ARAMA SONUÇLARI

Toplam 160 adet sonuçtan 20 tanesi görüntülenmektedir.

Arama









Yıllara göre arama

Özel Aralık Girişi

Hierarchy of Control Measures for Common Construction Activities: A Field Study
5th International Project and Construction Management Conference (IPCMC 2018), 16 Kasım 2018
UZUN MERT,BİLİR MAHÇİÇEK SENEM,GÜRCANLI GÜRKAN EMRE,ÇEBİ SELÇUK
Senem Bilir Mahçiçek Tam metin bildiri
Assessment of the digital competence of construction project managers
The 5th International Project Construction Management Conference (IPCMC 2018), 16 Kasım 2018, s. 458-466
DOĞAN YELDA ÖZGE,ACAR EMRAH
Emrah Acar Tam metin bildiri
Evaluation of Energy and Atmosphere Credit Achievements of LEED-Certified Buildings in Turkey
5th international Project and Construction Management Conference (IPCMC2018), 16 Kasım 2018
POLAT TATAR GÜL,TÜRKOĞLU HARUN,YİKİLMAZ NAZ,DAMCI ATİLLA
Gül Polat Tatar Tam metin bildiri
Challenges of post-disaster construction projects: An empirical investigation according to project management knowledge areas
8th ICBR International Conference on Building Resilience, 14 Kasım 2018
ALSAADİ OMİMAH,ACAR EMRAH
Emrah Acar Özet Bildiri
An Integrated Approach for HVAC-AHU System Selection in Green Projects
5th international Project and Construction Management Conference (IPCMC2018), 16 Kasım 2018
BAYHAN HASAN GÖKBERK,POLAT TATAR GÜL,TÜRKOĞLU HARUN,ERTURK FATMA OLCAY,GOKTAS BULENT,ARİSOY MEHMET BATİKAN
Gül Polat Tatar Tam metin bildiri
An Integrated Multi-Attribute-Decision-Making Approach for Main Contractor Selection: A Case Study
5th international Project and Construction Management Conference (IPCMC2018), 16 Kasım 2018
POLAT TATAR GÜL,TÜRKOĞLU HARUN,OZDEN UMUR,DAMCI ATİLLA
Gül Polat Tatar Tam metin bildiri
Facing the Challenge attitudes and Perceptions and Expectations of Y Generation Employees on Project Management in Software Development Projects
1. Uluslararası Katılımlı Proje Yönetimi Konferansı, İSTANBUL/TÜRKİYE, 19 Eylül 2014, s. 26-36
YILDIRIM NİHAN,KORMAZ YELİZ
Nihan Yıldırım Tam metin bildiri
Sustainable project management in Turkey: Current practices and impacts on business performance
International Symposium for Production Research 2017 (ISPR 2017, Viyana/AVUSTURYA, Vol. 1, No. 1, 13 Eylül 2017
ŞAVLIK TUĞÇENUR,YILDIRIM NİHAN
The Effect of Economical Development on Project Management in Developing Countries
Challenges Facing the Construction Industry in Developing Countries, GABORONE/BOTSVANA, 1 Ocak 2000
KURUOĞLU MURAT,ERGEN PEHLEVAN ESİN
Murat Kuruoğlu Tam metin bildiri
Applicability of the Six Thinking Hats Technic to the Eco-Charrette Meetings
6th International Project and Construction Management Conference, İstanbul/TÜRKİYE, 12 Kasım 2020, s. 443-452
ERUSTA NUR EFŞAN, SERTYEŞİLIŞIK BEGÜM
Nur Efşan Erusta Tam metin bildiri
Factors Affecting the Choice of Dispute Resolution Methods in International Construction Contracts
5th International Project and Construction Management Conference, 16 Kasım 2018
BAHEMAT SAHAR,ÇAKMAK FATMA PINAR,GİRİTLİ FATMA HEYECAN
Fatma Pınar Çakmak Tam metin bildiri
An Analysis of Research Trends in Construction Project Management
The International Research Conference, Manchester/İNGİLTERE, 11 Eylül 2017, s. 472-481
ÇAKMAK FATMA PINAR,İLHAN BAHRİYE
Fatma Pınar Çakmak Tam metin bildiri
Flagship Regeneration Project as a Tool for Post Disaster Recovery Planning The Zeytinburnu Case
The Journal of Disaster Studies, Policy and Management, Vol. 33, No. 2, 2009, s. 180-202
OZLEM OZCEVIK,SENCE TURK,TAŞ ELÇİN FİLİZ,YAMAN HAKAN,BEYGO CEM
Elçin Filiz Taş Özgün Makale
Towards Green Campuses: Students’ Perceptions and Expectations
5th International Project and Construction Management Conference(IPCMC2018), 16 Kasım 2018, s. 859-866
TEZEL ECEM,UĞURAL MEHMET NURETTİN,GİRİTLİ FATMA HEYECAN
Ecem Tezel Tam metin bildiri
Earthquake Landslide and Flood disaster Prevention The SciNetNatHaz Project
Frontiers in Environmental and Water Management 2015, Kavala/YUNANİSTAN, 19 Mart 2015
PAPATHEODOROU KONSTANTİNOS,TZANOU ELENA,MAFTEİ CARMEN,KIRCA VEYSEL ŞADAN ÖZGÜR,AKSOY HAFZÜLLAH
Development and Application of a Rubric Specific for the Senior Year Graduation Design Projects for Assessing Learning Outcomes
Iberoamerican Journal of Project Management, Buenos Aires/ARJANTİN, Vol. 7, No. 1, Haziran 2016, s. 47-61, ISSN: 2346-9161
GÖMEÇ ÇİĞDEM,KÖSE MUTLU BÖRTE,DÜLEKGÜRGEN EBRU,ÖZTÜRK İZZET,TANIK AYŞEGÜL
Ebru Dülekgürgen Özgün Makale
Civil engineers’ personal values/demographics linkage in project team building
Engineering, Construction and Architectural Management, Vol. 24, No. 6, Kasım 2017, s. 1337-1349, ISSN: 0969-9988
DAMCI ATİLLA,ARDİTİ DAVİD,POLAT TATAR GÜL
Gül Polat Tatar Özgün Makale
Development and application of a rubric specific for the senior year Graduation Design Projects for assessing learning outcomes
Iberoamerican Journal of Project Management, Buenos Aires/ARJANTİN, Vol. 7, No. 1, Haziran 2016, s. 47-61, ISSN: 2346-9161
GÖMEÇ ÇİĞDEM,MUTLU BÖRTE,DÜLEKGÜRGEN EBRU,ÖZTÜRK İZZET,TANIK AYŞEGÜL
Çiğdem Gömeç Özgün Makale
The interplay between leadership and organizational culture in the Turkish construction sector
International Journal of Project Management, Vol. 31, No. 2, Şubat 2013, s. 228-238, ISSN: 02637863
ÖNEY YAZICI ELA,GİRİTLİ FATMA HEYECAN,ACAR EMRAH,ORAZ GÜLFER
Emrah Acar Özgün Makale
Assessment of the Capabilities of Commercial Tools to Develop4D/5D Models
5th International Project and Construction Management Conference (IPCMC 2018), 16 Kasım 2018
YEŞİLYURT MUSTAFA,ERGEN PEHLEVAN ESİN
Esin Ergen Pehlevan Tam metin bildiri

İLETİŞİM BİLGİLERİ

İstanbul Teknik Üniversitesi Rektörlüğü İTÜ Ayazağa Kampüsü Rektörlük Binası, Maslak-Sarıyer / İstanbul Tel: +90 212 285 3930