Preliminary Resuls of 3D Full Seismic Waveform tomography of NW Turkey The EU Framework Programme HORIZON 2020 COST Actions Earth System Science and Environmental Management COST Action ES1401 Time Dependent Seismology TIDES 1st Advanced Training School on Seismic Data 01 05 May 2015 Bertinoro Italy
EU Framework Programme – HORIZON 2020 – COST Actions: Earth System Science and Environmental Management COST Action ES1401 – Time Dependent Seismology (TIDES) 1st Advanced Training School on Seismic Data, BERTINORO/İTALYA, 1 Mayıs 2015
ÇUBUK YEŞİM,FICHTNER ANDREAS,TAYMAZ TUNCAY
|
Performance of low-cost GNSS equipment in monitoring of horizontal displacements
SURVEY REVIEW, Vol. 55, No. 393, Ocak 2023, s. 10, ISSN: 0039-6265
OKU TOPAL GÜLDANE, KARABULUT MUSTAFA FAHRİ, AYKUT NEDİM ONUR, AKPINAR BURAK
|
Identification of cost factors for integrated alternative cost and time analysis in pre-construction stage
Fen Bilimleri Enstitüsü, İstanbul Teknik Üniversitesi, 2017
GÜLSÜM SEVDE BALTAŞI
|
Developing a framework for target cost in post-disaster housing by minimizing time and optimizing cost using 3D model
Lisansüstü Eğitim Enstitüsü, İstanbul Teknik Üniversitesi, 2024
ZAFER ÜZMEZ
|
A Performance Analysis of Low Cost GPS Receivers in Kinematic Applications
Journal of Navigation, Vol. 62, No. 4, Mayıs 2009, s. 687-697, ISSN: 0373-4633
ALKAN REHA METİN,SAKA MEHMET HALİS
|
Application of nanofiltration for Rare Earth Elements recovery from coal fly ash leachate: Performance and cost evaluation
CHEMICAL ENGINEERING JOURNAL, Vol. 349, Ocak 2018, s. 309-317, ISSN: 1385-8947
KÖSE MUTLU BÖRTE, CANTONİ BEATRİCE, TUROLLA AND, MAR ANTONELLİ, HSU KİM HEİLEEN, WİESNER MARK
|
A building cost estimation model based on cost significant work packages
Engineering, Construction and Architectural Management, Vol. 12, No. 3, Haziran 2005, s. 251-263, ISSN: 0969-9988
TAŞ ELÇİN FİLİZ,YAMAN HAKAN
|
Hybrid Solar And Wind Energy Potential Map of Turkey and Cost Analysis of 1 MW Hybrid Power Plants
International Journal of Engineering Research and Advanced Technology-IJERAT, Vol. 5, No. 6, Haziran 2019, s. 1-14, ISSN: 2454-6135
ŞENGÜLER FURKAN,YUMURTACI ZEHRA
|
An approach for cost and energy efficient retrofitting of a lower secondary school building
Journal of the Faculty of Engineering and Architecture of Gazi University, Vol. 34, No. 1, Nisan 2019, s. 393-407, ISSN: 1300-1884
YILMAZ YİĞİT, KOÇLAR ORAL GÜL
|
Econometric Modeling of Construction Cost Estimation: A VECM-Based Approach for Forecasting Price Fluctuations in Türkiye
32th Annual European Real Estate Society Conference, ATİNA/YUNANİSTAN, 2 Temmuz 2025
ARSLANLI KEREM YAVUZ,METİN FATİH EREN
|
Life-cycle assessment and life-cycle cost assessment of lithium-ion batteries for passenger ferry
Transportation Research Part D: Transport and Environment, Vol. 115, Şubat 2023, ISSN: 1361-9209
GÜVEN DENİZHAN, KAYALICA MEHMET ÖZGÜR
|
Cost-benefit analysis of emission reduction techniques: a case for container vessel
Journal of Marine Engineering & Technology, Şubat 2024, ISSN: 2046-4177
EJDER EMİR, KARATUĞ ÇAĞLAR, ARSLANOĞLU YASİN
|
Maintenance stop time influence on aircraft total maintenane cost with downtime integrated cost model
7th International Conference on Mechanical and Aerospace Engineering (ICMAE), 18 Temmuz 2016
SALTOĞLU REMZİ,HUMAİRA NAZMİA,İNALHAN GÖKHAN
|
A Building Cost Estimation Model Based on Cost Significant Work Packages
Engineering, Construction and Architectural Management, Vol. 12, No. 3, Mayıs 2005, s. 251-263
TAS ELCIN,YAMAN HAKAN
|
A crashing-based time-cost trade-off model considering quality cost and contract clauses
International Journal of Construction Management, Vol. 23, No. 6, Haziran 2023, s. 954-963, ISSN: 1562-3599
AKIN FIRAT DOĞU, POLAT TATAR GÜL, TÜRKOĞLU HARUN, DAMCI ATİLLA
|
Cost assessment and evaluation of various hydrogen delivery scenarios
International Journal of Hydrogen Energy, Vol. 43, No. 22, Mayıs 2018, ISSN: 0360-3199
DEMİR MURAT EMRE, DİNCER İBRAHİM
|
A crashing-based time-cost trade-off model considering quality cost and contract clauses
International Journal of Construction Management, Vol. 23, No. 6, Haziran 2023, s. 954-963, ISSN: 1562-3599
AKIN FIRAT DOĞU, POLAT TATAR GÜL, TÜRKOĞLU HARUN, DAMCI ATİLLA
|
TEM characterization of free standing Ni nanowire structures obtained from different nickel electroplating baths and utilization of these structures as visible photocatalysts for nanorobotic applications
COST Action MP1407: Electrochemical processing methodologies and corrosionprotection for device and systems miniaturization: 3rd COST Workshop, Barcelona/İSPANYA, 25 Ekim 2017
AVCI BURÇAK,VİDAL SALVADOR PANE,ÜRGEN MUSTAFA KAMİL
|
A crashing-based time-cost trade-off model considering quality cost and contract clauses
International Journal of Construction Management, Vol. 23, No. 6, Haziran 2023, s. 954-963, ISSN: 1562-3599
AKIN FIRAT DOĞU, POLAT TATAR GÜL, TÜRKOĞLU HARUN, DAMCI ATİLLA
|
A crashing-based time-cost trade-off model considering quality cost and contract clauses
International Journal of Construction Management, Vol. 23, No. 6, Haziran 2023, s. 954-963, ISSN: 1562-3599
AKIN FIRAT DOĞU, POLAT TATAR GÜL, TÜRKOĞLU HARUN, DAMCI ATİLLA
|