3 kJ Plasma Focus System: Design, Construction and Experiments
13th International Conference on Emerging Nuclear Energy Systems, 2007, s. 1-4
|
Seismic Performance of Code Designed Split-X Braced Frames
Nordic Steel Construction Conference, Eylül 2012, s. 137-145
VATANSEVER C., DURGUN Y., YARDIMCI N.
|
Automated Construction Scheduling & Cost Estimation for Designers
First Conference on The Future of the AEC Industry, Mart 2005, s. 16-31
ELIF S. YAGMUR KILIMCI, CHARLES M. EASTMAN
|
Report on the Results of Sub-Task 2.3.1: Analysis and Integration of Benchmarking Data
CILECCTA (A user-oriented, knowledge-based suite of Construction Industry LifE Cycle CosT Analysis s, 2010, AB 7. Çerçeve Proje Raporu (Proje No 229061)
F. CALISIR, A. DIKBAS, H. GIRITLI, E. ERGEN, D. ILTER, I. TEKCE
|
Investigation of price banks and life cycle inventories for pan-European life cycle cost analysis system
CIB W078 2011- IT for Construction Conference, Ekim 2011
ERGEN E, DIKBAS A, TEKCE I, ILTER D, GIRITLI H, JABLONSKI M, KOWALSKA A
|
An Investigation of the Factors Influencing Dispute Frequency in Construction Projects
RICS & CIB International Research Conference (COBRA 2009), 2009
, D. ILTER, A. DIKBAS
|
An Analysis Of Dispute Resolution Literature in Construction Management Journals
BEAR 2008 & CIB W89: International Conference in Building Education an, 2008
, D. ILTER, A. DIKBAS
|
A Building Cost Estimating Model Based on Cost Significant Work Packages
Engineering, Construction and Architectural Management, Vol. 3, No. 12, 2005, s. 251 – 263, ISSN: 0969-9988, Emerald
Y. DOC. DR. ELCIN TAS, Y. DOC. DR. HAKAN YAMAN
|
Electrical Resistivity Measurements for Quality Control during Concrete Construction
ACI Materials Journal, Vol. 105, No. 6, 2008, s. 541-547, American Concrete Institute
OZKAN SENGUL AND ODD E GJORV
|
A Financial Planning Model Based on Risks for Contracting Firms Operating in Inflationary Environments
The Organisation and Management of Construction-Shaping Theory and Pra, 1996, s. 138-148 Vol.2
ARAS. GOR. DR. ELCIN TAS
|
Opinions of legal professionals regarding the use of ADR in the construction industry
CIB WORLD International Congress, 2010
D. ILTER, A. DIKBAS
|
The Use of Key Attributes in ADR Process Design
24th Annual Association of Researchers in Construction Management Conf, 2008, s. 455-464
D. ILTER, A. DIKBAS
|
Assessing the Effect of Building Elements on Post-Construction Period Environmental Sustainability of Residential Buildings for Renewal Decisions
3rd CIB International Conference on Smart and Sustainable Built Envir, Haziran 2009, s. On Flash Drive
IKBAL CETINER, ECEM EDIS
|
Investigation of price banks and life cycle inventories for pan-European life cycle cost analysis system
CIB W078 2011- IT for Construction Conference, Ekim 2011
ERGEN E, DIKBAS A, TEKCE I, ILTER D, GIRITLI H, JABLONSKI M, KOWALSKA A
|
Hot box measurements of pumice aggregate concrete hollow block walls
Construction and Building Materials, No. 38, Ocak 2013, s. 837-845
HULYA KUS, ERTAN OZKAN, OZGUR GOCER, ECEM EDIS
|
Modulus of Elasticity of Substandard and Normal Concretes
Journal of Construction and Building Materials, Vol. 25, No. 4, 2011, s. 1645 – 1652
HASAN YILDIRIM, OZKAN SENGUL
|
A Survey of the Use of IT in Building Product Information Acquisition in Turkey
Electronic Journal of Information Technology in Construction, No. 12, Mayıs 2007, s. 323-335, ISSN: 1874-4753
Y. DOC. DR. ELCIN TAS, ARAS. GOR. PINAR IRLAYICI
|
An Analysis of the Key Challenges to the Widespread Use of Mediation in the Turkish Construction Industry
International Journal of Law in the Built Environment, Vol. 1, No. 2, 2009, s. 143-155
DENIZ ILTER, ATTILA DIKBAS
|
Electrical Resistivity Measurements for Quality Control during Concrete Construction
ACI Materials Journal, Vol. 105, No. 6, 2008, s. 541-547, American Concrete Institute
OZKAN SENGUL AND ODD E GJORV
|
Construction Mediation in Turkey and an Overview of the Draft Mediation Law
RICS & CIB International Research Conference (COBRA 2008), 2008
D. ILTER, A. DIKBAS
|