Gene Ontology Based Annotation Analysis and Categorization of Metabolic Pathways
19th International Conference on Scientific and Statistical Database Management (SSDBM 2007), 9 Temmuz 2007
ÇAKMAK ALİ,KIRAÇ MUSTAFA,REYNOLDS MARC,ÖZSOYOĞLU ZEHRA MERAL,ÖZSOYOĞLU GÜLTEKİN
|
BIM Adoption in Metro Projects: Challenges and LessonsLearned
5th International Project and Construction Management Conference (IPCMC 2018), 16 Kasım 2018
KAZAZ BİLLUR,ALEMDAR A SİNAN,MURTEZA MUSTAFA,ERGEN PEHLEVAN ESİN
|
Ofis Binalarında Bina Yönetim Hizmetleri ve Kullanıcı Memnuniyeti
Uluslararası katılımlı 7.İnşaat Yönetimi Kongresi, 7th International Congress on Construction Management-IMO, Samsun/TÜRKİYE, 6 Ekim 2017, s. 233-244
TEKÇE IŞILAY,ARTAN DENİZ,ERGEN PEHLEVAN ESİN
|
A Critical Review of Post-Occupancy Evaluation (POE) Tools
5th International Project and Construction Management Conference (IPCMC2018), 16 Kasım 2018
ARTAN DENİZ,ERGEN PEHLEVAN ESİN,DÖNMEZ DENİZ,TEKÇE IŞILAY
|
TECHNOLOGICAL ASSESSMENT AND PROCESS IMPLICATIONS OF FIELD DATA CAPTURE TECHNOLOGIES FOR CONSTRUCTION AND FACILITY/INFRASTRUCTURE MANAGEMENT
JOURNAL OF INFORMATION TECHNOLOGY IN CONSTRUCTION, Vol. 13, Ocak 2008, s. 134-154, ISSN: 1874-4753
KİZİLTAS SEMİHA,AKİNCİ BURCU,ERGEN PEHLEVAN ESİN,TANG PİNGBO,GORDON CHRİS
|
Life cycle data management of engineered to order components using radio frequency identification
Advanced Engineering Informatics, Vol. 21, No. 4, Ekim 2007, s. 356-366, ISSN: 14740346
ERGEN ESİN,AKİNCİ BURCU,SACKS RAFAEL
|
Identification of Waste Types and Their Root Causes in Green Building Project Delivery Process
Journal of Construction Engineering and Management, Vol. 142, No. 2, Şubat 2016, s. 40150591-401505913, ISSN: 0733-9364
SENEM SEYİS,ERGEN PEHLEVAN ESİN,EMİLİO PİZZİ
|
Assessment of the Capabilities of Commercial Tools to Develop4D/5D Models
5th International Project and Construction Management Conference (IPCMC 2018), 16 Kasım 2018
YEŞİLYURT MUSTAFA,ERGEN PEHLEVAN ESİN
|
Bina İç Mekanlarında Konumlandırma Teknolojilerinin Kullanıcı Geri Bildirimleri Toplanması Açısından Değerlendirilmesi
Uluslararası katılımlı 7.İnşaat Yönetimi Kongresi, 7th International Congress on Construction Management-IMO, Samsun/TÜRKİYE, 6 Ekim 2017, s. 245-255
ERGEN PEHLEVAN ESİN,ARTAN DENİZ,TEKÇE IŞILAY,KULA BEHLÜL,DÖNMEZ DENİZ
|
Modeling and Analyzing the Impact of Technology on Data Capture and Transfer Processes at Construction Sites A Case Study
Journal of Construction Engineering and Management, Vol. 132, No. 11, Kasım 2006, s. 1148-1157, ISSN: 0733-9364
KİZİLTAS SEMİHA,AKİNCİ BURCU,ERGEN ESİN,KARAESMEN ITİR Z,KECELİ FUAT
|
Sensing and Field Data Capture for Construction and Facility Operations
Journal of Construction Engineering and Management, Vol. 137, No. 10, Ekim 2011, s. 870-881, ISSN: 0733-9364
TANEJA SAURABH,AKİNCİ BURCU,GARRETT JAMES H,SOİBELMAN LUCİO,ERGEN ESİN,PRADHAN ANU,TANG PİNGBO,BERGES MARİO,ATASOY GUZİDE,LİU XUESONG,SHAHANDASHTİ SEYED MOHSEN,ANİL ENGİN BURAK
|
Implementation of a BIM-FM Platform at an International Airport Project: Case Study
Journal of Construction Engineering and Management, Vol. 147, No. 4, Nisan 2021, s. 5021002, ISSN: 0733-9364
KULA BEHLÜL, ERGEN PEHLEVAN ESİN
|
Identification of Queries for Decision Making in BuildingOperation and Maintenance
5th International Project and Construction Management Conference (IPCMC 2018), 16 Kasım 2018
ARTAN DENİZ,YILMAZ NEZİHA,ERGEN PEHLEVAN ESİN
|
Formalization of the Flow of Component Related Information in Precast Concrete Supply Chains
Journal of Construction Engineering and Management, Vol. 134, No. 2, Şubat 2008, s. 112-121, ISSN: 0733-9364
ERGEN ESİN,AKİNCİ BURCU
|
Hazard Assesment of A Coal Mine for Radon Concentration 7 9 June Greece
Advances in Mineral Resources Management and Environmental Geotechnology, GİRİT/YUNANİSTAN, No. 0, 7 Haziran 2004, s. 767-770
FİŞNE A., ÖZTÜRK C.A., ÖKTEN G.
|
Indicator Variogram for Solving The Estimation Problem
Advances in Mineral Resources Management and Environmental Geotechnology, GİRİT/YUNANİSTAN, No. 0, 7 Haziran 2004, s. 771-775
ÖZTÜRK C.A., FİŞNE A., NASUF E.
|
Incorporating smart objects into BIM: A comprehensive review
Journal of Construction Engineering, Management & Innovation, Vol. 7, No. 1, Mart 2024, s. 10-33, ISSN: 2630-5771
YILMAZ ŞENEL KÜBRA,KANAN ASLI
|
TRIZ THEORY OF INVENTIVE PROBLEM SOLVING AND COMPARISON OF TRIZ WITH THE OTHER PROBLEM SOLVING TECHNIQUES
1st International Symposium on Engineering and Artificial Intelligence & Applications, Girne/KUZEY KIBRIS TÜRK CUMHURİYETİ, 6 Kasım 2013
CERİT BÜLENT, KÜÇÜKYAZICI GÜNEŞ, SERBÜLENT DİRİM ŞENER
|
THE WORKING CAPITAL MANAGEMENT EFFECT ON PROFITABILITY OF ENERGY COMPANIES IN TURKEY, BASED ON DIFFERENT BUSINESS CYCLES
İstanbul Finance Congress Nov1-2, Vol. 8, No. 1, 1 Kasım 2018, s. 18-23
TAŞ OKTAY,ATAÇ ÇİĞDEM GÜLEROĞLUI
|
Analysis of the information flow from BIM to energy simulation programs
Organization, Technology and Management in Construction (OTMC), Primosten/HIRVATİSTAN, 2 Eylül 2015
DENİZ ILTER,ERGEN PEHLEVAN ESİN
|