Estimation of ideal construction duration in tender preparation stage for housing projects
Organization, Technology and Management in Construction: an International Journal, Vol. 15, No. 1, Ocak 2023, s. 192-212, ISSN: 1847-6228
TIRATACI HAKAN, YAMAN HAKAN
|
A building material evaluation and selection model for the Turkish construction sector
Engineering, Construction and Architectural Management, Vol. 15, No. 2, Mart 2008, s. 149-163, ISSN: 0969-9988
TAŞ ELÇİN FİLİZ,YAMAN HAKAN,TANAÇAN LEYLA
|
BIM (Building Information Modeling) IFC (Industry Foundation Classes) ACCC (Automated Code Compliance Checking) Concepts: An Overview
5th International Project and Construction Management Conference, Girne/KUZEY KIBRIS TÜRK CUMHURİYETİ, 16 Kasım 2018, s. 45-69
AYDIN MURAT
|
A BIM Based Automated Code Compliance Checking Conceptual Model Proposal for Housing Projects in Turkey
5th International Project and Construction Management Conference, Girne/KUZEY KIBRIS TÜRK CUMHURİYETİ, 16 Kasım 2018, s. 30-44
AYDIN MURAT
|
A Meta Analysis Study for BIM Based Automated Code Compliance Checking
5th International Project and Construction Management Conference, Girne/KUZEY KIBRIS TÜRK CUMHURİYETİ, 16 Kasım 2018, s. 9-29
AYDIN MURAT
|
A System Dynamics Approach for Construction Waste Management in Turkey
Sixth International Symposium on Green Chemistry, Sustainable Development and Circular Economy (GREENchem6), Selanik/YUNANİSTAN, 20 Eylül 2020
BELDEK TUĞÇE,KONYALIOĞLU AZİZ KEMAL,CAMGÖZ AKDAĞ HATİCE
|
Validation of a visual perception model
Joint Int. Conf. on Construction Culture, Innovation, and Management - CCIM, Dubai, United Arabian Emirates, 26 Kasım 2006
BITTERMANN MICHAEL STEFAN,CIFTCIOGLU OZER
|
A building material evaluation and selection model for the Turkish construction sector
Engineering, Construction and Architectural Management, Vol. 15, No. 2, 2008, s. 149-169
TAŞ ELÇİN FİLİZ,YAMAN HAKAN,TANAÇAN LEYLA
|
Vanishing heritage: Values of wooden minaret mosque Brezovača
Journal of Architecture, Planning and Construction Management, Vol. 7, No. 1, Temmuz 2018, ISSN: 2231-9514
KUDUMOVIC LANA
|
The Current State of the Research on Building Facade Durability under the Effects of Climate Change
The 10th EuroAmerican Congress REHABEND 2024 on Construction Pathology, Rehabilitation Technology and Heritage Management, Gijon/İSPANYA, 7 Mayıs 2024, ISSN: 2386-8198
KARAKUŞ ZAMBAK ÖZLEM, EDİS ECEM
|
An Experimental Study on Pre tensioned Cponcrete Members
6th International Conference on Structural Engineering and Construction Management 2015, Kandy/SRİ LANKA, 11 Aralık 2015, s. 11-13
ABDULLAH DÖNMEZ,ATAOĞLU ŞENOL,ZİYA ABDULALİYEV
|
Skills, Competencies and Knowledge for Construction Management Graduates
A|Z ITU JOURNAL OF THE FACULTY OF ARCHITECTURE, Vol. 21, No. 1, Mart 2024, s. 1-14, ISSN: 2564-7571
TEZEL ECEM,ÇAKMAK FATMA PINAR
|
Towards Green Campuses: Students’ Perceptions and Expectations
5th International Project and Construction Management Conference(IPCMC2018), 16 Kasım 2018, s. 859-866
TEZEL ECEM,UĞURAL MEHMET NURETTİN,GİRİTLİ FATMA HEYECAN
|
Comparison of Thermal Comfort and Energy Performance of Courtyard and Atrium Building Typologies by Different Climate Zones
6th Euro American Congress on Construction Pathology Rehabilitation Technology and Heritage Management, Rehabend 2016, Burgos/İSPANYA, 24 Mayıs 2016
YAŞA ENES
|
Hierarchy of Control Measures for Common Construction Activities: A Field Study
5th International Project and Construction Management Conference (IPCMC 2018), 16 Kasım 2018
UZUN MERT,BİLİR MAHÇİÇEK SENEM,GÜRCANLI GÜRKAN EMRE,ÇEBİ SELÇUK
|
The New Severity Scale of Occupational Accidents for Construction Projects
5th International Project and Construction Management Conference (IPCMC 2018), 16 Kasım 2018
BİLİR MAHÇİÇEK SENEM,GÜRCANLI GÜRKAN EMRE
|
Heavy Equipment Productivity Analysis by Monte Carlo Simulation and CYCLONE Method
5th International Project and Construction Management Conference (IPCMC 2018), 16 Kasım 2018
KÜÇÜKERDEN ÇAĞLA,TEMEL BETÜL,ORHAN ALİ RIZA,DURSUN ABDULLAH,GÜRCANLI GÜRKAN EMRE
|
Safe Work Statement for Construction Activities
6th International Project and Construction Management Conference (e-IPCMC2020), 12 Kasım 2020, s. 453-463
UZUN İBRAHİM MERT,GÜRCANLI GÜRKAN EMRE
|
Integrated Project Delivery (IPD) and Traditional Procurement Methods in Construction Industry-Towards a Team Based Approach
6th International Project and Construction Management Conference (e-IPCMC2020), 12 Kasım 2020, s. 1040-1050
ÜSTÜN PELİN,GÜRCANLI GÜRKAN EMRE
|
Investigation of Productivity in the Construction Industry
6th International Project and Construction Management Conference (e-IPCMC2020), 12 Kasım 2020, s. 641-644
BİLİR MAHÇİÇEK SENEM,GÜRCANLI GÜRKAN EMRE
|