ARAMA SONUÇLARI

Toplam 284 adet sonuçtan 20 tanesi görüntülenmektedir.

Arama









Yıllara göre arama

Özel Aralık Girişi

A Grey Based DEMATEL Technique for Risk Assessment of Cargo Ships
2nd International Conference on Maritime Technology, GLASGOW/İNGİLTERE, 7 Temmuz 2014
MENTEŞ AYHAN,AKYILDIZ HAKAN,HELVACIOĞLU İSMAİL HAKKI
Ayhan Menteş Tam metin bildiri
Seasonality of low flows and dominant processes in the Rhine River
Stochastic Environmental Research and Risk Assessment, NEW YORK/AMERİKA BİRLEŞİK DEVLETLERİ, Vol. 27, No. 2, Şubat 2013, s. 489-503, ISSN: 1436-3240
TONGAL HAKAN,DEMİREL MEHMET CÜNEYD,BOOIJ MARTIJN J
Mehmet Cüneyd Demirel Özgün Makale
Interaction of Cesium and Strontium Ions with Engineering Barrier Material and their Dose Risk Assessment
IN SItu Nuclear MEtrology as a tool forradioecology – INSINUME 2019, 23 Nisan 2019
HACIYAKUPOĞLU SEVİLAY,ERENTÜRK SEMA,DURMUŞ RÜVEYDA İLERİ,ŞENKAL BAHİRE FİLİZ
Bahire Filiz Şenkal Tam metin bildiri
Schedule Risk Assessment in Green Building Projects
2nd European and Mediterranean Structural Engineering and Construction Conference, 23 Temmuz 2018
GÜRGÜN ASLI PELİN,BAYHAN HASAN GÖKBERK,POLAT TATAR GÜL,TÜRKOĞLU HARUN
Gül Polat Tatar Tam metin bildiri
Risk assessment of trace metals in an extreme environment sediment: shallow, hypersaline, alkaline, and industrial Lake Acıgöl, Denizli, Turkey
Environmental Monitoring and Assessment, Vol. 190, No. 3, Mart 2018, ISSN: 0167-6369
BUDAKOĞLU MURAT, KARAMAN MUHİTTİN, KUMRAL MUSTAFA, ZEYTUNCU BİHTER, DÖNER ZEYNEP, YILDIRIM DEMET, TAŞDELEN SUAT, BÜLBÜL ALİ, GÜMÜŞ LOKMAN
Mustafa Kumral Özgün Makale
Risk Assessment of Fuel Supply Pipelines: Kalecik Power Plant Case Study
Journal of Pipeline Systems Engineering and Practice, Vol. 11, No. 4, Ocak 2020, ISSN: 1949-1190","1949-1204
KAHYA ERCAN, DANANDEH MEHR ALI, TAS ERKİN
Ercan Kahya Özgün Makale
Reverse Logistics Network Design under the Risk of Hazardous Materials Transportation
Human and Ecological Risk Assessment, Vol. 21, No. 5, Ağustos 2015, s. 1277-1298, ISSN: 1080-7039
UĞURLU SEDA
Fuzzy Multicriteria Risk Assessment for Hazardous Waste Management The Case of Istanbul
Journal of Risk Analysis and Crisis Response, Vol. 1, No. 1, Temmuz 2011, s. 29-41, ISSN: 2210-8491-2210-8505
UĞURLU SEDA,KAHRAMAN CENGİZ
Flow Risk Assessment Under Climate Change Effect in Yesilirmak Basin, Turkey
11th World Congress on Water Resources and Environment (EWRA 2019), Madrid/İSPANYA, 25 Haziran 2019, s. 451-452
SERENCAM UĞUR,DABANLI İSMAİL
İsmail Dabanlı Tam metin bildiri
Interaction of Cesium and Strontium Ions with Engineering Barrier Material and their Dose Risk Assessment
IN SItu Nuclear MEtrology as a tool forradioecology – INSINUME 2019, 23 Nisan 2019
