ARAMA SONUÇLARI

Toplam 110 adet sonuçtan 20 tanesi görüntülenmektedir.

Arama









Yıllara göre arama

Özel Aralık Girişi

Opinions of legal professionals regarding the use of ADR in the construction industry
CIB WORLD International Congress, 2011
D. ILTER, A. DIKBAS
Deniz Artan Bildiri
An investigation into the relationship between personality and learning styles in construction industry: As a potential tool for improving health and safety performance
International Journal on Working Conditions, No. 12, Aralık 2016, s. 118-134, ISSN: 2182-9535
SERTYEŞİLIŞIK BEGÜM,TEZEL ECEM,GİRİTLİ FATMA HEYECAN,VATANSEVER NECATİ
CONNET Turkey A Gateway to Construction in Europe
ECPPM 2004 – European Conference on Product and Process Modelling in the AEC Industry e–Work and eBusiness in AEC, İSTANBUL/TÜRKİYE, 8 Eylül 2004, s. 245-248
DİKBAŞ HÜSEYİN ATİLLA,SERKAN DURUSOY,YAMAN HAKAN,TANAÇAN LEYLA,TAŞ ELÇİN FİLİZ
Hakan Yaman Tam metin bildiri
BIM (Building Information Modeling) IFC (Industry Foundation Classes) ACCC (Automated Code Compliance Checking) Concepts: An Overview
5th International Project and Construction Management Conference, Girne/KUZEY KIBRIS TÜRK CUMHURİYETİ, 16 Kasım 2018, s. 45-69
AYDIN MURAT
Hakan Yaman Tam metin bildiri
Discussion of design for disassembly principles under the guidance of design for manufacture and assembly strategies in the construction industry
Lisansüstü Eğitim Enstitüsü, İstanbul Teknik Üniversitesi, 2023
ESMA GÜL AYDENİZ
Fethiye Ecem Edis Tez Yüksek Lisans Tamamlandı
A critical approach to the literature on reasons for delay; and perception of the reasons for delay in the Turkish construction industry
Lisansüstü Eğitim Enstitüsü, İstanbul Teknik Üniversitesi, 2021
ONUR SELÇUK
Gül Polat Tatar Tez Yüksek Lisans Tamamlandı
A decision model for customer order prioritization and facility layout design, a case study for structural steel production in construction industry
Fen Bilimleri Enstitüsü, İstanbul Teknik Üniversitesi, 2018
BURCU NALBANTOĞLU
Yusuf İlker Topcu Tez Doktora Tamamlandı
Report on Price Bank and Life Cycle Inventory Performance Characteristics
CILECCTA (A user-oriented, knowledge-based suite of Construction Industry LifE Cycle CosT Analysis s, 2010, AB 7. Çerçeve Proje Raporu (Proje No 229061)
R. HARTWIG, R. URQUIJO, S. ALBRECHT, V. CARILLO, A. DIKBAS, H. GIRITLI, D. ILTER, I. TEKCE, J. KREISIG, K. LOEWE
Deniz Artan Makale
Report on Price Bank and Life Cycle Inventory Performance Characteristics
CILECCTA (A user-oriented, knowledge-based suite of Construction Industry LifE Cycle CosT Analysis s, 2010, AB 7. Çerçeve Proje Raporu (Proje No 229061)
R. HARTWIG, R. URQUIJO, S. ALBRECHT, V. CARILLO, A. DIKBAS, H. GIRITLI, D. ILTER, I. TEKCE, J. KREISIG, K. LOEWE
Deniz Artan Makale
USE OF ARTIFICIAL INTELLIGENCE FOR OCCUPATIONAL HEALTH AND SAFETY IN THE CONSTRUCTION INDUSTRY
2. BİLSEL INTERNATIONAL KIBYRA SCIENTIFIC RESEARCHES CONGRESS, 20 Temmuz 2024
BEKTAŞ BATUHAN,CEBECİ UFUK
Ufuk Cebeci Tam metin bildiri

İLETİŞİM BİLGİLERİ

İstanbul Teknik Üniversitesi Rektörlüğü İTÜ Ayazağa Kampüsü Rektörlük Binası, Maslak-Sarıyer / İstanbul Tel: +90 212 285 3930