Resource Leveling of Railway Track Construction Operations Using the Linear Scheduling and Genetic Algorithm Techniques
International Conference on Construction and Real Estate Management, BRISBANE/AVUSTRALYA, Vol. 1, 1 Aralık 2010, s. 105-110
DAMCI ATİLLA,POLAT TATAR GÜL
|
Mathematical Multiobjective Optimization Model for Trade-Offs in Small-Scale Construction Projects
Journal of Construction Engineering and Management, Vol. 149, No. 7, Temmuz 2023, s. 1-12, ISSN: 0733-9364
TÜRKOĞLU HARUN, ARDİTİ DAVİD, POLAT TATAR GÜL
|
An integrative literature review on the causes of delays in construction projects: evidence from developing countries
International Journal of Construction Management, Vol. 24, No. 6, Haziran 2024, s. 610-622, ISSN: 1562-3599
SELCUK ONUR, TÜRKOĞLU HARUN, POLAT TATAR GÜL, HAJDU MİKLOS
|
Predicting the Outcome of Construction Litigation Using Neural Networks
Computer-Aided Civil and Infrastructure Engineering, Vol. 13, No. 2, Mart 1998, s. 75-81, ISSN: 1093-9687
ARDİTİ DAVİD,OKSAY FATİH E,TOKDEMİR ONUR BEHZAT
|
Construction Safety Risk Model with Construction Accident Network: A Graph Convolutional Network Approach
Sustainability, Vol. 14, Kasım 2022, ISSN: 2071-1050
MOSTOFİ FATEMEH, TOĞAN VEDAT, AYÖZEN YUNUS EMRE, TOKDEMİR ONUR BEHZAT
|
Delay Risk Assessment of Repetitive Construction Projects Using Line-of-Balance Scheduling and Monte Carlo Simulation
Journal of Construction Engineering and Management, Vol. 145, No. 2, Şubat 2019, ISSN: 0733-9364
TOKDEMİR ONUR BEHZAT, EROL HÜSEYİN, DİKMEN TOKER İREM
|
Exploring the Adaptability of Daily Look-Ahead Meetings in the Construction Industry
6th International Project and Construction Management Conference (e-IPCMC2020), İstanbul/TÜRKİYE, 12 Kasım 2020, s. 1318-1325
YILMAZ ANIL,TOKDEMİR ONUR BEHZAT
|
Turkish Architectural and Civil Engineering Education within the Scope of Sustainable Construction
5. International Project Construction Management Conference, Girne/KUZEY KIBRIS TÜRK CUMHURİYETİ, 16 Kasım 2018, s. 200-208
TOPAK FATİH,TOKDEMİR ONUR BEHZAT,PEKERİÇLİ MEHMET KORAY,TANYER ALİ MURAT
|
Risk Management of Construction Projects by Implementation of Lean Construction and Building Information Modelling
IES’20 International Engineering Symposium | Engineering Applications in Industry (Virtual), İzmir/TÜRKİYE, 5 Aralık 2020
COŞKUN CANSU, TOKDEMİR ONUR BEHZAT
|
Research Development of Lean Construction Journal: A Bibliometric Analysis
Lean Construction Journal, No. 2019, Ekim 2019, s. 47-63, ISSN: 1555-1369
SAYGILI MURATHAN,ERDEKLİ YUSUF KEMAL,TOKDEMİR ONUR BEHZAT
|
BIM EXECUTION PROCESS OF CONSTRUCTION COMPANIES FOR BUILDING PROJECTS
Ninth International Structural Engineering and Construction Conference, Valensiya/İSPANYA, 24 Temmuz 2017
GERÇEK BİLGE,TOKDEMİR ONUR BEHZAT,İLAL MUSTAFA EMRE,GÜNAYDIN HÜSNÜ MURAT
|
Development of zero-based budgeting approach for multinational construction contractors
Engineering, Construction and Architectural Management, Vol. 30, No. 10, Ağustos 2023, s. 5217-5232, ISSN: 0969-9988
KAZAR GÖKHAN, MUTLU UĞUR, TOKDEMİR ONUR BEHZAT
|
Accident Analysis for Construction Safety Using Latent Class Clustering and Artificial Neural Networks
Journal of Construction Engineering and Management, Vol. 146, No. 3, Mart 2020, ISSN: 0733-9364
AYHAN BİLAL UMUT,TOKDEMİR ONUR BEHZAT
|
A Bibliometric Review of Disputes in The Construction Projects
Creative Construction Conference 2024, Prag/ÇEK CUMHURİYETİ, 29 Haziran 2024, s. 1-6
TURKYİLMAZ AYNUR HURRİYET,ARMANGİL GOKALP AYSE FERİDE,POLAT TATAR GÜL
|
A LITERATURE REVIEW ON RISK FACTORS ON INTERNATIONAL CONSTRUCTION PROJECTS
Fifth European and Mediterranean Structural Engineering and Construction Conference: Developing Materials and Structures for Sustainable Engineering, Vilnius/LİTVANYA, Vol. 11, No. 2, 13 Mayıs 2024, s. 1-6, ISSN: 2644-108X
AKYOL MUHAMMET,POLAT TATAR GÜL,GÜRGÜN ASLI PELİN
|
Construction Professionals’ Motivation: Case Study of Turkey
14TH INTERNATIONAL CONFERENCE ORGANIZATION, TECHNOLOGY AND MANAGEMENT IN CONSTRUCTION, 4 Eylül 2019
DAMCI ATİLLA,ARDİTİ DAVİD,POLAT TATAR GÜL,TÜRKOĞLU HARUN
|
Comparison of ANN and MRA Approaches to Estimate Bid Mark Up Size in Public Construction Projects
Creative Construction Conference – CC2016, Budapeşte/MACARİSTAN, 25 Haziran 2016, s. 335-340
POLAT TATAR GÜL,BİNGÖL BEFRİN NEVAL,GÜRGÜN ASLI PELİN,YEL BÜLENT
|
Crashing construction projects considering schedule flexibility: an illustrative example
International Journal of Construction Management, Vol. 23, No. 4, Nisan 2023, s. 619-628, ISSN: 1562-3599
TÜRKOĞLU HARUN, POLAT TATAR GÜL, AKIN FIRAT DOĞU
|
Process Observation in Building Construction Methods Education A Case Study
2nd International Conference on Design Education, Sidney/AVUSTRALYA, 28 Haziran 2010
ALTUN MEHMET CEM,YAZICIOĞLU FATİH
|
Detailed Design Readings from Architectural Construction Drawings
1st International Graduate Research Symposium on the Built Environment, Ankara/TÜRKİYE, 15 Ekim 2010, s. 307-312
YAZICIOĞLU FATİH,ALTUN MEHMET CEM
|