ARAMA SONUÇLARI

Toplam 15 adet sonuçtan 15 tanesi görüntülenmektedir.

Arama









Yıllara göre arama

Özel Aralık Girişi

Effect of learning on line-of-balance scheduling
International Journal of Project Management, Vol. 19, No. 5, Temmuz 2001, s. 265-277, ISSN: 02637863
ARDİTİ DAVİD,TOKDEMİR ONUR BEHZAT,SUH KANGSUK
Scheduling system for repetitive unit construction using line‐of‐balance technology
Engineering, Construction and Architectural Management, Vol. 8, No. 2, Şubat 2001, s. 90-103, ISSN: 0969-9988
ARDITI DAVID,TOKDEMİR ONUR BEHZAT,SUH KANGSUK
VALUE STREAM MAPPING AND RESOURCE OPTIMIZATION FOR A HIGH-RISE BUILDING USING LINE OF BALANCE
Fen Bilimleri Enstitüsü, Orta Doğu Teknik Üniversitesi, 2019
LEART GORANA
Onur Behzat Tokdemir Tez Yüksek Lisans Devam Ediyor
Scheduling system for high rise building construction
Construction Management and Economics, Vol. 20, No. 4, Haziran 2002, s. 353-364, ISSN: 0144-6193
ARDİTİ DAVİD,SİKANGWAN PİRASAK,TOKDEMİR ONUR BEHZAT
Delay Risk Assessment of Repetitive Construction Projects Using Line-of-Balance Scheduling and Monte Carlo Simulation
Journal of Construction Engineering and Management, Vol. 145, No. 2, Şubat 2019, ISSN: 0733-9364
TOKDEMİR ONUR BEHZAT, EROL HÜSEYİN, DİKMEN TOKER İREM
Onur Behzat Tokdemir Özgün Makale
Impacts of different objective functions on resource leveling in Line of Balance scheduling
KSCE Journal of Civil Engineering, Vol. 20, No. 1, Ocak 2016, s. 58-67, ISSN: 1226-7988
DAMCI ATİLLA,ARDITI DAVID,POLAT TATAR GÜL
Atilla Damcı Özgün Makale
Revisiting the concept of natural rhythm of production in line of balance scheduling
International Journal of Construction Management, Vol. 22, No. 12, Temmuz 2022, s. 2335-2344, ISSN: 1562-3599","2331-2327
DAMCI ATİLLA
Atilla Damcı Özgün Makale
Resource Leveling in Line of Balance Scheduling
Computer-Aided Civil and Infrastructure Engineering, Vol. 28, No. 9, Ekim 2013, s. 679-692, ISSN: 10939687
DAMCI ATİLLA,ARDITI DAVID,POLAT TATAR GÜL
Atilla Damcı Özgün Makale
Scheduling Asphalt Highway Construction Operations Using the Combination of Line of Balance and Discrete Event Simulation Techniques
Industrial Engineering and Engineering Management Conference, 8 Aralık 2009
POLAT TATAR GÜL,BÜYÜKSARAÇOĞLU YALÇIN,DAMCI ATİLLA
Atilla Damcı Tam metin bildiri
Multiresource Leveling in Line of Balance Scheduling
Journal of Construction Engineering and Management, Vol. 139, No. 9, Eylül 2013, s. 1108-1116, ISSN: 0733-9364
DAMCI ATİLLA,ARDITI DAVID,POLAT TATAR GÜL
Atilla Damcı Özgün Makale
Challenges in Line-of-Balance Scheduling
Journal of Construction Engineering and Management, Vol. 128, No. 6, Aralık 2002, s. 545-556, ISSN: 0733-9364
ARDİTİ DAVİD,TOKDEMİR ONUR BEHZAT,SUH KANGSUK
ALISS: Advanced Linear Scheduling System
Construction Management and Economics, Vol. 24, No. 12, Ekim 2006, s. 1253-1267, ISSN: 0144-6193
TOKDEMİR ONUR BEHZAT,ARDİTİ DAVİD,BALCİK CENK
Impacts of different objective functions on resource leveling in Line of Balance scheduling
KSCE Journal of Civil Engineering, Vol. 20, No. 1, Ocak 2016, s. 58-67, ISSN: 1226-7988
DAMCI ATİLLA,ARDİTİ DAVİD,POLAT TATAR GÜL
Gül Polat Tatar Özgün Makale
Resource Leveling in Line of Balance Scheduling
Computer-Aided Civil and Infrastructure Engineering, Vol. 28, No. 9, Ekim 2013, s. 679-692, ISSN: 10939687
DAMCI ATİLLA,ARDİTİ DAVİD,POLAT TATAR GÜL
Gül Polat Tatar Özgün Makale
Scheduling Asphalt Highway Construction Operations Using the Combination of Line of Balance and Discrete Event Simulation Techniques
IEEM International Conference on Industrial Engineering and Engineering Management (IEEM09), 8 Aralık 2009
POLAT TATAR GÜL,BUYUKSARACOGLU YALCİN,DAMCI ATİLLA
Gül Polat Tatar Tam metin bildiri

İLETİŞİM BİLGİLERİ

İstanbul Teknik Üniversitesi Rektörlüğü İTÜ Ayazağa Kampüsü Rektörlük Binası, Maslak-Sarıyer / İstanbul Tel: +90 212 285 3930