ARAMA SONUÇLARI

Toplam 188 adet sonuçtan 20 tanesi görüntülenmektedir.

Arama









Yıllara göre arama

Özel Aralık Girişi

REVISITING THE RD PROJECT MANAGEMENT METHODOLOGIES FOR DEFENSE R&D PROJECTS: AN AHPBASED MULTI-CRITERIA METHODOLOGY SELECTION MODEL PROPOSAL
American Society for Engineering Management 2023 International Annual Conference, Denver Colorado/AMERİKA BİRLEŞİK DEVLETLERİ, 25 Ekim 2023
YAŞAR ŞEYDA, YILDIRIM NİHAN
Nihan Yıldırım Tam metin bildiri
A brief summary on facilities management technologies and BIM-FM integration
7th International Project and Construction Management Conference, İstanbul/TÜRKİYE, 20 Ekim 2022, s. 811-820
TEZEL ECEM, GİRİTLİ FATMA HEYECAN
Ecem Tezel Tam metin bildiri
Integrating Facilities Management Data in Building InformationModelling
5th International Project and Construction Management Conference (IPCMC 2018), 16 Kasım 2018
KULA BEHLÜL,GÜVEN IŞIN GÜRŞANS,ARTAN DENİZ,ERGEN PEHLEVAN ESİN
Deniz Artan Tam metin bildiri
Datum Transformations of The Local Basemaps of Rize For Rabis Rize Disaster Management System Project
International Emergency Management Society, 15th TIEMS Annual Cenference-TIEMS2008, Prague/ÇEK CUMHURİYETİ, 17 Haziran 2008
ALTIN UĞUR M,ALKAN REHA METİN,YAVAŞOĞLU HASAN HAKAN,ŞAHİN MUHAMMED,TARI ERGİN,YANALAK MUSTAFA,ARSLAN ERSOY,ÜNEN HÜSEYİN CAN
Mustafa Yanalak Tam metin bildiri
Wastewater Management and Reuse in Mediterranean Countries: A Case Study on Turkish Urban Wastewater Treatment Plants
EMWater Project Regional Conference, Efficient Management of Wastewate, Kasım 2006
ARSLAN-ALATON I., OVEZ S., GUREL M., ISKENDER G., TANIK A., ORHON D.
Melike Gürel Bildiri
Construction Schedule Management and BIM: A Bibliometric Literature Review
6th International Project and Construction Management Conference (e-IPCMC 2020), İstanbul/TÜRKİYE, Vol. 1, No. 1, 12 Kasım 2020, s. 111-120
SARAÇ ÇIRACIOĞLU AYŞEN,YAMAN HAKAN
Hakan Yaman Tam metin bildiri
Fuzzy Earned Value Analysis in Project Management
International Conference on Fuzzy Systems & Soft Computational Intelligence in Management and Industrial Engineering, 28 Mayıs 2002, s. 260-268
ÇALIŞIR FETHİ,KAHRAMAN CENGİZ
Fethi Çalışır Tam metin bildiri
State-of-the-art review on information requirements for facilities management
6th International Project and Construction Management Conference, İSTANBUL/TÜRKİYE, 12 Kasım 2020, s. 121-132
TEZEL ECEM,HARTY CHRIS,GİRİTLİ FATMA HEYECAN
Ecem Tezel Tam metin bildiri
Identification of Queries for Decision Making in Building Operation and Maintenance
IPCMC2018, 5th International Project and Construction Management Conference, 16 Kasım 2018
ARTAN DENİZ, YILMAZ NEZİHA, ERGEN PEHLEVAN ESİN
Integrating Facilities Management Data in Building InformationModelling
5th International Project and Construction Management Conference (IPCMC 2018), 16 Kasım 2018
KULA BEHLÜL,GÜVEN IŞIN GÜRŞANS,ARTAN DENİZ,ERGEN PEHLEVAN ESİN
Esin Ergen Pehlevan Tam metin bildiri
