ARAMA SONUÇLARI

Toplam 4 adet sonuçtan 4 tanesi görüntülenmektedir.

Arama









Yıllara göre arama

Özel Aralık Girişi

Balancing U shaped Assembly Lines by Considering Human Factors
Global Conference on Engineering and Technology Management, İSTANBUL/TÜRKİYE, 23 Haziran 2014, s. 189-195
ÖKSÜZ MEHMET KÜRŞAT,SATOĞLU ŞULE ITIR
Application of Linear Programming in Minimization of Campaign Launch Time of an GSM Operator
International Symposium of Production Research 2021, 7 Ekim 2021
CAMGÖZ AKDAĞ HATİCE, İSKENDER FATİH, KARAÇAYIR PINAR, ALAŞIK ASLI
Hatice Camgöz Akdağ Tam metin bildiri
A new approach to estimate drilling time, rate of penetration, and drillability of formations in oil and gas exploration and production basins of Turkey
Geomechanics and Geophysics for Geo-Energy and Geo-Resources, Vol. 8, Nisan 2022, ISSN: 2363-8419
ÖZDEMİR ADİL, PALABIYIK YILDIRAY, YAŞAR ERGÜL, GÜLLÜ AHMET
IT enabled Changes to Frontline Mine Planning in Large Coal Mines to Balance Production Efficiency, Long-term Schedules in Real-time
SME Annual Meeting Exhibit, Colorado/AMERİKA BİRLEŞİK DEVLETLERİ, 28 Şubat 2011
KAHRAMAN MUHAMMET MUSTAFA,DESSUREAULT SEAN

İLETİŞİM BİLGİLERİ

İstanbul Teknik Üniversitesi Rektörlüğü İTÜ Ayazağa Kampüsü Rektörlük Binası, Maslak-Sarıyer / İstanbul Tel: +90 212 285 3930