A hierarchical goal programming model for scheduling the outpatient clinics
EXPERT SYSTEMS WITH APPLICATIONS, Vol. 40, No. 12, Eylül 2013, s. 4906-4914, ISSN: 0957-4174
GÜLER MEHMET GÜRAY
|
THE EFFECTS OF UNFORESEEN CHANGES IN AGGREGATED LOAD SCHEDULING ON TRANSMISSION SYSTEM OPERATION
16th International Conference on Clean Energy (ICCE-2018), Famagusta/KUZEY KIBRIS TÜRK CUMHURİYETİ, 9 Mayıs 2018
BAĞRIYANIK FATMA GÜL,BAĞRIYANIK MUSTAFA,DAĞ HASAN
|
Dynamic-Structure Resource Block Allocation Based Scheduling for 5G Systems
2022 IEEE 95th Vehicular Technology Conference (VTC2022-SPRING), Helsinki/FİNLANDİYA, 19 Haziran 2022, s. 1-5
JARADAT AHMAD M., SAĞLAM MEHMET İZZET, KARTAL MESUT, ARSLAN HÜSEYİN
|
Optimal scheduling algorithms for communication constrained parallel processing
EURO-PAR 2002 PARALLEL PROCESSING, PROCEEDINGS, Vol. 2400, No. null, 2002, s. 197-206
ALTILAR DENİZ TURGAY,PAKER YAKUP
|
A priority based genetic algorithm for a flexible job shop scheduling problem
Journal of Industrial and Management Optimization, Vol. 12, No. 4, Ekim 2016, s. 1391-1415, ISSN: 1547-5816
ÇINAR ÜNAL DİDEM,ANTONIO OLIVEIRA JOSE,TOPCU YUSUF İLKER,PARDALOS PANOS M
|
Efficient shift scheduling in the retail sector through two stage optimization
European Journal of Operational Research, Vol. 184, No. 1, Ocak 2008, s. 76-90, ISSN: 03772217
KABAK ÖZGÜR,ÜLENGİN FUSUN,AKTAŞ EMEL,ÖNSEL EKİCİ ŞULE,TOPCU YUSUF İLKER
|
A Pre-Emptive Scheduling Mechanism for Service Assurance of Network Slicing in Next Generation Cellular Networks
IEEE Access, Vol. 13, Ocak 2025, ISSN: 2169-3536
ENGİN EGE,HÖKELEK İBRAHİM,GÖRÇİN ALİ,ÇIRPAN HAKAN ALİ
|
An Event-Based Continuous-Time MILP for ShortTerm Crude Oil Scheduling
33rd European Symposium on Computer Aided Process Engineering (ESCAPE33), Atina/YUNANİSTAN, Vol. 52, 18 Haziran 2023, s. 727-732
MARTTİN İREM, KURBAN SENA, KUŞOĞLU KAYA GİZEM, KABAK ÖZGÜR, TOPCU YUSUF İLKER
|
A two phase approach based on multi-objective programming and simulation for physician scheduling in emergency rooms
International Journal of Applied Decision Sciences, Vol. 17, Ocak 2024, s. 36-59, ISSN: 1755-8077
YANMAZ ÖZGÜR, KABAK ÖZGÜR
|
Real Time Auction Based Allocation of Tasks for Multi Robot Exploration Problem in Dynamic Environments
AAAI-05 Workshop on Integrating Planning into Scheduling, Menlo Park/AMERİKA BİRLEŞİK DEVLETLERİ, 9 Temmuz 2005, s. 27-33
SARIEL SANEM,BALCH TUCKER
|
A New MILP Formulation for Scheduling of Crude Oil Operations
The 32nd European Symposium on Computer-Aided Process Engineering (ESCAPE-32), Toulouse/FRANSA, Vol. 1, 12 Haziran 2022, s. 991-996
DÖLOĞLU PELİN, KURBAN SENA, MARTTİN İREM, ATAMAN NAZLI, KUŞOĞLU KAYA GİZEM, İŞERİ FUNDA, KABAK ÖZGÜR, TOPCU YUSUF İLKER
|
Physician Scheduling Problem in an Emergency Department of a Public Hospital
24th International Conference on Multiple Criteria Decision Making (MCDM 2017), Ottawa/KANADA, 10 Temmuz 2017, s. 39-40
YANMAZ ÖZGÜR,KABAK ÖZGÜR
|
Efficient shift scheduling in the retail sector through two stage optimization
European Journal of Operational Research, Vol. 184, No. 1, Ocak 2008, s. 76-90, ISSN: 03772217
KABAK ÖZGÜR,ÜLENGİN FUSUN,AKTAŞ EMEL,ÖNSEL EKİCİ ŞULE,TOPCU YUSUF İLKER
|
Delay Risk Assessment of Repetitive Construction Projects Using Line-of-Balance Scheduling and Monte Carlo Simulation
Journal of Construction Engineering and Management, Vol. 145, No. 2, Şubat 2019, ISSN: 0733-9364
TOKDEMİR ONUR BEHZAT, EROL HÜSEYİN, DİKMEN TOKER İREM
|
Scheduling Asphalt Highway Construction Operations Using the Combination of Line of Balance and Discrete Event Simulation Techniques
Industrial Engineering and Engineering Management Conference, 8 Aralık 2009
POLAT TATAR GÜL,BÜYÜKSARAÇOĞLU YALÇIN,DAMCI ATİLLA
|
Resource Leveling of Railway Track Construction Operations Using the Linear Scheduling and Genetic Algorithm Techniques
International Conference on Construction and Real Estate Management, BRISBANE/AVUSTRALYA, Vol. 1, 1 Aralık 2010, s. 105-110
DAMCI ATİLLA,POLAT TATAR GÜL
|
Resource Leveling in Line of Balance Scheduling
Computer-Aided Civil and Infrastructure Engineering, Vol. 28, No. 9, Ekim 2013, s. 679-692, ISSN: 10939687
DAMCI ATİLLA,ARDITI DAVID,POLAT TATAR GÜL
|
Revisiting the concept of natural rhythm of production in line of balance scheduling
International Journal of Construction Management, Vol. 22, No. 12, Temmuz 2022, s. 2335-2344, ISSN: 1562-3599","2331-2327
DAMCI ATİLLA
|
Impacts of different objective functions on resource leveling in Line of Balance scheduling
KSCE Journal of Civil Engineering, Vol. 20, No. 1, Ocak 2016, s. 58-67, ISSN: 1226-7988
DAMCI ATİLLA,ARDITI DAVID,POLAT TATAR GÜL
|
Multiresource Leveling in Line of Balance Scheduling
Journal of Construction Engineering and Management, Vol. 139, No. 9, Eylül 2013, s. 1108-1116, ISSN: 0733-9364
DAMCI ATİLLA,ARDITI DAVID,POLAT TATAR GÜL
|