ARAMA SONUÇLARI

Toplam 147 adet sonuçtan 20 tanesi görüntülenmektedir.

Arama









Yıllara göre arama

Özel Aralık Girişi

Health and safety cost evaluation in construction projects case study: Oman DMIA project
Fen Bilimleri Enstitüsü, İstanbul Teknik Üniversitesi, 2012
ŞAFAK CINGILLIOĞLU
Gürkan Emre Gürcanlı Tez Yüksek Lisans Tamamlandı
Developing resilient construction project professionals:examining architecture students' personality perspective
Lisansüstü Eğitim Enstitüsü, İstanbul Teknik Üniversitesi, 2021
ALİME ŞANLI
Fatma Pınar Çakmak Tez Yüksek Lisans Tamamlandı
Resource leveling of a linear construction project using branch and bound algorithm
Fen Bilimleri Enstitüsü, İstanbul Teknik Üniversitesi, 2012
RESULALİ EMRE ÖRGÜT
Gül Polat Tatar Tez Yüksek Lisans Tamamlandı
Analysis of mobile bim adoption at construction site: A case study of a complex infrastructure project
Fen Bilimleri Enstitüsü, İstanbul Teknik Üniversitesi, 2018
ELİF TUĞÇE NURTAN GÜNEŞ
Esin Ergen Pehlevan Tez Yüksek Lisans Tamamlandı
Artificial intelligence influence for digitalized construction project management during planning phase
Lisansüstü Eğitim Enstitüsü, İstanbul Teknik Üniversitesi, 2024
MAHMUT EMRE KARCI
Fatma Pınar Çakmak Tez Yüksek Lisans Tamamlandı
The effect of artificial neural networks on cost estimation in construction projects: A literature review
8th International Project and Construction Management Conference, 6 Haziran 2024
ŞERBETÇİOĞLU BOĞAÇHAN,ÇAKMAK FATMA PINAR
Fatma Pınar Çakmak Tam metin bildiri
Agile methodologies in construction management: A review study on Scrum and Kanban
8th International Project and Construction Management Conference, İstanbul/TÜRKİYE, 6 Haziran 2024
TOSUN KIVANÇ,ÇAKMAK FATMA PINAR
Fatma Pınar Çakmak Tam metin bildiri
Mitigating delays and disputes in industrial construction projects: Lessons from a thermal power plant project in Turkey
Journal of Construction Engineering, Management and Innovation, Vol. 7, No. 2, Ocak 2024, ISSN: 2630-5771
GÜRCANLI GÜRKAN EMRE,ÇAPRAZ MERVE,ALP YAĞCI SELİN
Gürkan Emre Gürcanlı Özgün Makale
Overview of Financed-Based Scheduling in Construction Management Research
7 th International Project and Construction Management Conference (IPCMC 2022), istanbul/TÜRKİYE, 20 Ekim 2022
AKIN FIRAT DOĞU, DAMCI ATİLLA, ARDİTİ DAVİD, DEMİRKESEN ÇAKIR SEVİLAY
Fırat Doğu Akın Tam metin bildiri
Currency Risk Analysis on Construction Cash Flows
IPCMC 2022 - 7th International Project and Construction Management Conference, İSTANBUL/TÜRKİYE, Vol. 1, No. 1, 20 Ekim 2022, s. 1138-1144
TÜZ ÖZLEM, YAMAN HAKAN
Hakan Yaman Tam metin bildiri
The Turkish Construction Sector from a Macroeconomic Perspective
IPCMC 2022 - 7th International Project and Construction Management Conference, İSTANBUL/TÜRKİYE, Vol. 1, No. 1, 20 Ekim 2022, s. 545-562
BÜYÜKYORAN FARUK, YAMAN HAKAN
Hakan Yaman Tam metin bildiri
A Proposed Model for Estimation of Ideal Construction Duration in Housing Projects
IPCMC 2022 - 7th International Project and Construction Management Conference, İSTANBUL/TÜRKİYE, Vol. 1, No. 1, 20 Ekim 2022, s. 216-231
TIRATACI HAKAN, YAMAN HAKAN
Hakan Yaman Tam metin bildiri
Total Construction Duration Calculation of TOKI Housing Projects: A Case Study
IPCMC 2022 - 7th International Project and Construction Management Conference, İSTANBUL/TÜRKİYE, 20 Ekim 2022, s. 204-215
TIRATACI HAKAN, YAMAN HAKAN
Hakan Yaman Tam metin bildiri
Evaluation of Construction and Demolition Wastes in the Context of the Waste Framework Directive of the European Union Member States
7th International Project and Construction Management Conference (IPCMC2022), İstanbul/TÜRKİYE, 21 Ekim 2022
SÖNMEZ NURŞEN, MAÇKA KALFA SİBEL
Nurşen Sönmez Tam metin bildiri
Turkish Architectural and Civil Engineering Education within the Scope of Sustainable Construction
5. International Project Construction Management Conference, Girne/KUZEY KIBRIS TÜRK CUMHURİYETİ, 16 Kasım 2018, s. 200-208
TOPAK FATİH,TOKDEMİR ONUR BEHZAT,PEKERİÇLİ MEHMET KORAY,TANYER ALİ MURAT
Onur Behzat Tokdemir Tam metin bildiri
Exploring the Adaptability of Daily Look-Ahead Meetings in the Construction Industry
6th International Project and Construction Management Conference (e-IPCMC2020), İstanbul/TÜRKİYE, 12 Kasım 2020, s. 1318-1325
YILMAZ ANIL,TOKDEMİR ONUR BEHZAT
Onur Behzat Tokdemir Tam metin bildiri
Classification Of Construction Waste According To Lean Management Approach
6th International Project and Construction Management e-Conference (e-IPCMC-2020), İstanbul/TÜRKİYE, Vol. 1, No. 1, 12 Kasım 2020, s. 143-150
CAN GİZEM,TAŞ ELÇİN FİLİZ
Elçin Filiz Taş Tam metin bildiri
Use Of The Design Structure Matrix During The Construction Phase Of Building Production Process In Turkey
6th International Project and Construction Management e-Conference (e-IPCMC-2020), istanbul/TÜRKİYE, Vol. 1, No. 1, 12 Kasım 2020, s. 248-256
BUĞAN JİBİD,TAŞ ELÇİN FİLİZ
Elçin Filiz Taş Tam metin bildiri
Performance Forecasting Methods in Construction Industry Deterministic Approach,
6th International Project and Construction Management e-Conference (e-IPCMC-2020), İstanbul/TÜRKİYE, Vol. 1, No. 1, 12 Kasım 2020, s. 151-161
YAYLALI RÜÇHAN,TAŞ ELÇİN FİLİZ
Elçin Filiz Taş Tam metin bildiri
Safe Work Statement for Construction Activities
6th International Project and Construction Management Conference (e-IPCMC2020), 12 Kasım 2020, s. 453-463
UZUN İBRAHİM MERT,GÜRCANLI GÜRKAN EMRE
Gürkan Emre Gürcanlı Tam metin bildiri

İLETİŞİM BİLGİLERİ

İstanbul Teknik Üniversitesi Rektörlüğü İTÜ Ayazağa Kampüsü Rektörlük Binası, Maslak-Sarıyer / İstanbul Tel: +90 212 285 3930