Municipal Solid Waste Management Cost of Waste to Energy Technologies and Comparison with Landfilling
The 7th International Symposium on the Environment and Morals, İstanbul/TÜRKİYE, 21 Kasım 2024
MAÇİN KADRİYE ELİF,ÖVEZ SERRA SELİN
|
Development of zero-based budgeting approach for multinational construction contractors
Engineering, Construction and Architectural Management, Vol. 30, No. 10, Ağustos 2023, s. 5217-5232, ISSN: 0969-9988
KAZAR GÖKHAN, MUTLU UĞUR, TOKDEMİR ONUR BEHZAT
|
Accident Analysis for Construction Safety Using Latent Class Clustering and Artificial Neural Networks
Journal of Construction Engineering and Management, Vol. 146, No. 3, Mart 2020, ISSN: 0733-9364
AYHAN BİLAL UMUT,TOKDEMİR ONUR BEHZAT
|
Quality Failures-Based Critical Cost Impact Factors: Logistic Regression Analysis
Journal of Construction Engineering and Management, Vol. 148, Aralık 2022, ISSN: 0733-9364
KAZAR GÖKHAN, DOĞAN NEŞET BERKAY, AYHAN BİLAL UMUT, TOKDEMİR ONUR BEHZAT
|
Multiedge Graph Convolutional Network for House Price Prediction
Journal of Construction Engineering and Management, Vol. 149, Kasım 2023, ISSN: 0733-9364
MOSTOFİ FATEMEH, TOĞAN VEDAT, BAŞAĞA HASAN BASRİ, ÇITIPITIOĞLU AHMET, TOKDEMİR ONUR BEHZAT
|
Scheduling system for repetitive unit construction using line‐of‐balance technology
Engineering, Construction and Architectural Management, Vol. 8, No. 2, Şubat 2001, s. 90-103, ISSN: 0969-9988
ARDITI DAVID,TOKDEMİR ONUR BEHZAT,SUH KANGSUK
|
A lean thinking perspective towards K12 classroom design in Turkey
Journal of Construction Engineering, Management Innovation, Vol. 3, No. 3, Eylül 2020, s. 232-248, ISSN: 2630-5771
TAŞKIN GÖKÇE NİHAN,TOKDEMİR ONUR BEHZAT
|
Effect of learning on line-of-balance scheduling
International Journal of Project Management, Vol. 19, No. 5, Temmuz 2001, s. 265-277, ISSN: 02637863
ARDİTİ DAVİD,TOKDEMİR ONUR BEHZAT,SUH KANGSUK
|
Exploring the Adaptability of Daily Look-Ahead Meetings in the Construction Industry
6th International Project and Construction Management Conference (e-IPCMC2020), İstanbul/TÜRKİYE, 12 Kasım 2020, s. 1318-1325
YILMAZ ANIL,TOKDEMİR ONUR BEHZAT
|
Automated Identification of Vagueness in the FIDIC Silver Book Conditions of Contract
Journal of Construction Engineering and Management, Vol. 148, Ocak 2022, ISSN: 0733-9364
CANDAŞ ALİ BEDİİ, TOKDEMİR ONUR BEHZAT
|
Comprehensive Root Cause Analysis of Construction Defects Using Semisupervised Graph Representation Learning
Journal of Construction Engineering and Management, Vol. 149, Eylül 2023, ISSN: 0733-9364
MOSTOFİ FATEMEH, TOKDEMİR ONUR BEHZAT, TOĞAN VEDAT
|
Turkish Architectural and Civil Engineering Education within the Scope of Sustainable Construction
5. International Project Construction Management Conference, Girne/KUZEY KIBRIS TÜRK CUMHURİYETİ, 16 Kasım 2018, s. 200-208
TOPAK FATİH,TOKDEMİR ONUR BEHZAT,PEKERİÇLİ MEHMET KORAY,TANYER ALİ MURAT
|
Sustainable Construction in Turkish Higher Education Context
Journal of Construction Engineering, Management and Innovation, Vol. 2, No. 1, Mart 2019, s. 40-47, ISSN: 2630-5771
TOPAK FATİH,TOKDEMİR ONUR BEHZAT,PEKERİÇLİ MEHMET KORAY,TANYER ALİ MURAT
|
Cold chain logistics for frozen food at tourism destinations
Pressacademia, Vol. 4, No. 2, Haziran 2017, s. 159-167, ISSN: 2146-7943
TALAY DEĞİRMENCİ IŞILAY,KARAYÜN İSMAİL,ÖZDEMİR AKYILDIRIM ÖZNUR
|
Soil arching and load transfer mechanism for slope stabilized piles
Journal of Civil Engineering and Management, Taylor and Francis/İNGİLTERE, Vol. 18, No. 5, Mayıs 2012, s. 701-708
KAHYAOĞLU MEHMET RİFAT,ÖNAL OKAN,İMANÇLI GÖKHAN,ÖZDEN GÜRKAN,KAYALAR ARİF ŞENGÜN
|
Managing Owner s Risk of Contractor Default
Journal of Construction Engineering and Management, Vol. 131, No. 9, Eylül 2005, s. 973-978, ISSN: 0733-9364
OS AL SOBİEİ,ARDİTİ DAVİD,POLAT TATAR GÜL
|
Impacts of different objective functions on resource leveling in construction projects a case study
Journal of Civil Engineering and Management, Vol. 20, No. 4, Temmuz 2014, s. 537-547, ISSN: 1392-3730
DAMCI ATİLLA,POLAT TATAR GÜL
|
Detecting Unbalanced Bids via Improved Grading-based Model
Organization, Technology and Management in Construction: An International Journal, Mart 2020, ISSN: 1847-5450
POLAT TATAR GÜL,TÜRKOĞLU HARUN,DAMCI ATİLLA,AKIN FIRAT DOĞU
|
An integrated fuzzy MCGDM approach for supplier selection problem
Journal of Civil Engineering and Management, Vol. 23, No. 7, Temmuz 2017, s. 926-942, ISSN: 1392-3730
POLAT TATAR GÜL,EKİN ERAY,BİNGÖL BEFRİN NEVAL
|
Use of float consumption rate in resource leveling of construction projects
Frontiers of Engineering Management, Vol. 9, No. 1, Mart 2022, s. 135-147, ISSN: 2095-7513
DAMCI ATİLLA, POLAT TATAR GÜL, AKIN FIRAT DOĞU, TÜRKOĞLU HARUN
|