ARAMA SONUÇLARI

Toplam 151 adet sonuçtan 20 tanesi görüntülenmektedir.

Arama









Yıllara göre arama

Özel Aralık Girişi

Increasing construction project management knowledge area in Somali regional state in Ethiopia
LİSANSÜSTÜ EĞİTİM ENSTİTÜSÜ, İSTANBUL GEDİK ÜNİVERSİTESİ, 2021
ABDULLAHI OSMAN MUSE
Ahmet Güllü Tez Yüksek Lisans Tamamlandı
Construction project risk management under contingent circumstances: A case study during Ukraine-Russia war
LİSANSÜSTÜ EĞİTİM ENSTİTÜSÜ, İSTANBUL TEKNİK ÜNİVERSİTESİ, 2026
MUHAMMED ALİ ÇOLAK
Gürkan Emre Gürcanlı Tez Yüksek Lisans Tamamlandı
ORGANIZATIONAL STRUCTURE IN TEMPORARY PROJECT ORGANIZATIONS: IMPACTS ON PROJECT PERFORMANCE IN THE CONSTRUCTION INDUSTRY
LİSANSÜSTÜ EĞİTİM ENSTİTÜSÜ, İSTANBUL TEKNİK ÜNİVERSİTESİ, 2026
ECE GAMZE ŞENTUNA
Fatma Pınar Çakmak Tez Yüksek Lisans Tamamlandı
Project management procedure for the construction of cooled stores for drugs and medicine in Iraq
LİSANSÜSTÜ EĞİTİM ENSTİTÜSÜ, İSTANBUL GEDİK ÜNİVERSİTESİ, 2021
ABDULRASUL RAHAIF RADHI OGAILI
Ahmet Güllü Tez Yüksek Lisans Tamamlandı
Evaluating the Resilience of Graph Neural Network Architectures to Adversarial and Noisy Data in High-Stakes Construction Project Management
Journal of Construction Engineering and Management, Vol. 152, Nisan 2026, ISSN: 0733-9364
TOĞAN VEDAT,MOSTOFİ FATEMEH,TOKDEMİR ONUR BEHZAT
Onur Behzat Tokdemir Özgün Makale
A Multi-Criteria Decision-Making Approach for Curriculum Development inProject and Construction Management Graduate Programs
8th International Project and Construction Management Conference, İstanbul/TÜRKİYE, 6 Haziran 2024, s. 573-580
TEZEL ECEM,ÇAKMAK FATMA PINAR
Ecem Tezel Tam metin bildiri
Subcontractor Selection for a Construction Project: Optimal Plan
Journal of Construction Engineering and Management, Vol. 151, No. 12, Aralık 2025, ISSN: 0733-9364
BİNGÖL BEFRİN NEVAL,ARDİTİ DAVİD,POLAT TATAR GÜL
Gül Polat Tatar Özgün Makale
Rethinking Occupational Health and Safety Standards: As a Key to the OHS 4.0 in the Construction Industry
7th International Project and Construction Management Conference, Istanbul, İstanbul/TÜRKİYE, 20 Ekim 2022, s. 1421-1430
ERUSTA NUR EFŞAN,SERTYEŞİLIŞIK BEGÜM
Nur Efşan Erusta Tam metin bildiri
Agile methodologies in construction management: A review study on Scrum and Kanban
8th International Project and Construction Management Conference, İstanbul/TÜRKİYE, 6 Haziran 2024
TOSUN KIVANÇ,ÇAKMAK FATMA PINAR
Fatma Pınar Çakmak Tam metin bildiri
The effect of artificial neural networks on cost estimation in construction projects: A literature review
8th International Project and Construction Management Conference, 6 Haziran 2024
ŞERBETÇİOĞLU BOĞAÇHAN,ÇAKMAK FATMA PINAR
Fatma Pınar Çakmak Tam metin bildiri
Overview of Financed-Based Scheduling in Construction Management Research
