ARAMA SONUÇLARI

Toplam 30 adet sonuçtan 20 tanesi görüntülenmektedir.

Arama









Yıllara göre arama

Özel Aralık Girişi

A Building Cost Estimation Model Based On Functional Elements
A|Z ITU Journal of the Faculty of Architecture, Vol. 4, No. 1, Ocak 2007, s. 73-87
YAMAN HAKAN,TAŞ ELÇİN FİLİZ
Elçin Filiz Taş Özgün Makale
COMPUTER AIDED DESIGN AND COST ESTIMATION MODEL OF COMMERCIAL SODA ASHPROCESSES FOR TURKISH TRONA MINERAL
MODELLING, SIMULATION AND CONTROL HYDROMETALLURGICAL PROCESSES, Vol. 1, No. null, Ocak 1993, s. 213-222
SAYGILI G , OKUTAN H
Hasan Can Okutan Özgün Makale
Versatile Comparison of Different Wastewater Collection and Treatment Scenarios on a Campus Model
International Symposium of Scientific Research and Innovative Studies, Balıkesir/TÜRKİYE, 22 Şubat 2021
KÖSE MUTLU BÖRTE
Time Cost Quality Trade off Model for Subcontractor Selection Using Discrete Particle Swarm Optimization Algorithm
31st Annual ARCOM Conference, 7 Eylül 2015
BİNGÖL BEFRİN NEVAL,POLAT TATAR GÜL
Gül Polat Tatar Tam metin bildiri
Cost Model Approach for Next Generation Emergency Call Systems - Italy Case Study (WOS:000391099300016)
VEHITS 2016 2nd International Conference on Vehicle Technology and Intelligent Transport Systems, Roma/İTALYA, 23 Nisan 2016, s. 130-137
APAK AHMET,ÜSTOĞLU İLKER
İlker Üstoğlu Tam metin bildiri
Cost Analysis for Embedded Systems Experiments with Priced Timed Automata
Electronic Notes in Theoretical Computer Science, Vol. 238, No. 6, Haziran 2010, s. 81-95, ISSN: 15710661
OVATMAN TOLGA,ASKE BREKLİNG,MİCHAEL HANSEN
Computer Aided Design and Cost Estimation Model of Soda Ash Processes From Trona
7 th. International Mineral Processing Symposium
DURMAZHİLMİOĞLU. N,, OKUTAN. H,
Hasan Can Okutan Tam metin bildiri
Computer Aided Design and Cost Estimation model of Commercial Soda Ash Processes For Turkish Trona Mineral
Proceeding of The International Symposium On Modelling, Simulation and Control of Hydrometallurgical Processes,
SAYGILI. G,, OKUTAN. H,
Hasan Can Okutan Tam metin bildiri
A Building Cost Estimating Model Based on Cost Significant Work Packages
Engineering, Construction and Architectural Management, Vol. 3, No. 12, 2005, s. 251 – 263, ISSN: 0969-9988, Emerald
Y. DOC. DR. ELCIN TAS, Y. DOC. DR. HAKAN YAMAN
“A Building Cost Estimation Model Based On Functional Elements”
A|Z ITU Journal of the Faculty of Architecture, Vol. Vol:4, No. No: 1, Ocak 2007, s. s. 73-87, ISSN: 1302-8324
Y. DOC. DR. HAKAN YAMAN, Y. DOC. DR. ELCIN TAS

İLETİŞİM BİLGİLERİ

İstanbul Teknik Üniversitesi Rektörlüğü İTÜ Ayazağa Kampüsü Rektörlük Binası, Maslak-Sarıyer / İstanbul Tel: +90 212 285 3930