The Financial Effect of the Electricity Price Forecasts’ Inaccuracy on a Hydro-Based Generation Company
ENERGIES, Vol. 11, No. 8, Ağustos 2018, ISSN: 1996-1073
UĞURLU UMUT,KAYA AYCAN,TAŞ OKTAY,ÖKSÜZ İLKAY
|
Batching and delivery in semi-online distribution systems
DISCRETE APPLIED MATHEMATICS, Vol. 161, Mayıs 2013, s. 28-42, ISSN: 0166-218X
AVERBAKH IGOR,BAYSAN MEHMET
|
THE EFFECTS OF UNFORESEEN CHANGES IN AGGREGATED LOAD SCHEDULING ON TRANSMISSION SYSTEM OPERATION
16th International Conference on Clean Energy (ICCE-2018), Famagusta/KUZEY KIBRIS TÜRK CUMHURİYETİ, 9 Mayıs 2018
BAĞRIYANIK FATMA GÜL,BAĞRIYANIK MUSTAFA,DAĞ HASAN
|
Heavy Equipment Scheduling For Horizontal Construction Projects
7th International Conference on Engineering, Project, and Production Management, 21 Ekim 2016
GÜRCANLI GÜRKAN EMRE,TÜRKOĞLU HARUN,BİLİR MAHÇİÇEK SENEM
|
Scheduling Asphalt Highway Construction Operations Using the Combination of Line of Balance and Discrete Event Simulation Techniques
IEEM International Conference on Industrial Engineering and Engineering Management (IEEM09), 8 Aralık 2009
POLAT TATAR GÜL,BUYUKSARACOGLU YALCİN,DAMCI ATİLLA
|
Application of a Fast Evolutionary Algorithm to Short term Hydro thermal Generation Scheduling
Energy Sources, Part B: Economics, Planning, and Policy, Vol. 6, No. 4, Ağustos 2011, s. 395-405, ISSN: 1556-7249
TÜRKAY BELGİN,FATİH MECİTOĞLU,SAİM BARAN
|
A novel differential evolution application to short term electrical power generation scheduling
International Journal of Electrical Power & Energy Systems, Vol. 33, No. 6, Temmuz 2011, s. 1236-1242, ISSN: 01420615
KELES ALİ,UYAR AYŞE ŞİMA,TÜRKAY BELGİN
|
Delay Scheduling A New Concept for Stabilization in Multiple Delay Systems
Journal of Vibration and Control, Vol. 11, No. 9, Eylül 2005, s. 1159-1172, ISSN: 1077-5463
NEJAT OLGAC,ERGENÇ ALİ FUAT,RİFAT SİPAHİ
|
On modeling of priority-based SIP request scheduling
SIMULATION MODELLING PRACTICE AND THEORY, Vol. 80, Ocak 2018, s. 128-144, ISSN: 1569-190X
YAVAŞ DEMİR YAŞA,HÖKELEK İBRAHİM,GÜNSEL KALYONCU BİLGE
|
On fluid-flow modeling of priority based request scheduling for finite buffer SIP server
International Journal of Communication Systems, Vol. 30, No. 17, Kasım 2017, s. 3357, ISSN: 10745351
YAVAŞ DEMİR YAŞA,HÖKELEK İBRAHİM,GÜNSEL KALYONCU BİLGE
|
Delay scheduling an unconventional use of time delay for trajectory tracking
Mechatronics, Vol. 17, No. 4-5, Mayıs 2007, s. 199-206, ISSN: 09574158
RİFAT SİPAHİ,NEJAT OLGAC,ERGENÇ ALİ FUAT
|
Health and Safety Documentation System Establishment inConstruction Projects through Planning and Scheduling, 5th International Project and Construction Management Conference
5th International Project and Construction Management Conference (IPCMC 2018), 16 Kasım 2018
SEVİM MERVE,GÜRCANLI GÜRKAN EMRE
|
Heavy Equipment Scheduling for Horizontal Construction Projects
7th International Conference on Engineering, Project, and Production Management, No. 182, 21 Eylül 2016, s. 265-273
GÜRCANLI GÜRKAN EMRE,TÜRKOĞLU HARUN,BİLİR MAHÇİÇEK SENEM
|
Cooperation in Space: HAPS-Aided Optical Inter-Satellite Connectivity With Opportunistic Scheduling
IEEE Communications Letters, Vol. 26, No. 4, Ocak 2022, s. 882-886, ISSN: 1089-7798
ERDOĞAN EYLEM, ALTUNBAŞ İBRAHİM, KARABULUT KURT GÜNEŞ ZEYNEP, YANIKÖMEROĞLU HALİM
|
Optimal sizing of PV-BESS units for home energy management system-equipped households considering day-ahead load scheduling for demand response and self-consumption
Energy and Buildings, Vol. 267, Ocak 2022, ISSN: 0378-7788
DUMAN ANIL CAN, ERDEN HAMZA SALİH, GÖNÜL ÖMER, GÜLER ÖNDER
|
Delay Risk Assessment of Repetitive Construction Projects Using Line-of-Balance Scheduling and Monte Carlo Simulation
Journal of Construction Engineering and Management, Vol. 145, No. 2, Şubat 2019, ISSN: 0733-9364
TOKDEMİR ONUR BEHZAT, EROL HÜSEYİN, DİKMEN TOKER İREM
|
ALISS: Advanced Linear Scheduling System
Construction Management and Economics, Vol. 24, No. 12, Ekim 2006, s. 1253-1267, ISSN: 0144-6193
TOKDEMİR ONUR BEHZAT,ARDİTİ DAVİD,BALCİK CENK
|
Optimal sizing of PV-BESS units for home energy management system-equipped households considering day-ahead load scheduling for demand response and self-consumption
Energy and Buildings, Vol. 267, Ocak 2022, ISSN: 0378-7788
DUMAN ANIL CAN, ERDEN HAMZA SALİH, GÖNÜL ÖMER, GÜLER ÖNDER
|
A risk-averse simulation-based approach for a joint optimization of workforce capacity, spare part stocks and scheduling priorities in maintenance planning
RELIABILITY ENGINEERING & SYSTEM SAFETY, Vol. 204, Aralık 2020, ISSN: 0951-8320
TURAN HASAN HÜSEYİN,ATMIŞ MAHİR,KOSANOĞLU FUAT,ALSAWAH SONDOSS,RYAN MİCHAEL J
|
Automated Vehicle Scheduling System: A Case Study of Metrobus System
Sigma Journal of Engineering and Natural Sciences, Vol. 7, No. 1, Ocak 2016, s. 1-7, ISSN: 1304-7205
SEVİM İSMAİL, TEKİNER MOĞULKOÇ HATİCE, GÜLER MEHMET GÜRAY, MUTLU ZEYNEP PINAR
|