ARAMA SONUÇLARI

Toplam 160 adet sonuçtan 20 tanesi görüntülenmektedir.

Arama









Yıllara göre arama

Özel Aralık Girişi

Utilization Of DSM In Design Phase Of IPD Projects: A Case Study
6th.International Project and Construction Management e-Conference (e-IPCMC-2020), İstanbul/TÜRKİYE, Vol. 1, No. 1, 12 Kasım 2020, s. 495-504
ÇİLELİ ELİF,TAŞ ELÇİN FİLİZ
Elçin Filiz Taş Tam metin bildiri
The Evaluation Of Turkish Contractors’xx Views After Mandatory Mediation In Turkish Construction Sector
6th International Project and Construction Management e-Conference (e-IPCMC-2020), İstanbul/TÜRKİYE, Vol. 1, No. 1, 12 Kasım 2020, s. 401-409
ARICI ÜSTÜNER YAPRAK,TAŞ ELÇİN FİLİZ
Elçin Filiz Taş Tam metin bildiri
Civil engineers’ personal values/demographics linkage in project team building
Engineering, Construction and Architectural Management, Vol. 24, No. 6, Kasım 2017, s. 1337-1349, ISSN: 0969-9988
DAMCI ATİLLA,ARDİTİ DAVİD,POLAT TATAR GÜL
Atilla Damcı Özgün Makale
Construction Project Managers’ Motivators and Human Values
Journal of Construction Engineering and Management, Vol. 143, No. 4, Nisan 2017, s. 4016115, ISSN: 0733-9364
WANG DI,ARDITI DAVID,DAMCI ATİLLA
Atilla Damcı Özgün Makale
Effect of organizational culture on delay in construction
International Journal of Project Management, Vol. 35, No. 2, Şubat 2017, s. 136-147, ISSN: 02637863
ARDITI DAVID,NAYAK SHRUTI,DAMCI ATİLLA
Atilla Damcı Özgün Makale
Development and Application of a Rubric Specific for the Senior-Year Graduation Design Projects for Assessing Learning Outcomes
Iberoamerican Journal of Project Management, Vol. 7, No. 1, Ocak 2016, s. 47-61, ISSN: 2346-9161
GÖMEÇ ÇİĞDEM,KÖSE MUTLU BÖRTE,DÜLEKGÜRGEN EBRU,TANIK AYŞEGÜL,ÖZTÜRK İZZET
An Integrated Approach for HVAC-AHU System Selection in Green Projects
5th international Project and Construction Management Conference (IPCMC2018), 16 Kasım 2018
BAYHAN HASAN GÖKBERK,POLAT TATAR GÜL,TÜRKOĞLU HARUN,ERTURK FATMA OLCAY,GOKTAS BULENT,ARİSOY MEHMET BATİKAN
Harun Türkoğlu Tam metin bildiri
An Integrated Multi-Attribute-Decision-Making Approach for Main Contractor Selection: A Case Study
5th international Project and Construction Management Conference (IPCMC2018), 16 Kasım 2018
POLAT TATAR GÜL,TÜRKOĞLU HARUN,OZDEN UMUR,DAMCI ATİLLA
Harun Türkoğlu Tam metin bildiri
Evaluation of Energy and Atmosphere Credit Achievements of LEED-Certified Buildings in Turkey
5th international Project and Construction Management Conference (IPCMC2018), 16 Kasım 2018
POLAT TATAR GÜL,TÜRKOĞLU HARUN,YİKİLMAZ NAZ,DAMCI ATİLLA
Harun Türkoğlu Tam metin bildiri
Usability and functionality A comparison of project managers and potential users evaluations
IEEE International Conference on Industrial Engineering and Engineering Management, 9 Aralık 2009, s. 2019-2023
BAYRAKTAROĞLU AYŞE ELVAN,ÇALIŞIR FETHİ,ALTIN GÜMÜŞSOY ÇİĞDEM
Çiğdem Altın Gümüşsoy Tam metin bildiri
