ARAMA SONUÇLARI

Toplam 2627 adet sonuçtan 20 tanesi görüntülenmektedir.

Arama









Yıllara göre arama

Özel Aralık Girişi

A comparative input output analysis of the construction sector in Turkey and EU countries
Engineering, Construction and Architectural Management, Vol. 18, No. 3, Mayıs 2011, s. 248-265, ISSN: 0969-9988
İLHAN BAHRİYE,YAMAN HAKAN
Hakan Yaman Özgün Makale
A building cost estimation model based on cost significant work packages
Engineering, Construction and Architectural Management, Vol. 12, No. 3, Haziran 2005, s. 251-263, ISSN: 0969-9988
TAŞ ELÇİN FİLİZ,YAMAN HAKAN
Hakan Yaman Özgün Makale
Information management roles in real estate development lifecycle: literature review on BIM and IPD framework
Construction Innovation, Vol. 21, Ekim 2021, s. 723-742, ISSN: 14770857 14714175
BİLGE EYMEN ÇAĞATAY, YAMAN HAKAN
Hakan Yaman Özgün Makale
A Multi Agent Systems Based Contractor Pre Qualification Model
Journal of Engineering, Construction and Architectural Management, Vol. 23, No. 6, Kasım 2016, s. 709-726, ISSN: 0969-9988
KOĞ FAİKCAN,YAMAN HAKAN
Hakan Yaman Özgün Makale
The Turkish Construction Sector from a Macroeconomic Perspective
IPCMC 2022 - 7th International Project and Construction Management Conference, İSTANBUL/TÜRKİYE, Vol. 1, No. 1, 20 Ekim 2022, s. 545-562
BÜYÜKYORAN FARUK, YAMAN HAKAN
Hakan Yaman Tam metin bildiri
A Meta Analysis Study for BIM Based Automated Code Compliance Checking
IPCMC2018 - 5th International Project and Construction Management Conference, GİRNE/KUZEY KORE, 16 Kasım 2018, s. 9-29
AYDIN MURAT, YAMAN HAKAN
Hakan Yaman Tam metin bildiri
BIM (Building Information Modeling) IFC (Industry Foundation Classes) ACCC (Automated Code Compliance Checking) Concepts: An Overview
IPCMC2018 - 5th International Project and Construction Management Conference, GİRNE/KUZEY KIBRIS TÜRK CUMHURİYETİ, 16 Kasım 2018, s. 45-59
AYDIN MURAT, YAMAN HAKAN
Hakan Yaman Tam metin bildiri
A Proposed Model for Estimation of Ideal Construction Duration in Housing Projects
IPCMC 2022 - 7th International Project and Construction Management Conference, İSTANBUL/TÜRKİYE, Vol. 1, No. 1, 20 Ekim 2022, s. 216-231
TIRATACI HAKAN, YAMAN HAKAN
Hakan Yaman Tam metin bildiri
Total Construction Duration Calculation of TOKI Housing Projects: A Case Study
IPCMC 2022 - 7th International Project and Construction Management Conference, İSTANBUL/TÜRKİYE, 20 Ekim 2022, s. 204-215
TIRATACI HAKAN, YAMAN HAKAN
Hakan Yaman Tam metin bildiri
Currency Risk Analysis on Construction Cash Flows
IPCMC 2022 - 7th International Project and Construction Management Conference, İSTANBUL/TÜRKİYE, Vol. 1, No. 1, 20 Ekim 2022, s. 1138-1144
TÜZ ÖZLEM, YAMAN HAKAN
Hakan Yaman Tam metin bildiri
A BIM Based Automated Code Compliance Checking Conceptual Model Proposal for Housing Projects in Turkey
