Aircraft Scheduled Airframe Maintenance and Downtime Integrated Cost Model
ADVANCES IN OPERATIONS RESEARCH, Haziran 2016
SALTOĞLU REMZİ,HUMAİRA NAZMİA,İNALHAN GÖKHAN
|
Cost based performance evaluation of supply chain types regarding demand uncertainty: A proposed mathematical model
Fen Bilimleri Enstitüsü, İstanbul Teknik Üniversitesi, 2009
HASAN CAN KESKİN
|
Method for optimal vertical alignment of highways
PROCEEDINGS OF THE INSTITUTION OF CIVIL ENGINEERS-TRANSPORT, Vol. 162, No. 4, 2009, s. 177-188, ISSN: 0965-092X
,GÖKTEPE AHMET BURAK,LAV ABDULLAH HİLMİALTUN S.
|
Cost Analysis for Embedded Systems Experiments with Priced Timed Automata
Electronic Notes in Theoretical Computer Science, Vol. 238, No. 6, Haziran 2010, s. 81-95, ISSN: 15710661
OVATMAN TOLGA,ASKE BREKLİNG,MİCHAEL HANSEN
|
Determining Attribute Weights in a CBR Model for Early Cost Prediction of Structural Systems
Journal of Construction Engineering and Management, No. 132 (10), 2007, s. 345-352
DOĞAN SEVGİ ZEYNEP,DAVİD ARDİTİ,GÜNAYDIN HÜSNÜ MURAT
|
Determining Attribute Weights in a CBR Model for Early Cost Prediction of Structural Systems
Journal of Construction Engineering and Management, Vol. 132, No. 10, Ekim 2006, s. 1092-1098, ISSN: 0733-9364
DOĞAN SEVGİ ZEYNEP,ARDITI DAVID,GÜNAYDIN HÜSNÜ MURAT
|
Using Decision Trees for Determining Attribute Weights in a Case Based Model of Early Cost Prediction
Journal of Construction Engineering and Management, Vol. 134, No. 2, Şubat 2008, s. 146-152, ISSN: 0733-9364
DOĞAN SEVGİ ZEYNEP,ARDITI DAVID,GÜNAYDIN HÜSNÜ MURAT
|
Using Decision Trees for Determining Attribute Weights in a Case Based Model for Early Cost Prediction
Journal of Construction Engineering and Management, No. 134, Şubat 2006, s. 146-152
DOĞAN SEVGİ ZEYNEP,DAVİD ARDİTİ,GÜNAYDIN HÜSNÜ MURAT
|
A fuzzy multi objective model for solving project network problem with bonus and incremental penalty cost
Computers & Industrial Engineering, Vol. 82, Nisan 2015, s. 143-150, ISSN: 03608352
ÇEBİ FERHAN,OTAY İREM
|
A Fuzzy Multi Objective Model for Solving Project Network Goal Programming Problem With Bonus and Incremental Penalty Cost
Computer and Industrial Engineering, Vol. 82, 2015, s. 143-150
ÇEBİ FERHAN,İREM OTAY
|
Cost Model Approach for Next Generation Emergency Call Systems - Italy Case Study (WOS:000391099300016)
VEHITS 2016 2nd International Conference on Vehicle Technology and Intelligent Transport Systems, Roma/İTALYA, 23 Nisan 2016, s. 130-137
APAK AHMET,ÜSTOĞLU İLKER
|
A Conceptual Model for Analyzing Life Cycle Cost of Residential Windows in Turkey
The World Sustainable Building – SB08 Conference, MELBOURNE/AVUSTRALYA, Vol. 2, 21 Eylül 2008, s. 2254-2261
YAMAN HAKAN,ÇETİNER İKBAL,TAVİL GÜLTEN ASLIHAN,ÇOŞKUN KEVSER
|
A Building Cost Estimation Model Based on Functional Elements
AZ ITU Journal of the Faculty of Architecture, Vol. 4, No. 1, 2007, s. 73-87, ISSN: 2564-7571
YAMAN HAKAN,TAŞ ELÇİN FİLİZ
|
A building cost estimation model based on cost significant work packages
Engineering, Construction and Architectural Management, Vol. 12, No. 3, Haziran 2005, s. 251-263, ISSN: 0969-9988
TAŞ ELÇİN FİLİZ,YAMAN HAKAN
|
Application of nanofiltration for Rare Earth Elements recovery from coal fly ash leachate: Performance and cost evaluation
CHEMICAL ENGINEERING JOURNAL, Vol. 349, Ocak 2018, s. 309-317, ISSN: 1385-8947
KÖSE MUTLU BÖRTE, CANTONİ BEATRİCE, TUROLLA AND, MAR ANTONELLİ, HSU KİM HEİLEEN, WİESNER MARK
|
Versatile Comparison of Different Wastewater Collection and Treatment Scenarios on a Campus Model
International Symposium of Scientific Research and Innovative Studies, Balıkesir/TÜRKİYE, 22 Şubat 2021
KÖSE MUTLU BÖRTE
|
Maintenance stop time influence on aircraft total maintenane cost with downtime integrated cost model
7th International Conference on Mechanical and Aerospace Engineering (ICMAE), 18 Temmuz 2016
SALTOĞLU REMZİ,HUMAİRA NAZMİA,İNALHAN GÖKHAN
|
The University of Wisconsin Breast Cancer Epidemiology Simulation Model: An Update
MEDICAL DECISION MAKING, Vol. 38, No. null, Nisan 2018, s. 99-111, ISSN: 0272-989X
ALAGOZ OGUZHAN,ERGÜN MEHMET ALİ,ÇEVİK MÜCAHİT,SPRAGUE BRİAN L.,FRYBACK DENNİS G.,GANGNON RONALD E.,HAMPTON JOHN M.,STOUT NATASHA K.,TRENTHAM-DİETZ AMY
|
Computer Aided Design and Cost Estimation Model of Soda Ash Processes From Trona
7 th. International Mineral Processing Symposium
DURMAZHİLMİOĞLU. N,, OKUTAN. H,
|
Computer Aided Design and Cost Estimation model of Commercial Soda Ash Processes For Turkish Trona Mineral
Proceeding of The International Symposium On Modelling, Simulation and Control of Hydrometallurgical Processes,
SAYGILI. G,, OKUTAN. H,
|