ARAMA SONUÇLARI

Toplam 179 adet sonuçtan 20 tanesi görüntülenmektedir.

Arama









Yıllara göre arama

Özel Aralık Girişi

Earthquake Landslide and Flood disaster Prevention The SciNetNatHaz Project
Frontiers in Environmental and Water Management 2015, Kavala/YUNANİSTAN, 19 Mart 2015
PAPATHEODOROU KONSTANTİNOS,TZANOU ELENA,MAFTEİ CARMEN,KIRCA VEYSEL ŞADAN ÖZGÜR,AKSOY HAFZÜLLAH
Datum Transformations of the Local Basemaps of Rize for RABIS (Rize Disaster Management System) Project
15th TIEMS Annual Conference, Prag/ÇEK CUMHURİYETİ, 17 Haziran 2008
ALTIN MEHMET UĞUR, ALKAN REHA METİN, YAVAŞOĞLU HASAN HAKAN, ŞAHİN MUHAMMED, TARI ERGİN, YANALAK MUSTAFA, ARSLAN ERSOY, ÜNEN HÜSEYİN CAN
Mustafa Yanalak Tam metin bildiri
Datum Transformations of The Local Basemaps of Rize For Rabis Rize Disaster Management System Project
TIEMS 15th Annual Conference, 17 Haziran 2008
ALTIN MEHMET UĞUR,ALKAN REHA METİN,YAVAŞOĞLU HAKAN,ŞAHİN MUHAMMED,TARI ERGİN,YANALAK MUSTAFA,ARSLAN ERSOY,ÜNEN HÜSEYİN CAN
An Analysis of Research Trends in Construction Project Management
The International Research Conference, Manchester/İNGİLTERE, 11 Eylül 2017, s. 472-481
ÇAKMAK FATMA PINAR,İLHAN BAHRİYE
Fatma Pınar Çakmak Tam metin bildiri
Exploring the role of common data environment in BIM
8th International Project and Construction Management Conference, İstanbul/TÜRKİYE, 6 Haziran 2024
AKTÜRK BERKAY,ARISOY BATIKAN,ÇAKMAK FATMA PINAR
Fatma Pınar Çakmak Tam metin bildiri
Role of spontaneous volunteers for community resilience: Lessons learned from the Southeastern Anatolia earthquake temporary structures project
8th International Project and Construction Management Conference, İstanbul/TÜRKİYE, 6 Haziran 2024
ŞANLI ALİME,ÇAKMAK FATMA PINAR
Fatma Pınar Çakmak Tam metin bildiri
The effect of artificial neural networks on cost estimation in construction projects: A literature review
8th International Project and Construction Management Conference, 6 Haziran 2024
ŞERBETÇİOĞLU BOĞAÇHAN,ÇAKMAK FATMA PINAR
Fatma Pınar Çakmak Tam metin bildiri
Factors Affecting the Choice of Dispute Resolution Methods in International Construction Contracts
5th International Project and Construction Management Conference, 16 Kasım 2018
BAHEMAT SAHAR,ÇAKMAK FATMA PINAR,GİRİTLİ FATMA HEYECAN
Fatma Pınar Çakmak Tam metin bildiri
Artificial intelligence for digitalized construction project management during planning phase: A literature review
3rd International Graduate Research Symposium, İstanbul/TÜRKİYE, 8 Mayıs 2024
KARCI MAHMUT EMRE,ÇAKMAK FATMA PINAR
Fatma Pınar Çakmak Özet Bildiri
Investigation of Productivity in the Construction Industry
6th International Project and Construction Management Conference (e-IPCMC2020), 12 Kasım 2020, s. 641-644
BİLİR MAHÇİÇEK SENEM,GÜRCANLI GÜRKAN EMRE
Gürkan Emre Gürcanlı Tam metin bildiri
Heavy Equipment Scheduling for Horizontal Construction Projects
7th International Conference on Engineering, Project, and Production Management, No. 182, 21 Eylül 2016, s. 265-273
GÜRCANLI GÜRKAN EMRE,TÜRKOĞLU HARUN,BİLİR MAHÇİÇEK SENEM
Gürkan Emre Gürcanlı Tam metin bildiri
Heavy Equipment Productivity Analysis by Monte Carlo Simulation and CYCLONE Method
5th International Project and Construction Management Conference (IPCMC 2018), 16 Kasım 2018
KÜÇÜKERDEN ÇAĞLA,TEMEL BETÜL,ORHAN ALİ RIZA,DURSUN ABDULLAH,GÜRCANLI GÜRKAN EMRE
Gürkan Emre Gürcanlı Tam metin bildiri
The New Severity Scale of Occupational Accidents for Construction Projects
5th International Project and Construction Management Conference (IPCMC 2018), 16 Kasım 2018
BİLİR MAHÇİÇEK SENEM,GÜRCANLI GÜRKAN EMRE
Gürkan Emre Gürcanlı Tam metin bildiri
Relative Importance of Productivity Factors in Construction Industry
6th International Project and Construction Management Conference (e-IPCMC2020), 12 Kasım 2020, s. 645-650
BİLİR MAHÇİÇEK SENEM,GÜRCANLI GÜRKAN EMRE
Gürkan Emre Gürcanlı Tam metin bildiri
Integrated Project Delivery (IPD) and Traditional Procurement Methods in Construction Industry-Towards a Team Based Approach
6th International Project and Construction Management Conference (e-IPCMC2020), 12 Kasım 2020, s. 1040-1050
ÜSTÜN PELİN,GÜRCANLI GÜRKAN EMRE
Gürkan Emre Gürcanlı Tam metin bildiri
Hierarchy of Control Measures for Common Construction Activities: A Field Study
5th International Project and Construction Management Conference (IPCMC 2018), 16 Kasım 2018
UZUN MERT,BİLİR MAHÇİÇEK SENEM,GÜRCANLI GÜRKAN EMRE,ÇEBİ SELÇUK
Gürkan Emre Gürcanlı Tam metin bildiri
Mitigating delays and disputes in industrial construction projects: Lessons from a thermal power plant project in Turkey
Journal of Construction Engineering, Management and Innovation, Vol. 7, No. 2, Ocak 2024, ISSN: 2630-5771
GÜRCANLI GÜRKAN EMRE,ÇAPRAZ MERVE,ALP YAĞCI SELİN
Gürkan Emre Gürcanlı Özgün Makale
Safe Work Statement for Construction Activities
6th International Project and Construction Management Conference (e-IPCMC2020), 12 Kasım 2020, s. 453-463
UZUN İBRAHİM MERT,GÜRCANLI GÜRKAN EMRE
Gürkan Emre Gürcanlı Tam metin bildiri
Occupationally Safer Designs in Construction Industry: BIM Based Solution Method
5th International Project and Construction Management Conference (IPCMC 2018), 16 Kasım 2018
TOZER KEMAL DİRGEN,ÇELİK TAHİR,GÜRCANLI GÜRKAN EMRE
Gürkan Emre Gürcanlı Tam metin bildiri
Sustainable project management in Turkey: Current practices and impacts on business performance
International Symposium for Production Research 2017 (ISPR 2017, Viyana/AVUSTURYA, Vol. 1, No. 1, 13 Eylül 2017
ŞAVLIK TUĞÇENUR,YILDIRIM NİHAN

İLETİŞİM BİLGİLERİ

İstanbul Teknik Üniversitesi Rektörlüğü İTÜ Ayazağa Kampüsü Rektörlük Binası, Maslak-Sarıyer / İstanbul Tel: +90 212 285 3930