IPCMC2018 - 5th International Project and Construction Management Conference, GİRNE/KUZEY KIBRIS TÜRK CUMHURİYETİ, 16 Kasım 2018, s. 30-44
AYDIN MURAT, YAMAN HAKAN
Hakan Yaman Tam metin bildiri
COVID-19 Pandemisinin Türkiye Mobil Oyun Pazarına Etkisi: Bir Metin Madenciliği Uygulaması
Journal of Turkish Operations Management, Vol. 18, No. 1, Temmuz 2024, s. 1-19, ISSN: 2630-6433
KADAİFÇİ YANMAZ ÇİĞDEM,BOZDAĞ CAFER ERHAN,IŞIKLI ERKAN
Erkan Işıklı Özgün Makale
The First Step Before Measuring University Technology Transfer Performance: The Case of US Universities
Global Conference on Engineering and Technology Management 2014, İSTANBUL/TÜRKİYE, 23 Haziran 2014, s. 1-10
IŞIKLI ERKAN
Erkan Işıklı Tam metin bildiri
Product Variety Management in the Mobile Application Market Case of Turkey
15. Uluslararası Katılımlı Üretim Araştırmaları Sempozyumu, İzmir/TÜRKİYE, 14 Ekim 2015, s. 1087-1097
KAVILI MERVE CANAN,IŞIKLI ERKAN
Erkan Işıklı Tam metin bildiri
Adsorption of phenol by activated carbon Influence of activation methods and solution pH
Energy Conversion and Management, Vol. 51, No. 2, Şubat 2010, s. 235-240
BEKER ULKER,GANBOLD BATCHIMEG,DERTLİ HALİL,DURANOGLU GÜLBAYIR DİLEK
Halil Dertli Özgün Makale
Evaluation of Human-Nature Relationship in Disaster Risk Management in the Context of Ecological Planning and Spatial Risks:Düzce Province
VI.International Earthquake Symposium. IESKO, Kocaeli/TÜRKİYE, 25 Eylül 2019, s. 164-170
UZUN OSMAN,TEZER AZİME,TERZİ FATİH,KÖYLÜ GÜZİDE PINAR,KUTAY KARAÇOR ELİF LUTFİYE,OKAY NİLGÜN,TÜRKAY ZEYNEP,YILMAZ KAYA MELEK,GÜLER İPEK,AYDIN BİLGE,SATILMIŞ EBRU
Ebru Satılmış Tam metin bildiri
Business Flow Management in Communication Based Train Control Systems
221ST THE IIER INTERNATIONAL CONFERENCE, İstanbul/TÜRKİYE, 6 Şubat 2019, s. 20-23
GÖKDENİZ ŞEBNEM, OKAN MUHAMMED RAŞİT, ÜSTOĞLU İLKER
İlker Üstoğlu Tam metin bildiri
A risk-based approach to prevent unbalanced bids
the 6th International Project and Construction Management Conference (e-IPCMC2020), 12 Kasım 2020
AKIN FIRAT DOĞU,DAMCI ATİLLA,POLAT TATAR GÜL,TÜRKOĞLU HARUN
Fırat Doğu Akın Tam metin bildiri
Crashing construction projects considering schedule flexibility: an illustrative example
International Journal of Construction Management, Vol. 23, No. 4, Nisan 2023, s. 619-628, ISSN: 1562-3599
TÜRKOĞLU HARUN, POLAT TATAR GÜL, AKIN FIRAT DOĞU
Fırat Doğu Akın Özgün Makale
An Assesment Of Lean And Agile Principles In Building Life Cycle Phases
, 6th International Project and Construction Management e-Conference (e-IPCMC-2020), İstanbul/TÜRKİYE, Vol. 1, No. 1, 12 Kasım 2020, s. 1279-193
TAŞ ELÇİN FİLİZ,BUĞAN JİBİD,TÜRKYILMAZ AYNUR HÜRRİYET,BAYLAR KIZILKAYA ŞENNUR,BOZDEMİR SERCAN,AKACALI GÜL ZİBA,ERGİN ASLIHAN,AKIN FIRAT DOĞU,ŞİMŞEK EKİN
Fırat Doğu Akın Tam metin bildiri

İLETİŞİM BİLGİLERİ

İstanbul Teknik Üniversitesi Rektörlüğü İTÜ Ayazağa Kampüsü Rektörlük Binası, Maslak-Sarıyer / İstanbul Tel: +90 212 285 3930