Management of Building Restoration Projects: Key Areas of Concern and Challenges
7th International Project and Construction Management Conference (IPCMC2022), 20 Ekim 2022, s. 143-155
SAVAŞ SEZER,ACAR EMRAH
|
Managing the connection between project & organization levels: A case example of lessons learned practices in building projects
6th international Project and Construction Management Conference (IPCMC2020), İstanbul/TÜRKİYE, 20 Ekim 2022
OKULLU HALİM EMRE,ACAR EMRAH
|
Exploring the role of common data environment in BIM
8th International Project and Construction Management Conference, İstanbul/TÜRKİYE, 6 Haziran 2024
AKTÜRK BERKAY,ARISOY BATIKAN,ÇAKMAK FATMA PINAR
|
Artificial intelligence for digitalized construction project management during planning phase: A literature review
3rd International Graduate Research Symposium, İstanbul/TÜRKİYE, 8 Mayıs 2024
KARCI MAHMUT EMRE,ÇAKMAK FATMA PINAR
|
A Conceptual Framework for Assessment of Project Alternatives in the Front End Phase of Major Transportation Projects
Construction Research Congress 2016, Sun Juan/PORTO RİKO, 31 Mayıs 2016
BAYRAKTAR EMRE,NAHID MAHMOUD,ÖZEN HALİT
|
Role of spontaneous volunteers for community resilience: Lessons learned from the Southeastern Anatolia earthquake temporary structures project
8th International Project and Construction Management Conference, İstanbul/TÜRKİYE, 6 Haziran 2024
ŞANLI ALİME,ÇAKMAK FATMA PINAR
|
Digital twins for enhanced construction project management
SMART AND SUSTAINABLE BUILT ENVIRONMENT, Vol. 14, No. 7, Ocak 2025, s. 25-2200, ISSN: 2046-6099
AKTÜRK BERKAY,ÇAKMAK FATMA PINAR
|
Using Machine Learning Algorithms for Interpretable Predictions of House Prices and Variable Features
8th International Project and Construction Management Conference, İstanbul/TÜRKİYE, 7 Haziran 2024, s. 63-78
SÖNMEZ NURŞEN,GÜNAYDIN HÜSNÜ MURAT
|
Digital twins for enhanced construction project management
SMART AND SUSTAINABLE BUILT ENVIRONMENT, Vol. 14, No. 7, Ocak 2025, s. 25-2200, ISSN: 2046-6099
AKTÜRK BERKAY,ÇAKMAK FATMA PINAR
|
A risk-based approach to prevent unbalanced bids
the 6th International Project and Construction Management Conference (e-IPCMC2020), 12 Kasım 2020
AKIN FIRAT DOĞU,DAMCI ATİLLA,POLAT TATAR GÜL,TÜRKOĞLU HARUN
|
A Project Crashing Strategy Considering Contract Clauses and Quality Considerations: An Illustrative Example
Creative Construction e-Conference 2020, 28 Haziran 2020
POLAT TATAR GÜL,AKIN FIRAT DOĞU,TÜRKOĞLU HARUN,DAMCI ATİLLA
|
A Project Crashing Strategy Considering Contract Clauses and Quality Considerations: An Illustrative Example
Creative Construction e-Conference, 28 Haziran 2020
POLAT TATAR GÜL, AKIN FIRAT DOĞU, TÜRKOĞLU HARUN, DAMCI ATİLLA
|
An Assesment Of Lean And Agile Principles In Building Life Cycle Phases
, 6th International Project and Construction Management e-Conference (e-IPCMC-2020), İstanbul/TÜRKİYE, Vol. 1, No. 1, 12 Kasım 2020, s. 1279-193
TAŞ ELÇİN FİLİZ,BUĞAN JİBİD,TÜRKYILMAZ AYNUR HÜRRİYET,BAYLAR KIZILKAYA ŞENNUR,BOZDEMİR SERCAN,AKACALI GÜL ZİBA,ERGİN ASLIHAN,AKIN FIRAT DOĞU,ŞİMŞEK EKİN
|
An Assessment of Lean and Agile Principles in Building Life Cycle Phases
6th International Project and Construction Management Conference (e-IPCMC2020) 12-14 Kasım 2020, İstanbul/TÜRKİYE, 12 Kasım 2020
TAŞ ELÇİN FİLİZ, BULĞAN JİBİD, TÜRKYILMAZ AYNUR HÜRRİYET, BOZDEMİR SERCAN, AKARCALI GÜL ZİBA, AKIN FIRAT DOĞU, ŞİMŞEK EKİN, BAYLAR KIZILKAYA ŞENNUR, ERGİN ASLIHAN
|
Strategic Energy Project Investment Decisions Using RoBERTa: A Framework for Efficient Infrastructure Evaluation
Buildings, Vol. 16, No. 3, Ocak 2026, s. 547, ISSN: 2075-5309
ÖZKAN RECEP,MOSTOFİ FATEMEH,KADIOĞLU FETHİ,TOĞAN VEDAT,TOKDEMİR ONUR BEHZAT
|
Asset Management Practices and Challenges in Airport Projects:A Case Study
8 th International Project and Construction Management Conference (IPCMC2024), İstanbul/TÜRKİYE, 6 Haziran 2024, s. 1062-1070
ERGEN PEHLEVAN ESİN,YILMAZ NEZİHA,UZUN CEMİL CAN,ÇITIPITIOĞLU AHMET MUHTAR
|
A Study on the Applicability of Project Management Tracking with the Integration of Jira, Confluence, and Trello in Construction Project Management and the Differences and Advantages of Different Planning Softwares
Dokuz Eylül Üniversitesi Mühendislik Fakültesi Fen ve Mühendislik Dergisi, Vol. 27, Eylül 2025, ISSN: 1302-9304
KILIÇ RAMAZAN KAAN,GÜRCANLI GÜRKAN EMRE
|
A risk-based approach to prevent unbalanced bids
the 6th International Project and Construction Management Conference (e-IPCMC2020), 12 Kasım 2020
AKIN FIRAT DOĞU,DAMCI ATİLLA,POLAT TATAR GÜL,TÜRKOĞLU HARUN
|
Interdisciplinary Pathways for Innovation in Construction and Management
Journal of Engineering, Project, and Production Management, Vol. 15, No. 4, Ekim 2025, s. 2025-201, ISSN: 2221-6529
POLAT TATAR GÜL
|
CONTRACTOR RISK MANAGEMENT AND ADAPTIVE STRATEGIES IN WARTIME CONSTRUCTION: CASE STUDY OF HEADQUARTER PROJECT MOSCOW
16th INTERNATIONAL CONGRESS ON ENGINEERING, ARCHITECTURE AND DESIGN, İstanbul/TÜRKİYE, 20 Aralık 2025
ÇOLAK MUHAMMED ALİ,GÜRCANLI GÜRKAN EMRE
|