The New Severity Scale of Occupational Accidents for Construction Projects
5th International Project and Construction Management Conference (IPCMC 2018), 16 Kasım 2018
BİLİR MAHÇİÇEK SENEM,GÜRCANLI GÜRKAN EMRE
|
The Impact of the COVID-19 Outbreak on Customer Purchasing Behavior in the E-commerce Sector Project
International Symposium of Production Research 2023 (ISPR2023), Antalya/TÜRKİYE, 5 Ekim 2023
PINAR ARTUN, YENİCE ONUR HALİT, ÖZCAN TUNCAY, KONYALIOĞLU AZİZ KEMAL, BELDEK TUĞÇE
|
Investıgatıon of Productıvıty in the Constructıon Industry
6th International Project and Construction Management Conference, İstanbul/TÜRKİYE, 12 Kasım 2020, s. 641-644
BİLİR MAHÇİÇEK SENEM, GÜRCANLI GÜRKAN EMRE
|
The New Severity Scale of Occupational Accidents for Construction Projects
5th International Project and Construction Management Conference (IPCMC 2018), 16 Kasım 2018
BİLİR MAHÇİÇEK SENEM,GÜRCANLI GÜRKAN EMRE
|
Integrating Facilities Management Data in Building InformationModelling
5th International Project and Construction Management Conference (IPCMC 2018), 16 Kasım 2018
KULA BEHLÜL,GÜVEN IŞIN GÜRŞANS,ARTAN DENİZ,ERGEN PEHLEVAN ESİN
|
What Makes Space a Place Deleuzian Reading of Spatial Multiplicities and Transfiguring Ontology of Space as a Becoming
The Space and Place Project: 7th Global Meeting, Oxford/İNGİLTERE, 1 Eylül 2016
GÖRGÜL EMİNE
|
‘Project Kapıdağ: Locality of Production’: A Case of Research for Social Design in Complex Collaboration
the Academy for Design Innovation Management Conference, London/İNGİLTERE, 18 Haziran 2019
ÖZ GİZEM, ATEŞ AKDENİZ AYSUN
|
Agile methodologies in construction management: A review study on Scrum and Kanban
8th International Project and Construction Management Conference, İstanbul/TÜRKİYE, 6 Haziran 2024
TOSUN KIVANÇ,ÇAKMAK FATMA PINAR
|
Mitigating Seismic Risks in Historical Masonry An Example Project
2nd ATC-SEI Conference on Improving the Seismic Performance of Existing Building and Other Structures, San Francisco/AMERİKA BİRLEŞİK DEVLETLERİ, 10 Aralık 2015
BAL İHSAN ENGİN,SMYROU ELENİ,GÜNEŞ BURCU,İLKİ ALPER
|
Follow-up on Assessment of Student Outcomes by Senior-Year Design Project and Continuing to Improve by Performance Indicator Breakdown-Based Assessment
International Journal of Engineering Pedagogy (iJEP), Vol. 8, No. 5, Ekim 2018, s. 19-28, ISSN: 2192-4880
DÜLEKGÜRGEN EBRU,GÖMEÇ ÇİĞDEM,KARAHAN ÖZGÜN ÖZLEM,AYDIN BAŞAK,GÜVEN HÜSEYİN
|
Follow-up on Rubric-Based Assessment of Student Outcomes by Senior-Year Graduation Design Project and Continuing to Improve by Performance Indicator Breakdown-Based Assessment
ICL2017 Int. Conf. on Interactive Collaborative Learning, BUDAPEŞTE/MACARİSTAN, 27 Eylül 2017
DÜLEKGÜRGEN EBRU,YANGIN GÖMEÇ ÇİĞDEM,KARAHAN ÖZGÜN ÖZLEM,AYDIN BAŞAK,GÜVEN HÜSEYİN
|
The Liquidation Process of an Enlightenment Project People's Houses
International Review of Turkology, Vol. 1, No. 1, Ocak 2008, s. 15-28, ISSN: 1308-0105
MALKOÇ EMİN ALP
|
Industry 4.0 project prioritization by using spherical fuzzy analytic, hierarchy process
14th International FLINS Conference (FLINS 2020), 18 Ağustos 2020, s. 1464-1472
KAHRAMAN CENGİZ,OTAY İREM,ÖZTAYŞİ BAŞAR,ÇEVİK ONAR SEZİ
|
An Analysis of Research Trends in Construction Project Management
The International Research Conference, Manchester/İNGİLTERE, 11 Eylül 2017, s. 472-481
ÇAKMAK FATMA PINAR,İLHAN BAHRİYE
|
Game-Based Learning about the Circular Economy in Building Sustainable Communities: A Case of International and Interdisciplinary University Collaboration
International Journal of Sustainability in Higher Education, Vol. 25, No. 9, Ekim 2024, s. 378-396, ISSN: 1467-6370
AKÇAKAYA WAITE JR İMGE,AKÇAY KAVAKOĞLU AYŞEGÜL,ROBESCU LACRAMIOARA DIANA,COCARTA DIANA MARIANA,VUTA LIANA IOANA
|
Digital transformation project selection using interval valued type-2 intuitionistic fuzzy TOPSIS
International Conference on Intuitionistic Fuzzy Sets (ICIFS'2022) 9–10 September 2022, Sofia, Bulgaria, Vol. 1, 9 Eylül 2022
KAHRAMAN CENGİZ, ÇEBİ SELÇUK, ÖZTAYŞİ BAŞAR, ÇEVİK ONAR SEZİ
|
VIP MAN AN IMAGE BASED WHOLE BODY ADULT MALE MODEL CONSTRUCTED FROM COLOR PHOTOGRAPHS OF THE VISIBLE HUMAN PROJECT FOR MULTI PARTICLE MONTE CARLO CALCULATIONS
Health Physics, PHILADELPHIA, PA/AMERİKA BİRLEŞİK DEVLETLERİ, Vol. 78, No. 5, Mayıs 2000, s. 476-486, ISSN: 0017-9078
X G XU,T C CHAO,BOZKURT AHMET
|
An investigation on algorithm aided BIM approaches to increase collaboration and optimisation in project phase: A case study
A/Z : ITU journal of Faculty of Architecture, Vol. 15, No. 1, Mart 2018, s. 66-75, ISSN: 2564-7474
YILDIRIM ŞEYMANUR,ALAÇAM SEMA
|
From Social Networking To Social Distance: How Did Architects React To The Pandemic? Evidence From Social Media Accounts
6th International Project and Construction Management Conference - eIPCMC 2020, 12 Kasım 2020
İLTER AKIN TOLGA
|
Istanbul Marmaray Project Alterations in environmental impact and external costs
Ozean Journalof Applied Sciences, Vol. 2, No. 4, Aralık 2009, s. 385-398
ÖZTÜRK ZÜBEYDE
|