Self cleansing Design of Circular Urban Drainage Channels
The 3rd International Conference, Water Across Time in Engineering Research, Constanta/ROMANYA, 23 Haziran 2016, s. 245-252
SAFARİ MİR JAFAR SADEGH,AKSOY HAFZÜLLAH,ÜNAL NECATİ ERDEM,MOHAMMADİ MİRALİ
|
Low flow forecasting with a lead time of 14 days for navigation and energy supply in the Rhine River
EGU General Assembly 2011, Vienna/AVUSTURYA, 6 Nisan 2011
DEMİREL MEHMET CÜNEYD,BOOİJ MARTİJN J,HOEKSTRA ARJEN Y
|
William Forsythe Choreography and Architectural Space Time Space and the Human Body, An Interdiciplinary Look
Oxford/İNGİLTERE, 2016, s. 11-20, Inter-Disciplinary Press
AY BETÜL,DURSUN ÇEBİ PELİN
|
Forecasting Shanghai Containerized Freight Index by Using Time Series Models
Marine Science and Technology Bulletin, Vol. 10, No. 4, Ocak 2021, s. 426-434, ISSN: 2147-9666
KOYUNCU KAAN, TAVACIOĞLU LEYLA
|
Timeless Spaces in Today’s Architecture: Discussing Today’s Architecture Through Terry Gilliam’s Brazil and Michael Radford’s 1984 Time Space and the Human Body, An Interdiciplinary Look
Oxford/İNGİLTERE, 2016, s. 117-126, Inter-Disciplinary Press
GÜNAL HAZAL,DURSUN ÇEBİ PELİN
|
Gezi Park Protests: New Definitions of Body and Space in City Time Space and the Human Body, An Interdiciplinary Look
Oxford/İNGİLTERE, 2016, s. 71-80, Brill
ÖZTOPRAK ELİF GÖZDE,DURSUN ÇEBİ PELİN
|
Effect of microwave irradiation temperature and holding time on municipal wastewater sludge disintegration
2nd International Conference on Civil and Environmental Engineering (ICOCEE - Cappadocia - 2017), NEVŞEHİR/TÜRKİYE, 8 Mayıs 2017
KOR BIÇAKCI GÖKÇE,ÇOKGÖR EMİNE,ESKICIOGLU CIGDEM
|
MRI Compatible Fiber Optic Multi Sensor Platform for Real Time Vital Monitoring
Journal of Lightwave Technology, Vol. 39, Ocak 2021, ISSN: 0733-8724
ZOLFAGHARİ PARVİZ, ERDEN OĞUZ KAAN, FERHANOĞLU ONUR, TÜMER MURAT, YALÇINKAYA ARDA DENİZ
|
Monthly River Discharge Prediction by Wavelet Fuzzy Time Series Method
International Journal of Uncertainty, Fuzziness and Knowledge-Based Systems, Vol. 29, No. 1, Ocak 2021, s. 17-35, ISSN: 0218-4885
BAŞAKIN EYYUP ENSAR, ÖZGER MEHMET
|
Real Time Adherence to Plan Screen for Mine Control Rooms
Business Process Improvement (BPI) Conference, Rapid City/AMERİKA BİRLEŞİK DEVLETLERİ, 1 Mayıs 2011
KAHRAMAN MUHAMMET MUSTAFA,DESSUREAULT SEAN
|
Determination of Rainfall Time Distributions of Turkey by Using Cluster Analysis Abstract Oral Presentation
5th Annual Meeting of the European Meteorological Society (EMS), 12 Eylül 2005
GÜNEL MUSTAFA SİNAN,DEMİREL MEHMET CÜNEYD,KUCUK MURAT,AGİRALİOGLU NECATİ
|
Time resolved and orientation dependent electric field induced strains in lead zirconate titanate ceramics
Applied Physics Letters, Vol. 90, No. 17, Ocak 2007, s. 172909, ISSN: 00036951
JONES J L,PRAMANİCK A,NİNO J C,MOTAHARİ M S,ÜSTÜNDAĞ ERSAN,DAYMOND M R,OLİVER E C
|
Turkish Books which Prepared for Engineering Education in the Time of Mehmed Refik Fenmen’s Civil Engineering School Directorate
4th International Symposium on Philosophy, Education, Arts and History of Science,, Muğla/TÜRKİYE, 14 Nisan 2021
VURAL HANDE, ÇÖKELEZ AYTEKİN, BARUTÇU BURAK
|
Acute effect of micropollutants on an activated sludge system with high sludge retention time operated as a sequencing batch reactor
10th IWA International Symposium on Waste Management problems in Agro-Industries, Rhodos/YUNANİSTAN, 19 Haziran 2019
ÇİFTÇİOĞLU BENGİSU,ESMA DEMİRKAYA,SALİH ESRA,SOYLU DİLŞAD,ÖZYILDIZ GÖKŞİN,ZENGİN BALCI GÜLSÜM EMEL,GÜVEN DİĞDEM,PALA ÖZKÖK İLKE,ÇOKGÖR EMİNE,OKUTMAN TAŞ DİDEM
|
Reconfiguration of Distribution Network for Transformer Life Extension Using Quasi-static Time-Series Analysis
ARABIAN JOURNAL FOR SCIENCE AND ENGINEERING, Vol. 45, No. 3, Mart 2020, s. 1703-1713, ISSN: 2193-567X
UÇAR BANU,BAĞRIYANIK MUSTAFA
|
A Real-Time Localization Method For AGVs In Smart Factories
III International Scientific Conference on Hihg Technologies Business Society, Brovest/BULGARİSTAN, 12 Mart 2018, s. 9-14
TEMELTAŞ HAKAN
|
Qualitative Cross Impact Analysis with Time Consideration
35th International Conference on Computers and Industrial Engineering, 19 Haziran 2005, s. 185-190
ASAN UMUT,SERDAR ASAN ŞEYDA
|
Time Domain SAR Raw Data Simulation of Distributed Targets
EURASIP Journal on Advances in Signal Processing, Vol. 2010, No. 1, Ocak 2010, s. 1-12, ISSN: 1687-6180
DOGAN OZAN,KARTAL MESUT
|
Graphene oxide and graphene fiber produced by different nozzle size, feed rate and reduction time with vitamin C
Journal of Industrial Textiles, Vol. 48, No. 1, Haziran 2018, s. 292-303, ISSN: 1528-0837
UÇAR NURAY,GÖKÇELİ GÖKÇEN,ÖZSEV YÜKSEK İLKAY,ÖNEN HACER AYŞEN,YAVUZ NİLGÜN
|
BIM Based Time Management Among Construction Contractors in Turkey
Periodica Polytechnica Architecture, Vol. 52, No. 2, Temmuz 2021, s. 192-204, ISSN: 0324-590X
SARAÇ ÇIRACIOĞLU AYŞEN, YAMAN HAKAN
|