HACIYAKUPOĞLU SEVİLAY,ERENTÜRK SEMA,DURMUŞ RÜVEYDA İLERİ,ŞENKAL BAHİRE FİLİZ
Sema Erentürk Tam metin bildiri
Outdoor radioactivity and health risk assessment for capital cityAnkara, Turkey
JOURNAL OF RADIOANALYTICAL AND NUCLEAR CHEMISTRY, No. 318, Ağustos 2018, s. 1033-1042, ISSN: 0236-5731
KAPDAN ENİS,ALTINSOY NESRİN,KARAHAN GÜRSEL,AYHAN YÜKSEL
Nesrin Altınsoy Özgün Makale
Earthquake risk assessment for Istanbul metropolitan area
Earthquake Engineering and Engineering Vibration, Vol. 2, No. 1, Ocak 2003, s. 157-163
ERDİK MUSTAFA,AYDİNOGLU NURAY,FAHJAN YASİN,ŞEŞETYAN KARİN,DEMİRCİOĞLU MİNE BETÜL,SİYAHİ BİLGE,ESER DURUKAL,CEM OZBEY,BİRO YEŞİM,AKMAN HAKAN,YÜZÜGÜLLÜ O
Yasin Fahjan Özgün Makale
A Fuzzy Multi Criteria Group Decision Making Approach to Project Risk Assessment
4th International Conference on Risk Analysis and Crisis Response, 27 Ağustos 2013
ASAN UMUT,SOYER AYBERK,BOZDAĞ CAFER ERHAN
Ayberk Soyer Tam metin bildiri
Activity Based Risk Assessment and Safety Cost Estimation For Residential Building Construction Projects
Safety Science, Vol. 80, 2015, s. 1-12
GÜRCANLI GÜRKAN EMRE,BİLİR MAHÇİÇEK SENEM,SEVİM MERVE
Gürkan Emre Gürcanlı Özgün Makale
Selection of Intensity Measure in Probabilistic Seismic Risk Assessment of a Turkish Railway Bridge
19th International Conference on Reliability and Structural Safety, 27 Temmuz 2017
YILMAZ MEHMET FATİH,ÇAĞLAYAN BARLAS ÖZDEN
An Interval Type 2 Fuzzy Prioritization Approach to Project Risk Assessment
Journal of Multiple-Valued Logic and Soft Computing, Vol. 26, No. 6, Ocak 2016, s. 541-577
ASAN UMUT,SOYER AYBERK,BOZDAĞ CAFER ERHAN
Cafer Erhan Bozdağ Özgün Makale
SEISMIC RISK ASSESSMENT FOR SIMPLY SUPPORTED STEEL RAILWAY BRIDGES IN TURKEY
4. ULUSLARARASI DEPREM MÜHENDİSLİĞİ VE SİSMOLOJİ KONFERANSI, 11 Ekim 2017
YILMAZ MEHMET FATİH,ÇAĞLAYAN BARLAS ÖZDEN
Innovative Flow Risk Assessment with Climate Change Perspective in Yesilirmak Basin
FRESENIUS ENVIRONMENTAL BULLETIN, Vol. 29, No. 1, Ocak 2020, s. 514-521, ISSN: 1018-4619
SERENCAM UĞUR,DABANLI İSMAİL
İsmail Dabanlı Özgün Makale
Drought Hazard, Vulnerability, and Risk Assessment in Turkey
Arabian Journal of Geosciences, Vol. 11, No. 18, Eylül 2018, s. 538-550, ISSN: 1866-7511
DABANLI İSMAİL
İsmail Dabanlı Özgün Makale
Analyzing human error contributions to maritime environmental risk in oil/chemical tanker ship
HUMAN AND ECOLOGICAL RISK ASSESSMENT, Vol. 27, No. 7, Ocak 2021, ISSN: 1080-7039
AYDIN MUHAMMET, AKYÜZ EMRE, ARSLAN ÖZCAN, ÇAMLIYURT GÖKHAN
Emre Akyüz Özgün Makale

İLETİŞİM BİLGİLERİ

İstanbul Teknik Üniversitesi Rektörlüğü İTÜ Ayazağa Kampüsü Rektörlük Binası, Maslak-Sarıyer / İstanbul Tel: +90 212 285 3930