMAZ NEZİHA,ERGEN PEHLEVAN ESİN
Deniz Artan Tam metin bildiri
A Critical Review of Post-Occupancy Evaluation (POE) Tools
5th International Project and Construction Management Conference (IPCMC2018), 16 Kasım 2018
ARTAN DENİZ,ERGEN PEHLEVAN ESİN,DÖNMEZ DENİZ,TEKÇE IŞILAY
Deniz Artan Tam metin bildiri
BIM Based Time Management Among Construction Contractors in Turkey
Periodica Polytechnica Architecture, Vol. 52, No. 2, Temmuz 2021, s. 192-204, ISSN: 0324-590X
SARAÇ ÇIRACIOĞLU AYŞEN, YAMAN HAKAN
Hakan Yaman Özgün Makale
BIM (Building Information Modeling) IFC (Industry Foundation Classes) ACCC (Automated Code Compliance Checking) Concepts: An Overview
5th International Project and Construction Management Conference, Girne/KUZEY KIBRIS TÜRK CUMHURİYETİ, 16 Kasım 2018, s. 45-69
AYDIN MURAT
Hakan Yaman Tam metin bildiri
A BIM Based Automated Code Compliance Checking Conceptual Model Proposal for Housing Projects in Turkey
5th International Project and Construction Management Conference, Girne/KUZEY KIBRIS TÜRK CUMHURİYETİ, 16 Kasım 2018, s. 30-44
AYDIN MURAT
Hakan Yaman Tam metin bildiri
A Meta Analysis Study for BIM Based Automated Code Compliance Checking
5th International Project and Construction Management Conference, Girne/KUZEY KIBRIS TÜRK CUMHURİYETİ, 16 Kasım 2018, s. 9-29
AYDIN MURAT
Hakan Yaman Tam metin bildiri
Detecting unbalanced bids via an improved grading-based model
ORGANIZATION, TECHNOLOGY MANAGEMENT IN CONSTRUCTION: AN INTERNATIONAL JOURNAL, Vol. 12, No. 1, Mart 2020, ISSN: 1847-6228
POLAT TATAR GÜL,TÜRKOĞLU HARUN,DAMCI ATİLLA,AKIN FIRAT DOĞU
Fırat Doğu Akın Özgün Makale
Information management roles in real estate development lifecycle: literature review on BIM and IPD framework
Construction Innovation, Vol. 21, Ekim 2021, s. 723-742, ISSN: 14770857 14714175
BİLGE EYMEN ÇAĞATAY, YAMAN HAKAN
Hakan Yaman Özgün Makale
A building cost estimation model based on cost significant work packages
Engineering, Construction and Architectural Management, Vol. 12, No. 3, Haziran 2005, s. 251-263, ISSN: 0969-9988
TAŞ ELÇİN FİLİZ,YAMAN HAKAN
Hakan Yaman Özgün Makale
A Multi Agent Systems Based Contractor Pre Qualification Model
Journal of Engineering, Construction and Architectural Management, Vol. 23, No. 6, Kasım 2016, s. 709-726, ISSN: 0969-9988
KOĞ FAİKCAN,YAMAN HAKAN
Hakan Yaman Özgün Makale
A comparative input output analysis of the construction sector in Turkey and EU countries
Engineering, Construction and Architectural Management, Vol. 18, No. 3, Mayıs 2011, s. 248-265, ISSN: 0969-9988
İLHAN BAHRİYE,YAMAN HAKAN
Hakan Yaman Özgün Makale
A building material evaluation and selection model for the Turkish construction sector
Engineering, Construction and Architectural Management, Vol. 15, No. 2, Mart 2008, s. 149-163, ISSN: 0969-9988
TAŞ ELÇİN FİLİZ,YAMAN HAKAN,TANAÇAN LEYLA
Hakan Yaman Özgün Makale
Total Construction Duration Calculation of Public Housing Projects in Turkey: A Case Study
Golden Light Publishing - Journal of Construction Engineering, Management & Innovation, Vol. 6, No. 1, Mart 2023, s. 16-29, ISSN: 2630-5771
TIRATACI HAKAN, YAMAN HAKAN
Hakan Yaman Özgün Makale
Estimation of ideal construction duration in tender preparation stage for housing projects
Organization, Technology and Management in Construction: an International Journal, Vol. 15, No. 1, Ocak 2023, s. 192-212, ISSN: 1847-6228
TIRATACI HAKAN, YAMAN HAKAN
Hakan Yaman Özgün Makale
A Meta Analysis Study for BIM Based Automated Code Compliance Checking
IPCMC2018 - 5th International Project and Construction Management Conference, GİRNE/KUZEY KORE, 16 Kasım 2018, s. 9-29
AYDIN MURAT, YAMAN HAKAN
Hakan Yaman Tam metin bildiri
A BIM Based Automated Code Compliance Checking Conceptual Model Proposal for Housing Projects in Turkey
IPCMC2018 - 5th International Project and Construction Management Conference, GİRNE/KUZEY KIBRIS TÜRK CUMHURİYETİ, 16 Kasım 2018, s. 30-44
AYDIN MURAT, YAMAN HAKAN
Hakan Yaman Tam metin bildiri
Currency Risk Analysis on Construction Cash Flows
IPCMC 2022 - 7th International Project and Construction Management Conference, İSTANBUL/TÜRKİYE, Vol. 1, No. 1, 20 Ekim 2022, s. 1138-1144
TÜZ ÖZLEM, YAMAN HAKAN
Hakan Yaman Tam metin bildiri
The Turkish Construction Sector from a Macroeconomic Perspective
IPCMC 2022 - 7th International Project and Construction Management Conference, İSTANBUL/TÜRKİYE, Vol. 1, No. 1, 20 Ekim 2022, s. 545-562
BÜYÜKYORAN FARUK, YAMAN HAKAN
Hakan Yaman Tam metin bildiri

İLETİŞİM BİLGİLERİ

İstanbul Teknik Üniversitesi Rektörlüğü İTÜ Ayazağa Kampüsü Rektörlük Binası, Maslak-Sarıyer / İstanbul Tel: +90 212 285 3930