ARAMA SONUÇLARI

Toplam 330 adet sonuçtan 20 tanesi görüntülenmektedir.

Arama









Yıllara göre arama

Özel Aralık Girişi

An integrated multi-criteria decision-making model for site selection of wave energy converters: a case study
Journal of Construction Engineering, Management & Innovation, Vol. 6, No. 3, Eylül 2023, s. 161-175, ISSN: 2630-5771
PİERRE ABDİ AYAN, SADIKOĞLU EMEL, TÜRKOĞLU HARUN, DAMCI ATİLLA, DEMİRKESEN ÇAKIR SEVİLAY, ARDİTİ DAVİD, KIRCA VEYSEL ŞADAN ÖZGÜR
Atilla Damcı Özgün Makale
A crashing-based time-cost trade-off model considering quality cost and contract clauses
International Journal of Construction Management, Vol. 23, No. 6, Haziran 2023, s. 954-963, ISSN: 1562-3599
AKIN FIRAT DOĞU, POLAT TATAR GÜL, TÜRKOĞLU HARUN, DAMCI ATİLLA
Harun Türkoğlu Özgün Makale
A crashing-based time-cost trade-off model considering quality cost and contract clauses
International Journal of Construction Management, Vol. 23, No. 6, Haziran 2023, s. 954-963, ISSN: 1562-3599
AKIN FIRAT DOĞU, POLAT TATAR GÜL, TÜRKOĞLU HARUN, DAMCI ATİLLA
Atilla Damcı Özgün Makale
Predicting Cost Impacts of Nonconformances in Construction Projects Using Interpretable Machine Learning
Journal of Construction Engineering and Management, Vol. 150, No. 1, Ocak 2024, ISSN: 0733-9364
KOÇ KERİM, BUDAYAN CENK, EKMEKCİOĞLU ÖMER, TOKDEMİR ONUR BEHZAT
Onur Behzat Tokdemir Özgün Makale
An integrative literature review on the causes of delays in construction projects: evidence from developing countries
International Journal of Construction Management, Vol. 24, No. 6, Haziran 2024, s. 610-622, ISSN: 1562-3599
SELCUK ONUR, TÜRKOĞLU HARUN, POLAT TATAR GÜL, HAJDU MİKLOS
Gül Polat Tatar Özgün Makale
The Current State of the Research on Building Facade Durability under the Effects of Climate Change
The 10th EuroAmerican Congress REHABEND 2024 on Construction Pathology, Rehabilitation Technology and Heritage Management, Gijon/İSPANYA, 7 Mayıs 2024, s. 480-488, ISSN: 2386-8198
KARAKUŞ ZAMBAK ÖZLEM, EDİS ECEM
Özlem Karakuş Zambak Tam metin bildiri
An integrated multi-criteria decision making approach for selecting the starting location of railroad projects
Engineering, Construction and Architectural Management, Ağustos 2024, ISSN: 0969-9988
TÜRKOĞLU HARUN,SADIKOĞLU EMEL,DEMİRKESEN ÇAKIR SEVİLAY,DAMCI ATİLLA,ACAR SERRA
Harun Türkoğlu Özgün Makale
A Performance-Based Subcontractor Selection Model
Journal of Construction Engineering and Management, Vol. 150, No. 8, Ağustos 2024, s. 1-14, ISSN: 0733-9364
BİNGÖL BEFRİN NEVAL,ARDİTİ DAVİD,POLAT TATAR GÜL
Gül Polat Tatar Özgün Makale
Mitigating delays and disputes in industrial construction projects: Lessons from a thermal power plant project in Turkey
Journal of Construction Engineering, Management and Innovation, Vol. 7, No. 2, Ocak 2024, ISSN: 2630-5771
GÜRCANLI GÜRKAN EMRE,ÇAPRAZ MERVE,ALP YAĞCI SELİN
Gürkan Emre Gürcanlı Özgün Makale
Artificial intelligence for digitalized construction project management during planning phase: A literature review