Modeling the Effects of Project Canal Istanbul on the Urban Extent and Hydrological Response of Ayamama Watershed, Istanbul
WORLD ENVIRONMENTAL AND WATER RESOURCES CONGRESS 2017: WATERSHED MANAGEMENT, IRRIGATION AND DRAINAGE, AND WATER RESOURCES PLANNING AND MANAGEMENT, 21 Mayıs 2017
NİGUSSİE TEWODROS ASSEFA,ALTUNKAYNAK ABDÜSSELAM
Abdüsselam Altunkaynak Tam metin bildiri
Classification Of Construction Waste According To Lean Management Approach
6th International Project and Construction Management e-Conference (e-IPCMC-2020), İstanbul/TÜRKİYE, Vol. 1, No. 1, 12 Kasım 2020, s. 143-150
CAN GİZEM,TAŞ ELÇİN FİLİZ
Elçin Filiz Taş Tam metin bildiri
Change in Occupational Health and Safety Management System: ISO 45001:2018
5th International Project and Construction Management Conference (IPCMC 2018), 16 Kasım 2018
UZUN MERT,BİLİR MAHÇİÇEK SENEM,GÜRCANLI GÜRKAN EMRE
Gürkan Emre Gürcanlı Tam metin bildiri
Safe Work Statement for Construction Activities
6th International Project and Construction Management Conference (e-IPCMC2020), 12 Kasım 2020, s. 453-463
UZUN İBRAHİM MERT,GÜRCANLI GÜRKAN EMRE
Gürkan Emre Gürcanlı Tam metin bildiri
Occupationally Safer Designs in Construction Industry: BIM Based Solution Method
5th International Project and Construction Management Conference (IPCMC 2018), 16 Kasım 2018
TOZER KEMAL DİRGEN,ÇELİK TAHİR,GÜRCANLI GÜRKAN EMRE
Gürkan Emre Gürcanlı Tam metin bildiri
Integrated Project Delivery (IPD) and Traditional Procurement Methods in Construction Industry-Towards a Team Based Approach
6th International Project and Construction Management Conference (e-IPCMC2020), 12 Kasım 2020, s. 1040-1050
ÜSTÜN PELİN,GÜRCANLI GÜRKAN EMRE
Gürkan Emre Gürcanlı Tam metin bildiri
Investigation of Productivity in the Construction Industry
6th International Project and Construction Management Conference (e-IPCMC2020), 12 Kasım 2020, s. 641-644
BİLİR MAHÇİÇEK SENEM,GÜRCANLI GÜRKAN EMRE
Gürkan Emre Gürcanlı Tam metin bildiri
Relative Importance of Productivity Factors in Construction Industry
6th International Project and Construction Management Conference (e-IPCMC2020), 12 Kasım 2020, s. 645-650
BİLİR MAHÇİÇEK SENEM,GÜRCANLI GÜRKAN EMRE
Gürkan Emre Gürcanlı Tam metin bildiri
Use Of The Design Structure Matrix During The Construction Phase Of Building Production Process In Turkey
6th International Project and Construction Management e-Conference (e-IPCMC-2020), istanbul/TÜRKİYE, Vol. 1, No. 1, 12 Kasım 2020, s. 248-256
BUĞAN JİBİD,TAŞ ELÇİN FİLİZ
Elçin Filiz Taş Tam metin bildiri
Hierarchy of Control Measures for Common Construction Activities: A Field Study
5th International Project and Construction Management Conference (IPCMC 2018), 16 Kasım 2018
UZUN MERT,BİLİR MAHÇİÇEK SENEM,GÜRCANLI GÜRKAN EMRE,ÇEBİ SELÇUK
Gürkan Emre Gürcanlı Tam metin bildiri

İLETİŞİM BİLGİLERİ

İstanbul Teknik Üniversitesi Rektörlüğü İTÜ Ayazağa Kampüsü Rektörlük Binası, Maslak-Sarıyer / İstanbul Tel: +90 212 285 3930