Intersection Between Engineering and Architecture
28 th. Engineering Education Symposium 1999, Engineering Education in , 2008, s. 322-327
Y. DOC. DR. LEYLA TANACAN, Y. DOC. DR. ELCIN TAS
|
LEAN CONSTRUCTION AND THE 31 IMPOR TANCE OF BIM IN LEAN CONSTRUCTION PRACTICES SUSTAINABLE CURRENT APPROACHES IN ARCHITECTURAL SCIENCE AND TECHNOLOGY
LYON/FRANSA, 2022, s. 31-66, LIVRE DE LYON
TOKAT ALPER, TAŞ ELÇİN FİLİZ
|
Evaluation of the Standart Contract Forms in Turkey
COBRA 2011 RICS Construction and Property Conference, Eylül 2011, s. 112-11293
ARAS.GOR. PINAR IRLAYICI CAKMAK, DOC. DR. ELCIN TAS
|
The Changes in the Use of IT on Building Product Information in the Turkish Construction Industry
ICLTIM International Conference on Leadership, Technology and Innovati, Kasım 2013
DOC. DR. ELCIN TAS, ARAS. GOR. PINAR CAKMAK
|
Computer Aided Theoretical Courses in Architectural Education: Building Material Information System
ICECE 2000, International Conference on Engineering and Computer Educa, 2008, s. CD olarak yayınlanmıştır
Y. DOC. DR. LEYLA TANACAN, Y. DOC. DR. ELCIN TAS, Y. DOC. DR. HAKAN YAMAN
|
Performance Forecasting Methods in Construction Industry Deterministic Approach,
6th International Project and Construction Management e-Conference (e-IPCMC-2020), İstanbul/TÜRKİYE, Vol. 1, No. 1, 12 Kasım 2020, s. 151-161
YAYLALI RÜÇHAN,TAŞ ELÇİN FİLİZ
|
An Assesment Of Lean And Agile Principles In Building Life Cycle Phases
, 6th International Project and Construction Management e-Conference (e-IPCMC-2020), İstanbul/TÜRKİYE, Vol. 1, No. 1, 12 Kasım 2020, s. 1279-193
TAŞ ELÇİN FİLİZ,BUĞAN JİBİD,TÜRKYILMAZ AYNUR HÜRRİYET,BAYLAR KIZILKAYA ŞENNUR,BOZDEMİR SERCAN,AKACALI GÜL ZİBA,ERGİN ASLIHAN,AKIN FIRAT DOĞU,ŞİMŞEK EKİN
|
Toplu Konutlarda Kullanım Maliyeti Hesaplanmasına ve Tahminine Yönelik Yaklaşımlar
Türkiye’de Son 10 Yılda Toplu Konut Uygulamaları Sempozyumu,, 2008, s. 163-170
PROF. DR. I.ORHON, ARAS. GOR. ELCIN TAS
|
A Case Study on the Strategic Impact of Information Technology in the Turkish Construction Industry
CIB W078 International Conference on Managing IT in Construction, Ekim 2009, s. 431-437
ARAS. GOR. PINAR IRLAYICI, DOC. DR. ELCIN TAS
|
Building Material Information Systems On The World Wide Web
InterSymp–99 International Conference on Systems Research, Informatics, 1999, s. 147-156
Y. DOC. DR. ELCIN TAS, Y. DOC. DR. LEYLA TANACAN, Y. DOC. DR. HAKAN YAMAN
|
Building Materials Information System as an Architectural Education Tool
ITHET 2000, International Conference on International Technology Based, 2008, s. 75-80
Y. DOC. DR. ELCIN TAS, Y. DOC. DR. HAKAN YAMAN, Y. DOC. DR. LEYLA TANACAN
|
Yüklenici İnşaat İşletmeleri İçin Finansal Planlama Aşamasında Risk ve Belirsizliklerin Önemi
1.Yapı İşletmesi Kongresi, 2008, s. 225-241
ARAS. GOR. DR. ELCIN TAS
|
Developing of Risk Management System for Constractor Firm in Turkey
Safety, Risk and Reliability – Trends in Engineering International Con, Mart 2001, s. 427-428
Y. DOC. DR. ELCIN TAS
|
Use Of The Design Structure Matrix During The Construction Phase Of Building Production Process In Turkey
6th International Project and Construction Management e-Conference (e-IPCMC-2020), istanbul/TÜRKİYE, Vol. 1, No. 1, 12 Kasım 2020, s. 248-256
BUĞAN JİBİD,TAŞ ELÇİN FİLİZ
|
Factors Affacting Cost Overrun Rate
International Symposium on Economic Evaluation and The Built Environme, 1993, s. 37-44
PROF. DR. HEYECAN GIRITLI, ARAS. GOR. DR. ELCIN TAS, MIMAR PINAR ESME
|
Control and Liability in the Construction Industry
Organizacija Gradenja Organisation and Management in Construction, 1991, s. 575-580
PROF. DR. HEYECAN GIRITLI, ARAS. GOR. ELCIN TAS
|
İnşaat Sektöründe Kullanılan KİK ve Standart Sözleşme Dokümanlarının Karşılaştırılması
2. Proje ve Yapım Yönetimi Kongresi, Eylül 2012, s. 211-223
ARAS.GOR. PINAR IRLAYICI CAKMAK, DOC. DR. ELCIN TAS
|
Proposal of an Environment Sensitive House Project in the Reconstruction Process After the Marmara Earthquake at Degirmendere, Izmit
XXX IAHS World Congress on Housing Proceedings, 2002, s. Vol.2 949-957
Y. DOC. DR. ELCIN TAS, ARAS. GOR. OZCAN SARITAS, MIMAR ERSA KUDDE
|
Examining Of One Of The Agile Project Management Practices: Scrum In Turkish Construction Industry
6th International Project and Construction Management e-Conference (e-IPCMC-2020), İstanbul/TÜRKİYE, Vol. 1, No. 1, 12 Kasım 2020, s. 276-286
CESUR MELİKE,TAŞ ELÇİN FİLİZ
|
Utilization Of DSM In Design Phase Of IPD Projects: A Case Study
6th.International Project and Construction Management e-Conference (e-IPCMC-2020), İstanbul/TÜRKİYE, Vol. 1, No. 1, 12 Kasım 2020, s. 495-504
ÇİLELİ ELİF,TAŞ ELÇİN FİLİZ
|