Crashing construction projects considering schedule flexibility: an illustrative example
International Journal of Construction Management, Vol. 23, No. 4, Nisan 2023, s. 619-628, ISSN: 1562-3599
TÜRKOĞLU HARUN, POLAT TATAR GÜL, AKIN FIRAT DOĞU
|
A crashing-based time-cost trade-off model considering quality cost and contract clauses
International Journal of Construction Management, Vol. 23, No. 6, Haziran 2023, s. 954-963, ISSN: 1562-3599
AKIN FIRAT DOĞU, POLAT TATAR GÜL, TÜRKOĞLU HARUN, DAMCI ATİLLA
|
An Integrated Approach for HVAC-AHU System Selection in Green Projects
5th international Project and Construction Management Conference (IPCMC2018), 16 Kasım 2018
BAYHAN HASAN GÖKBERK,POLAT TATAR GÜL,TÜRKOĞLU HARUN,ERTURK FATMA OLCAY,GOKTAS BULENT,ARİSOY MEHMET BATİKAN
|
Construction Professionals’ Motivation: Case Study of Turkey
14TH INTERNATIONAL CONFERENCE ORGANIZATION, TECHNOLOGY AND MANAGEMENT IN CONSTRUCTION, 4 Eylül 2019
DAMCI ATİLLA,ARDİTİ DAVİD,POLAT TATAR GÜL,TÜRKOĞLU HARUN
|
Evaluation of Energy and Atmosphere Credit Achievements of LEED-Certified Buildings in Turkey
5th international Project and Construction Management Conference (IPCMC2018), 16 Kasım 2018
POLAT TATAR GÜL,TÜRKOĞLU HARUN,YİKİLMAZ NAZ,DAMCI ATİLLA
|
An Integrated Multi-Attribute-Decision-Making Approach for Main Contractor Selection: A Case Study
5th international Project and Construction Management Conference (IPCMC2018), 16 Kasım 2018
POLAT TATAR GÜL,TÜRKOĞLU HARUN,OZDEN UMUR,DAMCI ATİLLA
|
Market Selection Using the Integration of AHP and PROMETHEE Methods
14TH INTERNATIONAL CONFERENCE ORGANIZATION, TECHNOLOGY AND MANAGEMENT IN CONSTRUCTION, 4 Eylül 2019
POLAT TATAR GÜL,FİDAN GİZEM,TÜRKOĞLU HARUN,DAMCI ATİLLA
|
Selection of HVAC-AHU system supplier with environmental considerations using Fuzzy EDAS method
International Journal of Construction Management, Vol. 22, No. 10, Ekim 2022, s. 1863-1871, ISSN: 1562-3599
POLAT TATAR GÜL, BAYHAN HASAN GÖKBERK
|
Analysis of Industrial Formwork Systems Supply Chain Using Value Stream Mapping
Journal of Engineering, Project, and Production Management, Vol. 12, No. 1, Ocak 2022, s. 47-61, ISSN: 2221-6529
TERZİOGLU TAYLAN, POLAT TATAR GÜL, TÜRKOĞLU HARUN
|
Use of float consumption rate in resource leveling of construction projects
Frontiers of Engineering Management, Vol. 9, No. 1, Mart 2022, s. 135-147, ISSN: 2095-7513
DAMCI ATİLLA, POLAT TATAR GÜL, AKIN FIRAT DOĞU, TÜRKOĞLU HARUN
|
Necessity of Ecological Efficiency Indicator Modal of Air Pollutants and Emissions from Ships in Maritime Transportation: Policy Perspective
International Symposium on Energy Management and Sustainability (ISEMAS) 2022, 5 Nisan 2022
ÇALIŞKAN UFUK YAKUP, ZİNCİR BURAK
|
Using an E-fuel Method to Meet the 2030 Decarbonization Target: A Case Study
International Symposium on Energy Management and Sustainability (ISEMAS) 2022, 5 Nisan 2022
ZİNCİR BUĞRA ARDA, ZİNCİR BURAK, USLUER HASAN BORA, ARSLANOĞLU YASİN
|
A Performance-Based Subcontractor Selection Model
Journal of Construction Engineering and Management, Vol. 150, No. 8, Ağustos 2024, s. 1-14, ISSN: 0733-9364
BİNGÖL BEFRİN NEVAL,ARDİTİ DAVİD,POLAT TATAR GÜL
|
An integrative literature review on the causes of delays in construction projects: evidence from developing countries
International Journal of Construction Management, Vol. 24, No. 6, Haziran 2024, s. 610-622, ISSN: 1562-3599
SELCUK ONUR, TÜRKOĞLU HARUN, POLAT TATAR GÜL, HAJDU MİKLOS
|
Scheduling Asphalt Highway Construction Operations Using the Combination of Line of Balance and Discrete Event Simulation Techniques
IEEM International Conference on Industrial Engineering and Engineering Management (IEEM09), 8 Aralık 2009
POLAT TATAR GÜL,BUYUKSARACOGLU YALCİN,DAMCI ATİLLA
|
Cold chain logistics for frozen food at tourism destinations
Pressacademia, Vol. 4, No. 2, Haziran 2017, s. 159-167, ISSN: 2146-7943
TALAY DEĞİRMENCİ IŞILAY,KARAYÜN İSMAİL,ÖZDEMİR AKYILDIRIM ÖZNUR
|
Stakeholder Perspectives on E Waste Take BackLegislation
PRODUCTION AND OPERATIONS MANAGEMENT, Vol. 22, No. 2, Mart 2013, s. 382-396, ISSN: 1059-1478
ATASU ATALAY,ÖZDEMİR ÖZNUR,VAN WASSENHOVE LUK
|
A Resource Based and Context Dependent Model of Firm Competitiveness
17th Annual Conference of the Production and Operations Management Society, Boston/AMERİKA BİRLEŞİK DEVLETLERİ, 28 Nisan 2006
ÖZDEMİR ÖZNUR,DENİZEL KARAKAYA EMİNE MELTEM
|
Predicting Cost Impacts of Nonconformances in Construction Projects Using Interpretable Machine Learning
Journal of Construction Engineering and Management, Vol. 150, No. 1, Ocak 2024, ISSN: 0733-9364
KOÇ KERİM, BUDAYAN CENK, EKMEKCİOĞLU ÖMER, TOKDEMİR ONUR BEHZAT
|
Predicting the Cost of Rework in High-Rise Buildings Using Graph Convolutional Networks
Journal of Construction Engineering and Management, Vol. 150, No. 8, Ağustos 2024, ISSN: 0733-9364
MOSTOFİ FATEMEH,TOKDEMİR ONUR BEHZAT,TOĞAN VEDAT,ARDİTİ DAVİD
|