ARAMA SONUÇLARI

Toplam 10 adet sonuçtan 10 tanesi görüntülenmektedir.

Arama









Yıllara göre arama

Özel Aralık Girişi

Usage of Fuzzy Logic Method for Tunnel Boring Machines
Proceedings of the 3rd World Congress on Mechanical, Chemical, and Material Engineering (MCM’xx17), 8 Haziran 2017
ACAROĞLU ERGÜN ÖMÜR
Statistical analyses of tunnel boring machines (TBMs) between utilization, machine and rock properties
Fen Bilimleri Enstitüsü, İstanbul Teknik Üniversitesi, 2014
FARAZ SHOAEE SARBANGHOLI
Cemal Balcı Tez Yüksek Lisans Tamamlandı
TBM Performance Prediction using Laboratory Cutting Tests in Very Hard and Abrasive Rock Formations
3rd International Conference on Tunnel Boring Machines in Difficult Grounds (TBM DiGs), Wuhan/ÇİN HALK CUMHURİYETİ, 16 Kasım 2017
BİLGİN NUH,ÇOPUR HANİFİ,BALCI CEMAL,TUMAÇ DENİZ
Cemal Balcı Tam metin bildiri
Analysis of the Tunnel Boring Machines TBM Performance Parameters Using Boreability Index in Turkey
World Tunnel Congress, WTC 2014, 5 Mayıs 2014
BALCI CEMAL,BİLGİN NUH,COPUR HANİFİ,COMAKLİ RAMAZAN,POLAT CAN,SARBANGHOLİ FARAZA
Cemal Balcı Tam metin bildiri
TBM Performance Prediction using Laboratory Cutting Tests in Very Hard and Abrasive Rock Formations
International Conference on Tunnel Boring Machines in Difficult Grounds (TBM DiGs), Wuhan/ÇİN HALK CUMHURİYETİ, 21 Kasım 2017, s. 1-11
BİLGİN NUH,ÇOPUR HANİFİ,BALCI CEMAL,TUMAÇ DENİZ
Cemal Balcı Tam metin bildiri
Some Problems Related to TBM Excavation in Complex Geologu Examples and Solutions from Turkey from Past to Present
Second International Cenference on Tunnel Boring Machines in Difficult Grounds, 16 Kasım 2016
BİLGİN NUH,ÇOPUR HANİFİ,BALCI CEMAL
Cemal Balcı Tam metin bildiri
TBM Performance Prediction using Laboratory Cutting Tests in Very Hard and Abrasive Rock Formations
3rd International Conference on Tunnel Boring Machines in Difficult Grounds (TBM DiGs), Wuhan/ÇİN HALK CUMHURİYETİ, 16 Kasım 2017
BİLGİN NUH,ÇOPUR HANİFİ,BALCI CEMAL,TUMAÇ DENİZ
Hanifi Çopur Tam metin bildiri
TBM Performance Prediction using Laboratory Cutting Tests in Very Hard and Abrasive Rock Formations
International Conference on Tunnel Boring Machines in Difficult Grounds (TBM DiGs), Wuhan/ÇİN HALK CUMHURİYETİ, 21 Kasım 2017, s. 1-11
BİLGİN NUH,ÇOPUR HANİFİ,BALCI CEMAL,TUMAÇ DENİZ
Hanifi Çopur Tam metin bildiri
TBM Performance Prediction using Laboratory Cutting Tests in Very Hard and Abrasive Rock Formations
International Conference on Tunnel Boring Machines in Difficult Grounds (TBM DiGs), Wuhan/ÇİN HALK CUMHURİYETİ, 21 Kasım 2017, s. 1-11
BİLGİN NUH,ÇOPUR HANİFİ,BALCI CEMAL,TUMAÇ DENİZ
Deniz Tumaç Tam metin bildiri
EPB TBM Performance in Ayvali Waste Water Tunnel through Marl Clay Sand and Shallow Overburden
2nd INTERNATIONAL CONFERENCE ONTUNNEL BORING MACHINES IN DIFFICULT GROUNDS, 16 Kasım 2016
ÇINAR MUAMMER,ŞENER KAHYA,AVUNDUK EMRE,SAHAND TOLOUEİ,GEDİKLİ ABDULLAH,ÇOPUR HANİFİ
Emre Avunduk Tam metin bildiri

İLETİŞİM BİLGİLERİ

İstanbul Teknik Üniversitesi Rektörlüğü İTÜ Ayazağa Kampüsü Rektörlük Binası, Maslak-Sarıyer / İstanbul Tel: +90 212 285 3930