ARAMA SONUÇLARI

Toplam 925 adet sonuçtan 20 tanesi görüntülenmektedir.

Arama









Yıllara göre arama

Özel Aralık Girişi

BIM EXECUTION PROCESS OF CONSTRUCTION COMPANIES FOR BUILDING PROJECTS
Ninth International Structural Engineering and Construction Conference, Valensiya/İSPANYA, 24 Temmuz 2017
GERÇEK BİLGE,TOKDEMİR ONUR BEHZAT,İLAL MUSTAFA EMRE,GÜNAYDIN HÜSNÜ MURAT
Onur Behzat Tokdemir Tam metin bildiri
ALISS: Advanced Linear Scheduling System
Construction Management and Economics, Vol. 24, No. 12, Ekim 2006, s. 1253-1267, ISSN: 0144-6193
TOKDEMİR ONUR BEHZAT,ARDİTİ DAVİD,BALCİK CENK
Exploring the Adaptability of Daily Look-Ahead Meetings in the Construction Industry
6th International Project and Construction Management Conference (e-IPCMC2020), İstanbul/TÜRKİYE, 12 Kasım 2020, s. 1318-1325
YILMAZ ANIL,TOKDEMİR ONUR BEHZAT
Onur Behzat Tokdemir Tam metin bildiri
Predicting the Outcome of Construction Litigation Using Neural Networks
Computer-Aided Civil and Infrastructure Engineering, Vol. 13, No. 2, Mart 1998, s. 75-81, ISSN: 1093-9687
ARDİTİ DAVİD,OKSAY FATİH E,TOKDEMİR ONUR BEHZAT
Using Case-Based Reasoning to Predict the Outcome of Construction Litigation
Computer-Aided Civil and Infrastructure Engineering, Vol. 14, No. 6, Kasım 1999, s. 385-393, ISSN: 1093-9687
DAVİD ARDİTİ,TOKDEMİR ONUR BEHZAT
Risk Management of Construction Projects by Implementation of Lean Construction and Building Information Modelling
IES’20 International Engineering Symposium | Engineering Applications in Industry (Virtual), İzmir/TÜRKİYE, 5 Aralık 2020
COŞKUN CANSU, TOKDEMİR ONUR BEHZAT
Onur Behzat Tokdemir Tam metin bildiri
Challenges in Line-of-Balance Scheduling
Journal of Construction Engineering and Management, Vol. 128, No. 6, Aralık 2002, s. 545-556, ISSN: 0733-9364
ARDİTİ DAVİD,TOKDEMİR ONUR BEHZAT,SUH KANGSUK
Research Development of Lean Construction Journal: A Bibliometric Analysis
Lean Construction Journal, No. 2019, Ekim 2019, s. 47-63, ISSN: 1555-1369
SAYGILI MURATHAN,ERDEKLİ YUSUF KEMAL,TOKDEMİR ONUR BEHZAT
Onur Behzat Tokdemir Özgün Makale
Delay Risk Assessment of Repetitive Construction Projects Using Line-of-Balance Scheduling and Monte Carlo Simulation
Journal of Construction Engineering and Management, Vol. 145, No. 2, Şubat 2019, ISSN: 0733-9364
TOKDEMİR ONUR BEHZAT, EROL HÜSEYİN, DİKMEN TOKER İREM
Onur Behzat Tokdemir Özgün Makale
Accident Analysis for Construction Safety Using Latent Class Clustering and Artificial Neural Networks
Journal of Construction Engineering and Management, Vol. 146, No. 3, Mart 2020, ISSN: 0733-9364
AYHAN BİLAL UMUT,TOKDEMİR ONUR BEHZAT
Onur Behzat Tokdemir Özgün Makale
A decentralized structure to reduce and resolve construction disputes in a hybrid blockchain network
Automation in Construction, Vol. 134, Şubat 2022, ISSN: 0926-5805
SAYGILI MURATHAN, MERT İSA EMRE, TOKDEMİR ONUR BEHZAT
Onur Behzat Tokdemir Özgün Makale
Sustainable Construction in Turkish Higher Education Context
Journal of Construction Engineering, Management and Innovation, Vol. 2, No. 1, Mart 2019, s. 40-47, ISSN: 2630-5771
TOPAK FATİH,TOKDEMİR ONUR BEHZAT,PEKERİÇLİ MEHMET KORAY,TANYER ALİ MURAT
Potential benefits of agile project management in improving construction project performances: A case study of Iraq
Journal of Construction Engineering, Management & Innovation (Online), Vol. 5, No. 2, Ocak 2022, s. 64-76, ISSN: 2630-5771
KAZAR GÖKHAN, ALMHAMDAWEE AHMED, TOKDEMİR ONUR BEHZAT
Onur Behzat Tokdemir Özgün Makale
Introducing Sustainable And Innovative Materials To Construction Industry: Lessons Learned From A Research Project
6th International Project and Construction Management Conference - eIPCMC 2020, 12 Kasım 2020
İLTER AKIN TOLGA, YONAR FATİH
Akın Tolga İlter Tam metin bildiri
Analysis of workday losses due to falls from scaffoldings in the construction industry
Journal of Construction Engineering, Management & Innovation (Online), Vol. 5, No. 1, Ocak 2022, s. 15-27, ISSN: 2630-5771
TÖZER KEMAL DİRGEN, GÜRCANLI GÜRKAN EMRE, YARKINER ZALİHE
Gürkan Emre Gürcanlı Özgün Makale
Use Of The Design Structure Matrix During The Construction Phase Of Building Production Process In Turkey
6th International Project and Construction Management e-Conference (e-IPCMC-2020), istanbul/TÜRKİYE, Vol. 1, No. 1, 12 Kasım 2020, s. 248-256
BUĞAN JİBİD,TAŞ ELÇİN FİLİZ
Elçin Filiz Taş Tam metin bildiri
Evaluating Innovation Performance of Countries in the Construction Industry by Using Patent Data
th International Conference on Construction in the 21st Century (CITC), 20 Mayıs 2009
ERGEN E, BASPİNAR C
Esin Ergen Pehlevan Tam metin bildiri
Research trends analysis using text mining in construction management: 2000–2020
Engineering, Construction and Architectural Management, Vol. 29, No. 8, Ağustos 2022, s. 3210-3232, ISSN: 0969-9988
BİLGE EYMEN ÇAĞATAY, YAMAN HAKAN
Hakan Yaman Özgün Makale
Performance Forecasting Methods in Construction Industry Deterministic Approach,
6th International Project and Construction Management e-Conference (e-IPCMC-2020), İstanbul/TÜRKİYE, Vol. 1, No. 1, 12 Kasım 2020, s. 151-161
YAYLALI RÜÇHAN,TAŞ ELÇİN FİLİZ
Elçin Filiz Taş Tam metin bildiri
Classification Of Construction Waste According To Lean Management Approach
6th International Project and Construction Management e-Conference (e-IPCMC-2020), İstanbul/TÜRKİYE, Vol. 1, No. 1, 12 Kasım 2020, s. 143-150
CAN GİZEM,TAŞ ELÇİN FİLİZ
Elçin Filiz Taş Tam metin bildiri

İLETİŞİM BİLGİLERİ

İstanbul Teknik Üniversitesi Rektörlüğü İTÜ Ayazağa Kampüsü Rektörlük Binası, Maslak-Sarıyer / İstanbul Tel: +90 212 285 3930