ARAMA SONUÇLARI

Toplam 28 adet sonuçtan 20 tanesi görüntülenmektedir.

Arama









Yıllara göre arama

Özel Aralık Girişi

Development of new empirical models for performance estimation of a raise boring machine
TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, Vol. 82, Aralık 2018, s. 428-441, ISSN: 0886-7798
SHATERPOUR MAMAGHANİ AYDIN, ÇOPUR HANİFİ, DOGAN ENGİN, ERDOGAN TAYFUN
Hanifi Çopur Özgün Makale
Rock mechanical aspects of excavation related to raise boring machine A typical example from Asikoy underground mine Kastamonu Turkey
EUROCK 2015, 7 Ekim 2015
SHATERPOUR MAMAGHANİ AYDIN,AVUNDUK EMRE,BİLGİN NUH
Emre Avunduk Tam metin bildiri
Performance of Raise Boring Machine (RBM) in Low to Moderately Hard Hornfels Rocks: A case Study of Efemcukuru Gold Mine in Turkey.
World Tunnel Congress, WTC2020, Kuala Lumpur/MALEZYA, 15 Mayıs 2020
SHATERPOUR MAMAGHANİ AYDIN, ÇOPUR HANİFİ, TUMAÇ DENİZ, BALCI CEMAL, ALTINTAŞ ERGÜN, ERDOĞAN TAYFUN
Hanifi Çopur Tam metin bildiri
Importance of physical-mechanical properties of rocks for application of a raise boring machine
World Tunnel Congress (WTC 2019), Napoli/İTALYA, 3 Mayıs 2019, s. 1136-1143
SHATERPOUR MAMAGHANİ AYDIN,ÇOPUR HANİFİ,DOĞAN ENGİN,ERDOĞAN TAYFUN
Hanifi Çopur Tam metin bildiri
Study of the impacts of geological-geotechnical parameters on the performance of raise boring machine (RBM) during pilot hole drilling
10th Asian Rock Mechanics Symposium “ARMS10”, 29 Ekim 2018
SHATERPOUR MAMAGHANİ AYDIN,ÇOPUR HANİFİ,DOĞAN ENGİN,ERDOĞAN TAYFUN
Hanifi Çopur Tam metin bildiri
Performance Evaluation of Raise Boring Machine (RBM) used in Balya Lead-Zinc Mine
4th International Underground Excavations Symposium, İstanbul/TÜRKİYE, 13 Eylül 2018, s. 317-325
ERDOĞAN TAYFUN,DOĞAN ENGİN,SHATERPOUR MAMAGHANİ AYDIN,ÇOPUR HANİFİ
Hanifi Çopur Tam metin bildiri
Raise Boring Machine performance in the Yusufeli Dam and HEPP Project
World Tunnel Congress 2017, Bergen/NORVEÇ, 9 Haziran 2017
SHATERPOUR MAMAGHANİ AYDIN,ÇOPUR HANİFİ,BİLGİN NUH,KOÇBAY AYHAN,ERDOĞAN TAYFUN
Hanifi Çopur Tam metin bildiri
Performance of Raise Boring Machine (RBM) in Low to Moderately Hard Hornfels Rocks: A case Study of Efemcukuru Gold Mine in Turkey
World Tunnel Digital Congress, 11 Eylül 2020
MAMAGHANİ AYDİN SHATERPOUR,ÇOPUR HANİFİ,TUMAÇ DENİZ,BALCI CEMAL,ALTİNTAS ERGUN,ERDOGAN TAYFUN
Cemal Balcı Tam metin bildiri

İLETİŞİM BİLGİLERİ

İstanbul Teknik Üniversitesi Rektörlüğü İTÜ Ayazağa Kampüsü Rektörlük Binası, Maslak-Sarıyer / İstanbul Tel: +90 212 285 3930