Preliminary Resuls of 3D Full Seismic Waveform tomography of NW Turkey The EU Framework Programme HORIZON 2020 COST Actions Earth System Science and Environmental Management COST Action ES1401 Time Dependent Seismology TIDES 1st Advanced Training School on Seismic Data 01 05 May 2015 Bertinoro Italy
EU Framework Programme – HORIZON 2020 – COST Actions: Earth System Science and Environmental Management COST Action ES1401 – Time Dependent Seismology (TIDES) 1st Advanced Training School on Seismic Data, BERTINORO/İTALYA, 1 Mayıs 2015
ÇUBUK YEŞİM,FICHTNER ANDREAS,TAYMAZ TUNCAY
|
Performance of low-cost GNSS equipment in monitoring of horizontal displacements
SURVEY REVIEW, Vol. 55, No. 393, Ocak 2023, s. 10, ISSN: 0039-6265
OKU TOPAL GÜLDANE, KARABULUT MUSTAFA FAHRİ, AYKUT NEDİM ONUR, AKPINAR BURAK
|
Identification of cost factors for integrated alternative cost and time analysis in pre-construction stage
FEN BİLİMLERİ ENSTİTÜSÜ, İSTANBUL TEKNİK ÜNİVERSİTESİ, 2017
GÜLSÜM SEVDE BALTAŞI
|
Developing a framework for target cost in post-disaster housing by minimizing time and optimizing cost using 3D model
LİSANSÜSTÜ EĞİTİM ENSTİTÜSÜ, İSTANBUL TEKNİK ÜNİVERSİTESİ, 2024
ZAFER ÜZMEZ
|
A Building Cost Estimating Model Based on Cost Significant Work Packages
Engineering, Construction and Architectural Management, Vol. 3, No. 12, 2005, s. 251 – 263, ISSN: 0969-9988, Emerald
Y. DOC. DR. ELCIN TAS, Y. DOC. DR. HAKAN YAMAN
|
Treatment of produced water originated from oil and gas production wells: a pilot study and cost analysis
ENVIRONMENTAL SCIENCE AND POLLUTION RESEARCH, Vol. 25, No. 7, Ocak 2018, s. 6398-6406, ISSN: 0944-1344
ERŞAHİN MUSTAFA EVREN, ÖZGÜN ERŞAHİN HALE, KAYA RECEP, KÖSE MUTLU BÖRTE, KINACI CUMALİ, KOYUNCU İSMAİL
|
Comparative evaluation of cost for preliminary and tertiary municipal wastewater treatment plants in Istanbul
Science of The Total Environment, Vol. 778, Temmuz 2021, ISSN: 0048-9697
ÖZGÜN ERŞAHİN HALE,ÇİÇEKALAN BÜŞRA,AKDAĞ YASEMİN,KOYUNCU İSMAİL,ÖZTÜRK İZZET
|
Impact of membrane configuration on the performance and cost of a pilot-scale UF process treating surface water
Separation and Purification Technology, Vol. 304, Ocak 2023, ISSN: 1383-5866
KAYA RECEP, YÜKSEKDAĞ AYŞE, KORKUT SEVDE, TÜRKEN TÜRKER, PAŞAOĞLU MEHMET EMİN, ERŞAHİN MUSTAFA EVREN, ÖZGÜN ERŞAHİN HALE, KOYUNCU İSMAİL
|
A crashing-based time-cost trade-off model considering quality cost and contract clauses
International Journal of Construction Management, Vol. 23, No. 6, Haziran 2023, s. 954-963, ISSN: 1562-3599
AKIN FIRAT DOĞU, POLAT TATAR GÜL, TÜRKOĞLU HARUN, DAMCI ATİLLA
|
A crashing-based time-cost trade-off model considering quality cost and contract clauses
International Journal of Construction Management, Vol. 23, No. 6, Haziran 2023, s. 954-963, ISSN: 1562-3599
AKIN FIRAT DOĞU, POLAT TATAR GÜL, TÜRKOĞLU HARUN, DAMCI ATİLLA
|
Cost Effectiveness of Frequent HIV Testing of High Risk Populations in the United States
JAIDS Journal of Acquired Immune Deficiency Syndromes, Vol. 71, No. 3, Ocak 2016, s. 323-330, ISSN: 1525-4135
HUTCHİNSON ANGELA,FARNHAM PAUL G,SANSOM STEPHANİE L,YAYLALI EMİNE,MERMİN JONATHAN H
|
Cost assessment and evaluation of various hydrogen delivery scenarios
International Journal of Hydrogen Energy, Vol. 43, No. 22, Mayıs 2018, ISSN: 0360-3199
DEMİR MURAT EMRE, DİNCER İBRAHİM
|
A crashing-based time-cost trade-off model considering quality cost and contract clauses
International Journal of Construction Management, Vol. 23, No. 6, Haziran 2023, s. 954-963, ISSN: 1562-3599
AKIN FIRAT DOĞU, POLAT TATAR GÜL, TÜRKOĞLU HARUN, DAMCI ATİLLA
|
A Performance Analysis of Low Cost GPS Receivers in Kinematic Applications
Journal of Navigation, Vol. 62, No. 4, Mayıs 2009, s. 687-697, ISSN: 0373-4633
ALKAN REHA METİN,SAKA MEHMET HALİS
|
Application of nanofiltration for Rare Earth Elements recovery from coal fly ash leachate: Performance and cost evaluation
CHEMICAL ENGINEERING JOURNAL, Vol. 349, Ocak 2018, s. 309-317, ISSN: 1385-8947
KÖSE MUTLU BÖRTE, CANTONİ BEATRİCE, TUROLLA AND, MAR ANTONELLİ, HSU KİM HEİLEEN, WİESNER MARK
|
A building cost estimation model based on cost significant work packages
Engineering, Construction and Architectural Management, Vol. 12, No. 3, Haziran 2005, s. 251-263, ISSN: 0969-9988
TAŞ ELÇİN FİLİZ,YAMAN HAKAN
|
Hybrid Solar And Wind Energy Potential Map of Turkey and Cost Analysis of 1 MW Hybrid Power Plants
International Journal of Engineering Research and Advanced Technology-IJERAT, Vol. 5, No. 6, Haziran 2019, s. 1-14, ISSN: 2454-6135
ŞENGÜLER FURKAN,YUMURTACI ZEHRA
|
An approach for cost and energy efficient retrofitting of a lower secondary school building
Journal of the Faculty of Engineering and Architecture of Gazi University, Vol. 34, No. 1, Nisan 2019, s. 393-407, ISSN: 1300-1884
YILMAZ YİĞİT, KOÇLAR ORAL GÜL
|
Econometric Modeling of Construction Cost Estimation: A VECM-Based Approach for Forecasting Price Fluctuations in Türkiye
32th Annual European Real Estate Society Conference, ATİNA/YUNANİSTAN, 2 Temmuz 2025
ARSLANLI KEREM YAVUZ,METİN FATİH EREN
|
Simulation-Based Cost Evaluation of Maritime Transportation
Journal of Eta Maritime Science, Vol. 11, No. 4, Aralık 2023, s. 270-281, ISSN: 2148-9386
PEHLİVAN DAVUT, ÇİÇEK KADİR
|