Generating synthetic data with variational autoencoder to address class imbalance of graph attention network prediction model for construction management
Advanced Engineering Informatics, Vol. 62, Ekim 2024, ISSN: 1474-0346
MOSTOFİ FATEMEH,TOKDEMİR ONUR BEHZAT,TOĞAN VEDAT
|
Predicting Cost Impacts of Nonconformances in Construction Projects Using Interpretable Machine Learning
Journal of Construction Engineering and Management, Vol. 150, No. 1, Ocak 2024, ISSN: 0733-9364
KOÇ KERİM, BUDAYAN CENK, EKMEKCİOĞLU ÖMER, TOKDEMİR ONUR BEHZAT
|
Comprehensive Root Cause Analysis of Construction Defects Using Semisupervised Graph Representation Learning
Journal of Construction Engineering and Management, Vol. 149, Eylül 2023, ISSN: 0733-9364
MOSTOFİ FATEMEH, TOKDEMİR ONUR BEHZAT, TOĞAN VEDAT
|
Effect of learning on line-of-balance scheduling
International Journal of Project Management, Vol. 19, No. 5, Temmuz 2001, s. 265-277, ISSN: 02637863
ARDİTİ DAVİD,TOKDEMİR ONUR BEHZAT,SUH KANGSUK
|
A BIBLIOMETRIC REVIEW OF GLOBAL SCIENTIFIC RESEARCH TRENDS ON ARTIFICIAL INTELLIGENCE AND CONSTRUCTION MANAGEMENT FROM 1988 TO 2018
6th INTERNATIONAL CONFERENCE ON ENGINEERING NATURAL SCIENCES, URFA/TÜRKİYE, 24 Ocak 2020, s. 135-142
KULOĞLU ALİ FATİH,SAYGILI MURATHAN,TOKDEMİR ONUR BEHZAT
|
Delay Risk Assessment of Repetitive Construction Projects Using Line-of-Balance Scheduling and Monte Carlo Simulation
Journal of Construction Engineering and Management, Vol. 145, No. 2, Şubat 2019, ISSN: 0733-9364
TOKDEMİR ONUR BEHZAT, EROL HÜSEYİN, DİKMEN TOKER İREM
|
A crashing-based time-cost trade-off model considering quality cost and contract clauses
International Journal of Construction Management, Vol. 23, No. 6, Haziran 2023, s. 954-963, ISSN: 1562-3599
AKIN FIRAT DOĞU, POLAT TATAR GÜL, TÜRKOĞLU HARUN, DAMCI ATİLLA
|
Revisiting the concept of natural rhythm of production in line of balance scheduling
International Journal of Construction Management, Vol. 22, No. 12, Temmuz 2022, s. 2335-2344, ISSN: 1562-3599","2331-2327
DAMCI ATİLLA
|
Resource Leveling of Railway Track Construction Operations Using the Linear Scheduling and Genetic Algorithm Techniques
International Conference on Construction and Real Estate Management, BRISBANE/AVUSTRALYA, Vol. 1, 1 Aralık 2010, s. 105-110
DAMCI ATİLLA,POLAT TATAR GÜL
|
Civil engineers’ personal values/demographics linkage in project team building
Engineering, Construction and Architectural Management, Vol. 24, No. 6, Kasım 2017, s. 1337-1349, ISSN: 0969-9988
DAMCI ATİLLA,ARDİTİ DAVİD,POLAT TATAR GÜL
|
Impacts of different objective functions on resource leveling in construction projects a case study
Journal of Civil Engineering and Management, Vol. 20, No. 4, Temmuz 2014, s. 537-547, ISSN: 1392-3730
DAMCI ATİLLA,POLAT TATAR GÜL
|
Education Effects on Participant’s Awareness: Zero Waste Management Education in Istanbul Technical University (ITU) Ayazağa Campus
ICSD 6th International Conference on sustainable Development, 4 Kasım 2020
MAÇİN KADRİYE ELİF, ARIKAN OSMAN ATİLLA, DEMİR İBRAHİM
|
Motivation of Civil Engineers and Architects in Turkey
Organization, Technology and Management in Construction: an International Journal, Mart 2020, ISSN: 1847-5450
DAMCI ATİLLA,ARDİTİ DAVİD,POLAT TATAR GÜL,TÜRKOĞLU HARUN
|
Market Selection Using the Integration of AHP and PROMETHEE Methods
14TH INTERNATIONAL CONFERENCE ORGANIZATION, TECHNOLOGY AND MANAGEMENT IN CONSTRUCTION, 4 Eylül 2019
POLAT TATAR GÜL,FİDAN GİZEM,TÜRKOĞLU HARUN,DAMCI ATİLLA
|
Scheduling Asphalt Highway Construction Operations Using the Combination of Line of Balance and Discrete Event Simulation Techniques
Industrial Engineering and Engineering Management Conference, 8 Aralık 2009
POLAT TATAR GÜL,BÜYÜKSARAÇOĞLU YALÇIN,DAMCI ATİLLA
|
Identification of Location Selection Criteria for Shopping Centres Case of Forum Istanbul
International Conference on Construction and Real Estate Management, BRISTOL/İNGİLTERE, Vol. 1, 21 Ağustos 2007, s. 19-22
ERSOY MEHMET ALİ,DAMCI ATİLLA
|
Investigating the impact of emerging technologies on construction safety performance
Engineering, Construction and Architectural Management, Vol. 31, No. 3, Mart 2024, ISSN: 0969-9988
DOBRUCALI ESRA,DEMİRKESEN ÇAKIR SEVİLAY,SADIKOĞLU EMEL,ZHANG CHENGYİ,DAMCI ATİLLA
|
Effect of organizational culture on delay in construction
International Journal of Project Management, Vol. 35, No. 2, Şubat 2017, s. 136-147, ISSN: 02637863
ARDITI DAVID,NAYAK SHRUTI,DAMCI ATİLLA
|
Barriers and Benefits of Total Quality Management in the Constructıon Industry Evidence from Turkish Contractors
7th Research/Expert Conference with International Participations, NEUM/BOSNA HERSEK, 1 Haziran 2011, s. 1115-1120
POLAT TATAR GÜL,DAMCI ATİLLA,TATAR YALÇIN
|
An integrated multi-criteria decision-making model for site selection of wave energy converters: a case study
Journal of Construction Engineering, Management & Innovation, Vol. 6, No. 3, Eylül 2023, s. 161-175, ISSN: eISSN 2630-5771
PİERRE ABDİ AYAN, SADIKOĞLU EMEL, TÜRKOĞLU HARUN, DAMCI ATİLLA, DEMİRKESEN ÇAKIR SEVİLAY, ARDİTİ DAVİD, KIRCA VEYSEL ŞADAN ÖZGÜR
|