The New Severity Scale of Occupational Accidents for Construction Projects
5th International Project and Construction Management Conference (IPCMC 2018), 16 Kasım 2018
BİLİR MAHÇİÇEK SENEM,GÜRCANLI GÜRKAN EMRE
|
An in-depth investigation of digital construction technologies from a building economics perspective
Construction Economics and Building, Vol. 24, No. 3, Haziran 2024, s. 40-75, ISSN: 2204-9029
ÇAKMAK FATMA PINAR,AKTÜRK BERKAY
|
Heavy Equipment Scheduling For Horizontal Construction Projects
7th International Conference on Engineering, Project, and Production Management, 21 Ekim 2016
GÜRCANLI GÜRKAN EMRE,TÜRKOĞLU HARUN,BİLİR MAHÇİÇEK SENEM
|
AN APPROACH FOR SAFETY COST ESTIMA TION OF BUILDING CONSTRUCTION
The Eighth International Structural Engineering and Construction Conference, Sidney/AVUSTRALYA, 23 Kasım 2015, s. 869-874
BİLİR MAHÇİÇEK SENEM,GÜRCANLI GÜRKAN EMRE
|
TECHNOLOGICAL ASSESSMENT AND PROCESS IMPLICATIONS OF FIELD DATA CAPTURE TECHNOLOGIES FOR CONSTRUCTION AND FACILITY/INFRASTRUCTURE MANAGEMENT
JOURNAL OF INFORMATION TECHNOLOGY IN CONSTRUCTION, Vol. 13, Ocak 2008, s. 134-154, ISSN: 1874-4753
KİZİLTAS SEMİHA,AKİNCİ BURCU,ERGEN PEHLEVAN ESİN,TANG PİNGBO,GORDON CHRİS
|
The Evaluation Of Turkish Contractors’xx Views After Mandatory Mediation In Turkish Construction Sector
6th International Project and Construction Management e-Conference (e-IPCMC-2020), İstanbul/TÜRKİYE, Vol. 1, No. 1, 12 Kasım 2020, s. 401-409
ARICI ÜSTÜNER YAPRAK,TAŞ ELÇİN FİLİZ
|
Risk Management of Construction Projects by Implementation of Lean Construction and Building Information Modelling
IES’20 International Engineering Symposium | Engineering Applications in Industry (Virtual), İzmir/TÜRKİYE, 5 Aralık 2020
COŞKUN CANSU, TOKDEMİR ONUR BEHZAT
|
Construction Sector Dynamics in Turkey: Economic Advancements and Vulnerabilities
JOURNAL OF CONSTRUCTION IN DEVELOPING COUNTRIES, Vol. 29, No. 1, Ocak 2024, s. 25-291, ISSN: 1823-6499
BÜYÜKYORAN FARUK, YAMAN HAKAN
|
Introducing Sustainable And Innovative Materials To Construction Industry: Lessons Learned From A Research Project
6th International Project and Construction Management Conference - eIPCMC 2020, 12 Kasım 2020
İLTER AKIN TOLGA, YONAR FATİH
|
ALISS: Advanced Linear Scheduling System
Construction Management and Economics, Vol. 24, No. 12, Ekim 2006, s. 1253-1267, ISSN: 0144-6193
TOKDEMİR ONUR BEHZAT,ARDİTİ DAVİD,BALCİK CENK
|
Integrated Project Delivery (IPD) and Traditional Procurement Methods in Construction Industry-Towards a Team Based Approach
6th International Project and Construction Management Conference (e-IPCMC2020), 12 Kasım 2020, s. 1040-1050
ÜSTÜN PELİN,GÜRCANLI GÜRKAN EMRE
|
Research Development of Lean Construction Journal: A Bibliometric Analysis
Lean Construction Journal, No. 2019, Ekim 2019, s. 47-63, ISSN: 1555-1369
SAYGILI MURATHAN,ERDEKLİ YUSUF KEMAL,TOKDEMİR ONUR BEHZAT
|
Electronic Procurement Systems and Building Information Modeling Integration in Construction Sector: A Case Study
5th International Project and Construction Management Conference (IPCMC 2018), Girne/KUZEY KIBRIS TÜRK CUMHURİYETİ, Vol. 1, No. 1, 16 Kasım 2018, s. 290-297
SARAÇ ÇIRACIOĞLU AYŞEN,YAMAN HAKAN
|
Relative Importance of Productivity Factors in Construction Industry
6th International Project and Construction Management Conference, İstanbul/TÜRKİYE, 12 Kasım 2020, s. 645-650
BİLİR MAHÇİÇEK SENEM, GÜRCANLI GÜRKAN EMRE
|
Investigation of Productivity in the Construction Industry
6th International Project and Construction Management Conference (e-IPCMC2020), 12 Kasım 2020, s. 641-644
BİLİR MAHÇİÇEK SENEM,GÜRCANLI GÜRKAN EMRE
|
Comprehensive Root Cause Analysis of Construction Defects Using Semisupervised Graph Representation Learning
Journal of Construction Engineering and Management, Vol. 149, Eylül 2023, ISSN: 0733-9364
MOSTOFİ FATEMEH, TOKDEMİR ONUR BEHZAT, TOĞAN VEDAT
|
A Proposed Model for Estimation of Ideal Construction Duration in Housing Projects
IPCMC 2022 - 7th International Project and Construction Management Conference, İSTANBUL/TÜRKİYE, Vol. 1, No. 1, 20 Ekim 2022, s. 216-231
TIRATACI HAKAN, YAMAN HAKAN
|
Crashing construction projects considering schedule flexibility: an illustrative example
International Journal of Construction Management, Vol. 23, No. 4, Nisan 2023, s. 619-628, ISSN: 1562-3599
TÜRKOĞLU HARUN, POLAT TATAR GÜL, AKIN FIRAT DOĞU
|
Estimation of ideal construction duration in tender preparation stage for housing projects
Organization, Technology and Management in Construction: an International Journal, Vol. 15, No. 1, Ocak 2023, s. 192-212, ISSN: 1847-6228
TIRATACI HAKAN, YAMAN HAKAN
|
The effect of artificial neural networks on cost estimation in construction projects: A literature review
8th International Project and Construction Management Conference, 6 Haziran 2024
ŞERBETÇİOĞLU BOĞAÇHAN,ÇAKMAK FATMA PINAR
|