7 th International Project and Construction Management Conference (IPCMC 2022), istanbul/TÜRKİYE, 20 Ekim 2022
AKIN FIRAT DOĞU, DAMCI ATİLLA, ARDİTİ DAVİD, DEMİRKESEN ÇAKIR SEVİLAY
Fırat Doğu Akın Tam metin bildiri
Mitigating delays and disputes in industrial construction projects: Lessons from a thermal power plant project in Turkey
Journal of Construction Engineering, Management and Innovation, Vol. 7, No. 2, Ocak 2024, ISSN: 2630-5771
GÜRCANLI GÜRKAN EMRE,ÇAPRAZ MERVE,ALP YAĞCI SELİN
Gürkan Emre Gürcanlı Özgün Makale
Turkish Architectural and Civil Engineering Education within the Scope of Sustainable Construction
5. International Project Construction Management Conference, Girne/KUZEY KIBRIS TÜRK CUMHURİYETİ, 16 Kasım 2018, s. 200-208
TOPAK FATİH,TOKDEMİR ONUR BEHZAT,PEKERİÇLİ MEHMET KORAY,TANYER ALİ MURAT
Onur Behzat Tokdemir Tam metin bildiri
Exploring the Adaptability of Daily Look-Ahead Meetings in the Construction Industry
6th International Project and Construction Management Conference (e-IPCMC2020), İstanbul/TÜRKİYE, 12 Kasım 2020, s. 1318-1325
YILMAZ ANIL,TOKDEMİR ONUR BEHZAT
Onur Behzat Tokdemir Tam metin bildiri
Total Construction Duration Calculation of TOKI Housing Projects: A Case Study
IPCMC 2022 - 7th International Project and Construction Management Conference, İSTANBUL/TÜRKİYE, 20 Ekim 2022, s. 204-215
TIRATACI HAKAN, YAMAN HAKAN
Hakan Yaman Tam metin bildiri
Currency Risk Analysis on Construction Cash Flows
IPCMC 2022 - 7th International Project and Construction Management Conference, İSTANBUL/TÜRKİYE, Vol. 1, No. 1, 20 Ekim 2022, s. 1138-1144
TÜZ ÖZLEM, YAMAN HAKAN
Hakan Yaman Tam metin bildiri
The Turkish Construction Sector from a Macroeconomic Perspective
IPCMC 2022 - 7th International Project and Construction Management Conference, İSTANBUL/TÜRKİYE, Vol. 1, No. 1, 20 Ekim 2022, s. 545-562
BÜYÜKYORAN FARUK, YAMAN HAKAN
Hakan Yaman Tam metin bildiri
A Proposed Model for Estimation of Ideal Construction Duration in Housing Projects
IPCMC 2022 - 7th International Project and Construction Management Conference, İSTANBUL/TÜRKİYE, Vol. 1, No. 1, 20 Ekim 2022, s. 216-231
TIRATACI HAKAN, YAMAN HAKAN
Hakan Yaman Tam metin bildiri
Evaluation of Construction and Demolition Wastes in the Context of the Waste Framework Directive of the European Union Member States
7th International Project and Construction Management Conference (IPCMC2022), İstanbul/TÜRKİYE, 21 Ekim 2022
SÖNMEZ NURŞEN, MAÇKA KALFA SİBEL
Nurşen Sönmez Tam metin bildiri
Construction Schedule Management and BIM: A Bibliometric Literature Review
6th International Project and Construction Management Conference (e-IPCMC 2020), İstanbul/TÜRKİYE, Vol. 1, No. 1, 12 Kasım 2020, s. 111-120
SARAÇ ÇIRACIOĞLU AYŞEN,YAMAN HAKAN
Hakan Yaman Tam metin bildiri

İLETİŞİM BİLGİLERİ

İstanbul Teknik Üniversitesi Rektörlüğü İTÜ Ayazağa Kampüsü Rektörlük Binası, Maslak-Sarıyer / İstanbul Tel: +90 212 285 3930