A set of indices based on indentation tests for assessment of rock cutting performance and rock properties
Journal of The South African Institute of Mining and Metallurgy, Kasım 2003
COPUR HANİFİ,BİLGİN NUH,TUNCDEMİR HAKAN,BALCI CEMAL
|
Design of high performance mutually coupled circuits
Analog Integrated Circuits and Signal Processing, Vol. 66, No. 1, 2011, s. 81-91
GÜNEŞ ECE OLCAY,ZEKİ ALİ,TOKER ALİ
|
A Performance-Based Subcontractor Selection Model
Journal of Construction Engineering and Management, Vol. 150, No. 8, Ağustos 2024, s. 1-14, ISSN: 0733-9364
BİNGÖL BEFRİN NEVAL,ARDİTİ DAVİD,POLAT TATAR GÜL
|
Performance of Leed Energy Credit Requirements in European Countries
Creative Construction Conference – CC2016, Budapeşte/MACARİSTAN, 25 Haziran 2016, s. 522-527
GÜRGÜN ASLI PELİN,POLAT TATAR GÜL,DAMCI ATİLLA,BAYHAN HASAN GÖKBERK
|
Effect of Soil Conditioning on Performance of an EPB TBM: from Laboratory to Mahmutbey-Mecidiyekoy Metro Tunnels in Turkey
World Tunnel Congress (WTC 2018), 21 Nisan 2018
ÇOPUR HANİFİ,AVUNDUK EMRE,TUMAÇ DENİZ,BALCI CEMAL,BİLGİN NUH,SHATERPOUR MAMAGHANİ AYDIN,TOLOUEI SAHAND,ERKUŞ GOKHAN,ACUN SİNAN,ATEŞ UĞUR
|
TBM Performance Prediction using Laboratory Cutting Tests in Very Hard and Abrasive Rock Formations
3rd International Conference on Tunnel Boring Machines in Difficult Grounds (TBM DiGs), Wuhan/ÇİN HALK CUMHURİYETİ, 16 Kasım 2017
BİLGİN NUH,ÇOPUR HANİFİ,BALCI CEMAL,TUMAÇ DENİZ
|
Analysis of the Tunnel Boring Machines TBM Performance Parameters Using Boreability Index in Turkey
World Tunnel Congress, WTC 2014, 5 Mayıs 2014
BALCI CEMAL,BİLGİN NUH,COPUR HANİFİ,COMAKLİ RAMAZAN,POLAT CAN,SARBANGHOLİ FARAZA
|
Measuring Quality Performances of Subcontractors Using Key Performance Indicators KPIs Model
12th International Congress on Advances in Civil Engineering, 21 Eylül 2016
BİNGÖL BEFRİN NEVAL,POLAT TATAR GÜL
|
Raise Boring Machine performance in the Yusufeli Dam and HEPP Project
World Tunnelling Congress (WTC 2017), 9 Haziran 2017
SHATERPOUR MAMAGHANİ AYDIN,ÇOPUR HANİFİ,BİLGİN NUH,KOÇBAY AYHAN,ERDOĞAN TAYFUN
|
Empirical Performance Prediction for Raise Boring Machines Based on Rock Properties, Pilot Hole Drilling Data and Raise Inclination
ROCK MECHANICS AND ROCK ENGINEERING, Vol. 54, No. 4, Nisan 2021, s. 1707-1730, ISSN: 0723-2632
SHATERPOUR MAMAGHANİ AYDIN, ÇOPUR HANİFİ
|
Effect of Soil Conditioning on the EPB-TBM Excavation Performance: A Case Study of Dudullu-Bostanci Metro Project, Turkey
World Tunnel Congress (WTC 2020), Kuala Lumpur/MALEZYA, 15 Mayıs 2020
TUMAÇ DENİZ, SEYEDREZAEİ MİRALİ, KOÇ ENVER, SHATERPOUR MAMAGHANİ AYDIN, ÇOPUR HANİFİ, AVUNDUK EMRE
|
Performance of Raise Boring Machine (RBM) in Low to Moderately Hard Hornfels Rocks: A case Study of Efemcukuru Gold Mine in Turkey.
World Tunnel Congress, WTC2020, Kuala Lumpur/MALEZYA, 15 Mayıs 2020
SHATERPOUR MAMAGHANİ AYDIN, ÇOPUR HANİFİ, TUMAÇ DENİZ, BALCI CEMAL, ALTINTAŞ ERGÜN, ERDOĞAN TAYFUN
|
Effect of Soil Conditioning on Performance of an EPB TBM: from Laboratory to Mahmutbey-Mecidiyekoy Metro Tunnels in Turkey
World Tunnel Congress (WTC 2018), 21 Nisan 2018
ÇOPUR HANİFİ,AVUNDUK EMRE,TUMAÇ DENİZ,BALCI CEMAL,BİLGİN NUH,SHATERPOUR MAMAGHANİ AYDIN,TOLOUEI SAHAND,ERKUŞ GOKHAN,ACUN SİNAN,ATEŞ UĞUR
|
On the development of robust performance risk indicators for hard rock TBMs
4th International Underground Excavations Symposium, İstanbul/TÜRKİYE, 13 Eylül 2018, s. 173-178
NAGHADEHİ MASOUD ZARE,TOPRAQLOU P HAGİ,ÇOPUR HANİFİ
|
Determining the Effects of Physical, Mechanical and Textural Properties ofMetamorphic Stones on a Chisel Tool Performance
10th Asian Rock Mechanics Symposium The ISRM International Symposium for 2018, 29 Ekim 2018
TUMAÇ DENİZ,ÇOPUR HANİFİ,BALCI CEMAL,SHATERPOUR MAMAGHANİ AYDIN,ER SELMAN,AVUNDUK EMRE
|
Study of the impacts of geological-geotechnical parameters on the performance of raise boring machine (RBM) during pilot hole drilling
10th Asian Rock Mechanics Symposium “ARMS10”, 29 Ekim 2018
SHATERPOUR MAMAGHANİ AYDIN,ÇOPUR HANİFİ,DOĞAN ENGİN,ERDOĞAN TAYFUN
|
Performance Evaluation of Raise Boring Machine (RBM) used in Balya Lead-Zinc Mine
4th International Underground Excavations Symposium, İstanbul/TÜRKİYE, 13 Eylül 2018, s. 317-325
ERDOĞAN TAYFUN,DOĞAN ENGİN,SHATERPOUR MAMAGHANİ AYDIN,ÇOPUR HANİFİ
|
TBM Performance Prediction using Laboratory Cutting Tests in Very Hard and Abrasive Rock Formations
3rd International Conference on Tunnel Boring Machines in Difficult Grounds (TBM DiGs), Wuhan/ÇİN HALK CUMHURİYETİ, 16 Kasım 2017
BİLGİN NUH,ÇOPUR HANİFİ,BALCI CEMAL,TUMAÇ DENİZ
|
Some geological and geotechnical factors affecting the performance of a roadheader in an inclined tunnel
Tunnelling and Underground Space Technology, Vol. 19, No. 6, Kasım 2004, s. 629-636, ISSN: 08867798
BİLGİN NUH,DİNÇER TURGAY,ÇOPUR HANİFİ,ERDOĞAN MUSTAFA
|
Predicting performance of EPB TBMs by using a stochastic model implemented into a deterministic model
Tunnelling and Underground Space Technology, Vol. 42, Mayıs 2014, s. 1-14, ISSN: 08867798
ÇOPUR HANİFİ,AYDIN HAMİT,BİLGİN NUH,BALCI CEMAL,TUMAÇ DENİZ,DAYANÇ CAN
|