Overview of Currency Risks in Construction Projects
3. International Conference on Civil and Environmental Engineering, İzmir/TÜRKİYE, Vol. 1, No. 1, 24 Nisan 2018, s. 571-571
TÜZ ÖZLEM,YAMAN HAKAN
|
Detecting Unbalanced Bids via Improved Grading-based Model
Organization, Technology and Management in Construction: An International Journal, Mart 2020, ISSN: 1847-5450
POLAT TATAR GÜL,TÜRKOĞLU HARUN,DAMCI ATİLLA,AKIN FIRAT DOĞU
|
Construction of a Retrofit Green Roof System: A Case Study in İstanbul, Turkey
World Green Roof Congress 2010, LONDRA/İNGİLTERE, 15 Eylül 2010
ALTUN MEHMET CEM, GÖÇER CANER, TÜRKERİ AYŞE NİL
|
Construction of Non Enzymatic Hydrogen Peroxide Sensors By Exploiting the High Electrocatalytic Activity of Pd Ag Rgo Nanocomposites
229th Electrochemical Society Meeting, San Diego/AMERİKA BİRLEŞİK DEVLETLERİ, 29 Mayıs 2016
UZUNOĞLU AYTEKİN,SONG SİYİ,STANCİU LİA
|
Automated Identification of Vagueness in the FIDIC Silver Book Conditions of Contract
Journal of Construction Engineering and Management, Vol. 148, Ocak 2022, ISSN: 0733-9364
CANDAŞ ALİ BEDİİ, TOKDEMİR ONUR BEHZAT
|
Construction of a Peristaltic Micropump Integrated with a Flexible Dielectrophoretic Chip
International Eurasian Conference on Science, Engineering And Technology, 22 Kasım 2018
ERBAŞ BERKE,BİRTEK MEHMET TUĞRUL,TURHAN HATİCE,TRABZON LEVENT
|
Total Construction Duration Calculation of TOKI Housing Projects: A Case Study
International Graduate Research Symposium: IGRS’22, İstanbul/TÜRKİYE, Vol. 1, No. 1, 1 Haziran 2022, s. 50-50
TIRATACI HAKAN, YAMAN HAKAN
|
pHStat testing and geochemical modeling of inorganic compounds in recycled asphalt pavement used in highway shoulders
Construction and Building Materials, Vol. 313, Aralık 2021, s. 125407, ISSN: 0950-0618
SEYBOU-INSA OUSMANE, YALÇIN DAYIOĞLU ASLI, HOULİHAN MARGARET, AYDİLEK AHMET HALİT
|
Identification of Queries for Decision Making in BuildingOperation and Maintenance
5th International Project and Construction Management Conference (IPCMC 2018), 16 Kasım 2018
ARTAN DENİZ,YILMAZ NEZİHA,ERGEN PEHLEVAN ESİN
|
Construction of prediction intervals for Palmer Drought Severity Index using bootstrap
Journal of Hydrology, Vol. 559, No. 559, Aralık 2018, s. 461-470, ISSN: 0022-1694
BEYAZTAŞ UFUK,BİÇKİCİ ARIKAN BUĞRAYHAN,SERTDEMİR BESTE HAMİYE,KAHYA ERCAN
|
Evaluating the modes of communication a study of collaborative design in virtual worlds
Journal of Information Technology in Construction, Vol. 17, No. 1, Ocak 2012, s. 465-484, ISSN: 1745-20071752-7589
GÜL LEMAN FİGEN,WANG XİANGYU,ÇAĞDAŞ GÜLEN
|
Identification of Material-Related Risks in Green Buildings
Creative Construction Conference 2017, Primosten/HIRVATİSTAN, Vol. 196, 19 Haziran 2017, s. 956-963
POLAT TATAR GÜL, TÜRKOĞLU HARUN, GÜRGÜN ASLI PELİN
|
Determining the level of development for BIM implementation in large-scale projects A multi-case study
Engineering, Construction and Architectural Management, Vol. 28, No. 1, Şubat 2021, s. 397-423, ISSN: 0969-9988
ALSHORAFA RAİF, ERGEN PEHLEVAN ESİN
|
Virtual Worlds as a Constructivist Learning Platform Evaluations of 3D Virtual Worlds on Design Teaching and Learning
Journal of Information Technology in Construction, Vol. 13, No. 1, Ocak 2008, s. 578-593, ISSN: 1874-4753
GÜL LEMAN FİGEN,GU NİNG,WİLLİAMS TONY
|
Identification of Queries for Decision Making in BuildingOperation and Maintenance
5th International Project and Construction Management Conference (IPCMC 2018), 16 Kasım 2018
ARTAN DENİZ,YILMAZ NEZİHA,ERGEN PEHLEVAN ESİN
|
Augmented Time–Cost Trade-Off Optimization Using Particle Swarm Optimization
Journal of Construction Engineering and Management, Vol. 150, No. 5, Mayıs 2024, s. 1-13, ISSN: 0733-9364
TÜRKOĞLU HARUN, ARDİTİ DAVİD, POLAT TATAR GÜL
|
A crashing-based time-cost trade-off model considering quality cost and contract clauses
International Journal of Construction Management, Vol. 23, No. 6, Haziran 2023, s. 954-963, ISSN: 1562-3599
AKIN FIRAT DOĞU, POLAT TATAR GÜL, TÜRKOĞLU HARUN, DAMCI ATİLLA
|
Construction progress visualisation for varied stages of the individual elements with BIM: A case study
European Conference on Computing in Civil Engineering, 12 Haziran 2019
KAZADO DANİEL,KAVGİC MİROSLAVA,ERGEN PEHLEVAN ESİN
|
Progress on understanding debonding problems in reinforced concrete and steel members strengthened using FRP composites
Construction and Building Materials, Vol. 18, No. 1, Şubat 2004, s. 9-19, ISSN: 09500618
ORAL BUYUKOZTURK,GÜNEŞ OĞUZ,KARACA ERDEM
|
THE USE OF SENTINEL 1/2 VEGETATION INDEXES WITH GEE TIME SERIES DATA IN DETECTING LAND COVER CHANGES IN THE SINOP NUCLEAR POWER PLANT CONSTRUCTION SITE
XXIV ISPRS Congress (2021 edition), Nice/FRANSA, 5 Temmuz 2021
ÇOLAK EMRE, CHANDRA MADHU, SUNAR AYŞE FİLİZ
|