Towards Green Campuses: Students’ Perceptions and Expectations
5th International Project and Construction Management Conference(IPCMC2018), 16 Kasım 2018, s. 859-866
TEZEL ECEM,UĞURAL MEHMET NURETTİN,GİRİTLİ FATMA HEYECAN
Ecem Tezel Tam metin bildiri
Earthquake Landslide and Flood disaster Prevention The SciNetNatHaz Project
Frontiers in Environmental and Water Management 2015, Kavala/YUNANİSTAN, 19 Mart 2015
PAPATHEODOROU KONSTANTİNOS,TZANOU ELENA,MAFTEİ CARMEN,KIRCA VEYSEL ŞADAN ÖZGÜR,AKSOY HAFZÜLLAH
Development and Application of a Rubric Specific for the Senior Year Graduation Design Projects for Assessing Learning Outcomes
Iberoamerican Journal of Project Management, Buenos Aires/ARJANTİN, Vol. 7, No. 1, Haziran 2016, s. 47-61, ISSN: 2346-9161
GÖMEÇ ÇİĞDEM,KÖSE MUTLU BÖRTE,DÜLEKGÜRGEN EBRU,ÖZTÜRK İZZET,TANIK AYŞEGÜL
Ebru Dülekgürgen Özgün Makale
Civil engineers’ personal values/demographics linkage in project team building
Engineering, Construction and Architectural Management, Vol. 24, No. 6, Kasım 2017, s. 1337-1349, ISSN: 0969-9988
DAMCI ATİLLA,ARDİTİ DAVİD,POLAT TATAR GÜL
Gül Polat Tatar Özgün Makale
Development and application of a rubric specific for the senior year Graduation Design Projects for assessing learning outcomes
Iberoamerican Journal of Project Management, Buenos Aires/ARJANTİN, Vol. 7, No. 1, Haziran 2016, s. 47-61, ISSN: 2346-9161
GÖMEÇ ÇİĞDEM,MUTLU BÖRTE,DÜLEKGÜRGEN EBRU,ÖZTÜRK İZZET,TANIK AYŞEGÜL
Çiğdem Gömeç Özgün Makale
The interplay between leadership and organizational culture in the Turkish construction sector
International Journal of Project Management, Vol. 31, No. 2, Şubat 2013, s. 228-238, ISSN: 02637863
ÖNEY YAZICI ELA,GİRİTLİ FATMA HEYECAN,ACAR EMRAH,ORAZ GÜLFER
Emrah Acar Özgün Makale
Identification of Queries for Decision Making in BuildingOperation and Maintenance
5th International Project and Construction Management Conference (IPCMC 2018), 16 Kasım 2018
ARTAN DENİZ,YILMAZ NEZİHA,ERGEN PEHLEVAN ESİN
Esin Ergen Pehlevan Tam metin bildiri
Assessment of the Capabilities of Commercial Tools to Develop4D/5D Models
5th International Project and Construction Management Conference (IPCMC 2018), 16 Kasım 2018
YEŞİLYURT MUSTAFA,ERGEN PEHLEVAN ESİN
Esin Ergen Pehlevan Tam metin bildiri
A Critical Review of Post-Occupancy Evaluation (POE) Tools
5th International Project and Construction Management Conference (IPCMC2018), 16 Kasım 2018
ARTAN DENİZ,ERGEN PEHLEVAN ESİN,DÖNMEZ DENİZ,TEKÇE IŞILAY
Esin Ergen Pehlevan Tam metin bildiri
BIM Adoption in Metro Projects: Challenges and LessonsLearned
5th International Project and Construction Management Conference (IPCMC 2018), 16 Kasım 2018
KAZAZ BİLLUR,ALEMDAR A SİNAN,MURTEZA MUSTAFA,ERGEN PEHLEVAN ESİN
Esin Ergen Pehlevan Tam metin bildiri

İLETİŞİM BİLGİLERİ

İstanbul Teknik Üniversitesi Rektörlüğü İTÜ Ayazağa Kampüsü Rektörlük Binası, Maslak-Sarıyer / İstanbul Tel: +90 212 285 3930