Turkish Architectural and Civil Engineering Education within the Scope of Sustainable Construction
5. International Project Construction Management Conference, Girne/KUZEY KIBRIS TÜRK CUMHURİYETİ, 16 Kasım 2018, s. 200-208
TOPAK FATİH,TOKDEMİR ONUR BEHZAT,PEKERİÇLİ MEHMET KORAY,TANYER ALİ MURAT
|
Organizational culture the case of Turkish construction industry
Engineering, Construction and Architectural Management, Vol. 14, No. 6, Kasım 2007, s. 519-531, ISSN: 0969-9988
YAZICI ÖNEY ELA,GİRİTLİ FATMA HEYECAN,ORAZ TOPÇU GÜLFER,ACAR EMRAH
|
Mathematical Multiobjective Optimization Model for Trade-Offs in Small-Scale Construction Projects
Journal of Construction Engineering and Management, Vol. 149, No. 7, Temmuz 2023, s. 1-12, ISSN: 0733-9364
TÜRKOĞLU HARUN, ARDİTİ DAVİD, POLAT TATAR GÜL
|
Developing Property Set s in the IFC Standard For Sustainable Construction
CC2013 – Proceedings of the Creative Construction Conference 2013, BUDAPEŞTE/MACARİSTAN, 6 Temmuz 2013, s. 359-367
İLHAN BAHRİYE,YAMAN HAKAN
|
Sustainable Construction in Turkish Higher Education Context
Journal of Construction Engineering, Management and Innovation, Vol. 2, No. 1, Mart 2019, s. 40-47, ISSN: 2630-5771
TOPAK FATİH,TOKDEMİR ONUR BEHZAT,PEKERİÇLİ MEHMET KORAY,TANYER ALİ MURAT
|
How to Train Your AI for Construction Project Management Research
8th International Project and Construction Management Conference (IPCMC2024), 6 Haziran 2024, s. 160-171
İLTER AKIN TOLGA
|
Accident prediction in construction using hybrid wavelet-machine learning
Automation in Construction, Vol. 133, Ocak 2022, s. 103987-103987, ISSN: 0926-5805
KOÇ KERİM, EKMEKCİOĞLU ÖMER, GÜRGÜN ASLI PELİN
|
A decentralized structure to reduce and resolve construction disputes in a hybrid blockchain network
Automation in Construction, Vol. 134, Şubat 2022, ISSN: 0926-5805
SAYGILI MURATHAN, MERT İSA EMRE, TOKDEMİR ONUR BEHZAT
|
Blockchain and smart contracts for payment and contract management in construction: A systematic review
6th Construction Blockchain Conference 2024: AI & Data Lifecycle, Londra/İNGİLTERE, 2 Kasım 2024
RAJABBASHA HANAN,ÇAKMAK FATMA PINAR
|
A rule-based methodology for automated progress monitoring of construction activities: A case for masonry work
Journal of Information Technology in Construction, Vol. 24, No. null, Mayıs 2019, s. 188-208, ISSN: 18744753
GÜVEN IŞIN GÜRŞANS,ERGEN PEHLEVAN ESİN
|
Utilizing Analytical Hierarchy Process for Contractor Selection in Turkish Public Construction Procurements
CITC-9 The Ninth International Conference on Construction in the 21st Century,, Dubai/BİRLEŞİK ARAP EMİRLİKLERİ, 5 Mart 2017
ÇAKMAK FATMA PINAR,ÇAKMAK EMRE
|
Research trends analysis using text mining in construction management: 2000–2020
Engineering, Construction and Architectural Management, Vol. 29, No. 8, Ağustos 2022, s. 3210-3232, ISSN: 0969-9988
BİLGE EYMEN ÇAĞATAY, YAMAN HAKAN
|
Challenges in Line-of-Balance Scheduling
Journal of Construction Engineering and Management, Vol. 128, No. 6, Aralık 2002, s. 545-556, ISSN: 0733-9364
ARDİTİ DAVİD,TOKDEMİR ONUR BEHZAT,SUH KANGSUK
|
Analyzing the benefits of RFID technology for cost sharing in construction supply chains A case study on prefabricated precast components
Automation in Construction, Vol. 24, Temmuz 2012, s. 120-129, ISSN: 09265805
DEMİRALP G,GÜVEN GÜRŞANS,ERGEN ESİN
|
Total Construction Duration Calculation of TOKI Housing Projects: A Case Study
IPCMC 2022 - 7th International Project and Construction Management Conference, İSTANBUL/TÜRKİYE, 20 Ekim 2022, s. 204-215
TIRATACI HAKAN, YAMAN HAKAN
|
Potential benefits of agile project management in improving construction project performances: A case study of Iraq
Journal of Construction Engineering, Management & Innovation (Online), Vol. 5, No. 2, Ocak 2022, s. 64-76, ISSN: 2630-5771
KAZAR GÖKHAN, ALMHAMDAWEE AHMED, TOKDEMİR ONUR BEHZAT
|
Overview of Financed-Based Scheduling in Construction Management Research
7 th International Project and Construction Management Conference (IPCMC 2022), istanbul/TÜRKİYE, 20 Ekim 2022
AKIN FIRAT DOĞU, DAMCI ATİLLA, ARDİTİ DAVİD, DEMİRKESEN ÇAKIR SEVİLAY
|
Exploring the Adaptability of Daily Look-Ahead Meetings in the Construction Industry
6th International Project and Construction Management Conference (e-IPCMC2020), İstanbul/TÜRKİYE, 12 Kasım 2020, s. 1318-1325
YILMAZ ANIL,TOKDEMİR ONUR BEHZAT
|
Total Construction Duration Calculation of Public Housing Projects in Turkey: A Case Study
Golden Light Publishing - Journal of Construction Engineering, Management & Innovation, Vol. 6, No. 1, Mart 2023, s. 16-29, ISSN: 2630-5771
TIRATACI HAKAN, YAMAN HAKAN
|
Developing a National Data-Driven Construction Safety Management Framework with Interpretable Fatal Accident Prediction
Journal of Construction Engineering and Management, Vol. 149, No. 4, Nisan 2023, ISSN: 0733-9364
KOÇ KERİM, EKMEKCİOĞLU ÖMER, GÜRGÜN ASLI PELİN
|