ARAMA SONUÇLARI

Toplam 151 adet sonuçtan 20 tanesi görüntülenmektedir.

Arama









Yıllara göre arama

Özel Aralık Girişi

Civil engineers’ personal values/demographics linkage in project team building
Engineering, Construction and Architectural Management, Vol. 24, No. 6, Kasım 2017, s. 1337-1349, ISSN: 0969-9988
DAMCI ATİLLA,ARDİTİ DAVİD,POLAT TATAR GÜL
Atilla Damcı Özgün Makale
A Project Crashing Strategy Considering Contract Clauses and Quality Considerations: An Illustrative Example
Creative Construction e-Conference 2020, 28 Haziran 2020
POLAT TATAR GÜL,AKIN FIRAT DOĞU,TÜRKOĞLU HARUN,DAMCI ATİLLA
Harun Türkoğlu Tam metin bildiri
An Integrated Approach for HVAC-AHU System Selection in Green Projects
5th international Project and Construction Management Conference (IPCMC2018), 16 Kasım 2018
BAYHAN HASAN GÖKBERK,POLAT TATAR GÜL,TÜRKOĞLU HARUN,ERTURK FATMA OLCAY,GOKTAS BULENT,ARİSOY MEHMET BATİKAN
Harun Türkoğlu Tam metin bildiri
An Integrated Multi-Attribute-Decision-Making Approach for Main Contractor Selection: A Case Study
5th international Project and Construction Management Conference (IPCMC2018), 16 Kasım 2018
POLAT TATAR GÜL,TÜRKOĞLU HARUN,OZDEN UMUR,DAMCI ATİLLA
Harun Türkoğlu Tam metin bildiri
Evaluation of Energy and Atmosphere Credit Achievements of LEED-Certified Buildings in Turkey
5th international Project and Construction Management Conference (IPCMC2018), 16 Kasım 2018
POLAT TATAR GÜL,TÜRKOĞLU HARUN,YİKİLMAZ NAZ,DAMCI ATİLLA
Harun Türkoğlu Tam metin bildiri
BIM (Building Information Modeling) IFC (Industry Foundation Classes) ACCC (Automated Code Compliance Checking) Concepts: An Overview
5th International Project and Construction Management Conference, Girne/KUZEY KIBRIS TÜRK CUMHURİYETİ, 16 Kasım 2018, s. 45-69
AYDIN MURAT
Hakan Yaman Tam metin bildiri
A BIM Based Automated Code Compliance Checking Conceptual Model Proposal for Housing Projects in Turkey
5th International Project and Construction Management Conference, Girne/KUZEY KIBRIS TÜRK CUMHURİYETİ, 16 Kasım 2018, s. 30-44
AYDIN MURAT
Hakan Yaman Tam metin bildiri
A Meta Analysis Study for BIM Based Automated Code Compliance Checking
5th International Project and Construction Management Conference, Girne/KUZEY KIBRIS TÜRK CUMHURİYETİ, 16 Kasım 2018, s. 9-29
AYDIN MURAT
Hakan Yaman Tam metin bildiri
BIM (Building Information Modeling) IFC (Industry Foundation Classes) ACCC (Automated Code Compliance Checking) Concepts: An Overview
IPCMC2018 - 5th International Project and Construction Management Conference, GİRNE/KUZEY KIBRIS TÜRK CUMHURİYETİ, 16 Kasım 2018, s. 45-59
AYDIN MURAT, YAMAN HAKAN
Hakan Yaman Tam metin bildiri
A Meta Analysis Study for BIM Based Automated Code Compliance Checking
IPCMC2018 - 5th International Project and Construction Management Conference, GİRNE/KUZEY KORE, 16 Kasım 2018, s. 9-29
AYDIN MURAT, YAMAN HAKAN
Hakan Yaman Tam metin bildiri
A BIM Based Automated Code Compliance Checking Conceptual Model Proposal for Housing Projects in Turkey
IPCMC2018 - 5th International Project and Construction Management Conference, GİRNE/KUZEY KIBRIS TÜRK CUMHURİYETİ, 16 Kasım 2018, s. 30-44
AYDIN MURAT, YAMAN HAKAN
Hakan Yaman Tam metin bildiri
A brief summary on facilities management technologies and BIM-FM integration
7th International Project and Construction Management Conference, İstanbul/TÜRKİYE, 20 Ekim 2022, s. 811-820
TEZEL ECEM, GİRİTLİ FATMA HEYECAN
Ecem Tezel Tam metin bildiri
Heavy Equipment Scheduling for Horizontal Construction Projects
7th International Conference on Engineering, Project, and Production Management, No. 182, 21 Eylül 2016, s. 265-273
GÜRCANLI GÜRKAN EMRE,TÜRKOĞLU HARUN,BİLİR MAHÇİÇEK SENEM
Harun Türkoğlu Tam metin bildiri
Cost Comparison of Reinforced Concrete Structures Designed According to Turkish and Europen Earthquake Codes
6th International Project and Construction Management Conference (e-IPCMC2020), İstanbul/TÜRKİYE, 12 Kasım 2020, s. 618-631
BUZUKU JETON,GORONA LEART,TOKDEMİR ONUR BEHZAT
Onur Behzat Tokdemir Tam metin bildiri
Integrating Facilities Management Data in Building InformationModelling
5th International Project and Construction Management Conference (IPCMC 2018), 16 Kasım 2018
KULA BEHLÜL,GÜVEN IŞIN GÜRŞANS,ARTAN DENİZ,ERGEN PEHLEVAN ESİN
Deniz Artan Tam metin bildiri
Identification of Queries for Decision Making in BuildingOperation and Maintenance
5th International Project and Construction Management Conference (IPCMC 2018), 16 Kasım 2018
ARTAN DENİZ,YILMAZ NEZİHA,ERGEN PEHLEVAN ESİN
Deniz Artan Tam metin bildiri
A Critical Review of Post-Occupancy Evaluation (POE) Tools
5th International Project and Construction Management Conference (IPCMC2018), 16 Kasım 2018
ARTAN DENİZ,ERGEN PEHLEVAN ESİN,DÖNMEZ DENİZ,TEKÇE IŞILAY
Deniz Artan Tam metin bildiri
Implementation of a BIM-FM Platform at an International Airport Project: Case Study
Journal of Construction Engineering and Management, Vol. 147, No. 4, Nisan 2021, s. 5021002, ISSN: 0733-9364
KULA BEHLÜL, ERGEN PEHLEVAN ESİN
Identification of Waste Types and Their Root Causes in Green-Building Project Delivery Process
Journal of Construction Engineering and Management, Vol. 142, No. 2, Şubat 2016, ISSN: 0733-9364
SEYİS KAZAZOĞLU SENEM, ERGEN PEHLEVAN ESİN
Esin Ergen Pehlevan Özgün Makale
A Conceptual Framework for Assessment of Project Alternatives in the Front End Phase of Major Transportation Projects
Construction Research Congress 2016, Sun Juan/PORTO RİKO, 31 Mayıs 2016
BAYRAKTAR EMRE,NAHID MAHMOUD,ÖZEN HALİT
Halit Özen Tam metin bildiri

İLETİŞİM BİLGİLERİ

İstanbul Teknik Üniversitesi Rektörlüğü İTÜ Ayazağa Kampüsü Rektörlük Binası, Maslak-Sarıyer / İstanbul Tel: +90 212 285 3930