3rd International Graduate Research Symposium, İstanbul/TÜRKİYE, 8 Mayıs 2024
KARCI MAHMUT EMRE,ÇAKMAK FATMA PINAR
Fatma Pınar Çakmak Özet Bildiri
Vanishing heritage: Values of wooden minaret mosque Brezovača
Journal of Architecture, Planning and Construction Management, Vol. 7, No. 1, Temmuz 2018, ISSN: 2231-9514
KUDUMOVIC LANA
Comparison of Thermal Comfort and Energy Performance of Courtyard and Atrium Building Typologies by Different Climate Zones
6th Euro American Congress on Construction Pathology Rehabilitation Technology and Heritage Management, Rehabend 2016, Burgos/İSPANYA, 24 Mayıs 2016
YAŞA ENES
Enes Yaşa Tam metin bildiri
AUTOMATED DETECTION OF BUILDING ENVELOPE DEFECTS – A SYSTEMATIC REVIEW
REHABEND 2024 CONSTRUCTION PATHOLOGY, REHABILITATION TECHNOLOGY AND HERITAGE MANAGEMENT (10th REHABEND Congress), Gijón/İSPANYA, 7 Mayıs 2024, s. 497-506, ISSN: 2386-8198
ÖNAL HURİYE,EDİS FETHİYE ECEM
Fethiye Ecem Edis Tam metin bildiri
Predicting the Cost of Rework in High-Rise Buildings Using Graph Convolutional Networks
Journal of Construction Engineering and Management, Vol. 150, No. 8, Ağustos 2024, ISSN: 0733-9364
MOSTOFİ FATEMEH,TOKDEMİR ONUR BEHZAT,TOĞAN VEDAT,ARDİTİ DAVİD
Onur Behzat Tokdemir Özgün Makale
Managing the connection between project & organization levels: A case example of lessons learned practices in building projects
6th international Project and Construction Management Conference (IPCMC2020), İstanbul/TÜRKİYE, 20 Ekim 2022
OKULLU HALİM EMRE,ACAR EMRAH
Emrah Acar Tam metin bildiri
The effect of artificial neural networks on cost estimation in construction projects: A literature review
8th International Project and Construction Management Conference, 6 Haziran 2024
ŞERBETÇİOĞLU BOĞAÇHAN,ÇAKMAK FATMA PINAR
Fatma Pınar Çakmak Tam metin bildiri
Exploring the role of common data environment in BIM
8th International Project and Construction Management Conference, İstanbul/TÜRKİYE, 6 Haziran 2024
AKTÜRK BERKAY,ARISOY BATIKAN,ÇAKMAK FATMA PINAR
Fatma Pınar Çakmak Tam metin bildiri
Blockchain and smart contracts for payment and contract management in construction: A systematic review
6th Construction Blockchain Conference 2024: AI & Data Lifecycle, Londra/İNGİLTERE, 2 Kasım 2024
RAJABBASHA HANAN,ÇAKMAK FATMA PINAR
Fatma Pınar Çakmak Tam metin bildiri
A BIBLIOMETRIC REVIEW OF GLOBAL SCIENTIFIC RESEARCH TRENDS ON ARTIFICIAL INTELLIGENCE AND CONSTRUCTION MANAGEMENT FROM 1988 TO 2018
6th INTERNATIONAL CONFERENCE ON ENGINEERING NATURAL SCIENCES, URFA/TÜRKİYE, 24 Ocak 2020, s. 135-142
KULOĞLU ALİ FATİH,SAYGILI MURATHAN,TOKDEMİR ONUR BEHZAT
Onur Behzat Tokdemir Tam metin bildiri
H-BIM applications for vernacular architecture: a historic rural house case study in Bursa, Turkey
Engineering, Construction and Architectural Management, Vol. 30, No. 9, Kasım 2023, ISSN: 0969-9988
SAVAŞKAN MUSTAFA ONUR, ÖZENER OZAN ÖNDER
Ozan Önder Özener Özgün Makale

İLETİŞİM BİLGİLERİ

İstanbul Teknik Üniversitesi Rektörlüğü İTÜ Ayazağa Kampüsü Rektörlük Binası, Maslak-Sarıyer / İstanbul Tel: +90 212 285 3930