A Building Material Information System: BMIS – In the Context of CONNET-Turkey Project
Proceedings of the ECPPM 2004 - European Conference on Product and Process Modelling in the AEC Industry e-Work and eBusiness in AE, 8 Eylül 2004
TAŞ ELÇİN FİLİZ,TANAÇAN LEYLA,YAMAN HAKAN,DİKBAŞ HÜSEYİN ATİLLA
|
A Building Material Information System BMIS In the Context of CONNET Turkey Project
ECPPM 2004 – European Conference on Product and Process Modelling in the AEC Industry e–Work and eBusiness in AEC, İSTANBUL/TÜRKİYE, 8 Eylül 2004, s. 297-302
TAŞ ELÇİN FİLİZ,TANAÇAN LEYLA,YAMAN HAKAN,DİKBAŞ HÜSEYİN ATİLLA
|
Value stream mapping and benefit cost analysis application for value visibility of a pilot project on RFID investment integrated to a manual production control system a case study
The International Journal of Advanced Manufacturing Technology, Vol. 66, No. 5-8, Mayıs 2013, s. 987-1002, ISSN: 0268-3768
TABANLI RAMAZAN MURAT,TİJEN ERTAY
|
Construction Schedule Management and BIM: A Bibliometric Literature Review
6th International Project and Construction Management Conference (e-IPCMC 2020), İstanbul/TÜRKİYE, Vol. 1, No. 1, 12 Kasım 2020, s. 111-120
SARAÇ ÇIRACIOĞLU AYŞEN,YAMAN HAKAN
|
A BIM Based Automated Code Compliance Checking Conceptual Model Proposal for Housing Projects in Turkey
5th International Project and Construction Management Conference, Girne/KUZEY KIBRIS TÜRK CUMHURİYETİ, 16 Kasım 2018, s. 30-44
AYDIN MURAT
|
A Conceptual Perspevtive via Meta-Heuristic Optimization Algorithm for Resource Levelling in Project Networks
3. International Conference on Civil and Environmental Engineering, İzmir/TÜRKİYE, Vol. 2, No. 1, 24 Nisan 2018, s. 648-657
EBESEK ŞAFAK,YAMAN HAKAN
|
Japanese International Cooperation Agency (JICA) Project on “Improvements in Maritime Education and Training (MET) in Turkey
Oil Spill Management and Maritime Conventions, 2002
B. OZSOY-CICEK
|
Japanese International Cooperation Agency (JICA) Project on “Improvements in Maritime Education and Training (MET) in Turkey
Oil Spill Management and Maritime Conventions, 2002
B. OZSOY-CICEK
|
Modular vs. Parametric Design: Morphological Approaches for Kartal Urban Renewal Project in Istanbul
ISUF - 23rd International Seminar on Urban Form, 2016, s. 559-569
AYŞE SEMA KUBAT, EREN KÜRKÇÜOĞLU
|
Follow-up on Rubric-Based Assessment of Student Outcomes by Senior-Year Graduation Design Project and Continuing to Improve by Performance Indicator Breakdown-Based Assessment
International Journal of Engineering Pedagogy (iJEP), Nisan 2018
EBRU DULEKGURGEN, C. YANGIN-GOMEC, O. KARAHAN-OZGUN, B. AYDIN, H. GUVEN
|
Follow-up on Rubric-Based Assessment of Student Outcomes by Senior-Year Graduation Design Project and Continuing to Improve by Performance Indicator Breakdown-Based Assessment
Vol. 716, Mart 2018, Springer, Cham
E. DULEKGURGEN, C. YANGIN-GOMEC, O. KARAHAN OZGUN, B. AYDIN, H. GUVEN
|
Follow-up on Rubric-Based Assessment of Student Outcomes by Senior-Year Graduation Design Project and Continuing to Improve by Performance Indicator Breakdown-Based Assessment
Vol. 716, Mart 2018, Springer, Cham
E. DULEKGURGEN, C. YANGIN-GOMEC, O. KARAHAN OZGUN, B. AYDIN, H. GUVEN
|
Connecting two Continents: Marmaray Rail Transit Project of Istanbul
ICTI2010 - International Conference of Transport Infrastructures, 2011
C.A. KİREMİTCİ, P. ALPKOKİN, M. ERGUN, S. TOPUZ KİREMİTCİ
|
Connecting two Continents: Marmaray Rail Transit Project of Istanbul
ICTI2010 - International Conference of Transport Infrastructures, 2011
C.A. KİREMİTCİ, P. ALPKOKİN, M. ERGUN, S. TOPUZ KİREMİTCİ
|
Proposal of an Environment Sensitive House Project in the Reconstruction Process After the Marmara Earthquake at Degirmendere, Izmit
XXX IAHS World Congress on Housing Proceedings, 2002, s. Vol.2 949-957
Y. DOC. DR. ELCIN TAS, ARAS. GOR. OZCAN SARITAS, MIMAR ERSA KUDDE
|
Wastewater Management and Reuse in Mediterranean Countries: A Case Study on Turkish Urban Wastewater Treatment Plants
EMWater Project Regional Conference, Efficient Management of Wastewate, Kasım 2006
ARSLAN-ALATON I., OVEZ S., GUREL M., ISKENDER G., TANIK A., ORHON D.
|
Implementation of Project and Performance Based Approach for Achieving Architectural Design – Technology Integration
Architectural Education Forum IV, Mayıs 2009, s. On CD
OZGUR GOCER, ECEM EDIS, ERTAN OZKAN
|
An Interval Type 2 Fuzzy Prioritization Approach to Project Risk Assessment
Journal of Multiple-Valued Logic and Soft Computing, Vol. 26, No. 6, Mart 2016, s. 541-577, ISSN: 1542-3980
ASAN UMUT,SOYER AYBERK,BOZDAĞ CAFER ERHAN
|
The volcanic history and geodynamic evolution of Eastern Turkey geochemical geophysical and field evidence davetli konuşma
Lake Van Drilling Project, PaleoVan Workshop in Van, 1 Haziran 2006
KESKİN MEHMET
|
A Bibliographic Review of Internet of Things in the ConstructionIndustry
5th International Project and Construction Management Conference (IPCMC 2018), 16 Kasım 2018
SANAM REZAEİFAM,ERGEN PEHLEVAN ESİN,GÜNAYDIN HÜSNÜ MURAT
|