ALISS: Advanced Linear Scheduling System
Construction Management and Economics, Vol. 24, No. 12, Ekim 2006, s. 1253-1267, ISSN: 0144-6193
TOKDEMİR ONUR BEHZAT,ARDİTİ DAVİD,BALCİK CENK
|
Predicting the Cost of Rework in High-Rise Buildings Using Graph Convolutional Networks
Journal of Construction Engineering and Management, Vol. 150, No. 8, Ağustos 2024, ISSN: 0733-9364
MOSTOFİ FATEMEH,TOKDEMİR ONUR BEHZAT,TOĞAN VEDAT,ARDİTİ DAVİD
|
Scientific research trends of occupational health and safety in construction management over the past two decades
5th International Conference on Engineering Sciences (ICES 2019), Ankara/TÜRKİYE, 19 Eylül 2019, s. 59-59
ERDEKLİ YUSUF KEMAL,SAYGILI MURATHAN,TOKDEMİR ONUR BEHZAT
|
Impacts of different objective functions on resource leveling in construction projects a case study
Journal of Civil Engineering and Management, Vol. 20, No. 4, Temmuz 2014, s. 537-547, ISSN: 1392-3730
DAMCI ATİLLA,POLAT TATAR GÜL
|
Crashing construction projects considering schedule flexibility: an illustrative example
International Journal of Construction Management, Vol. 23, No. 4, Nisan 2023, s. 619-628, ISSN: 1562-3599
TÜRKOĞLU HARUN, POLAT TATAR GÜL, AKIN FIRAT DOĞU
|
A BIBLIOMETRIC REVIEW OF GLOBAL SCIENTIFIC RESEARCH TRENDS ON ARTIFICIAL INTELLIGENCE AND CONSTRUCTION MANAGEMENT FROM 1988 TO 2018
6th INTERNATIONAL CONFERENCE ON ENGINEERING NATURAL SCIENCES, URFA/TÜRKİYE, 24 Ocak 2020, s. 135-142
KULOĞLU ALİ FATİH,SAYGILI MURATHAN,TOKDEMİR ONUR BEHZAT
|
Comprehensive Root Cause Analysis of Construction Defects Using Semisupervised Graph Representation Learning
Journal of Construction Engineering and Management, Vol. 149, Eylül 2023, ISSN: 0733-9364
MOSTOFİ FATEMEH, TOKDEMİR ONUR BEHZAT, TOĞAN VEDAT
|
Scheduling system for repetitive unit construction using line‐of‐balance technology
Engineering, Construction and Architectural Management, Vol. 8, No. 2, Şubat 2001, s. 90-103, ISSN: 0969-9988
ARDITI DAVID,TOKDEMİR ONUR BEHZAT,SUH KANGSUK
|
Development of zero-based budgeting approach for multinational construction contractors
Engineering, Construction and Architectural Management, Vol. 30, No. 10, Ağustos 2023, s. 5217-5232, ISSN: 0969-9988
KAZAR GÖKHAN, MUTLU UĞUR, TOKDEMİR ONUR BEHZAT
|
Delay Risk Assessment of Repetitive Construction Projects Using Line-of-Balance Scheduling and Monte Carlo Simulation
Journal of Construction Engineering and Management, Vol. 145, No. 2, Şubat 2019, ISSN: 0733-9364
TOKDEMİR ONUR BEHZAT, EROL HÜSEYİN, DİKMEN TOKER İREM
|
Value Creation in PPP Projects Undertaken in the Turkish Healthcare Industry
Journal of Construction Engineering and Management, Vol. 149, Kasım 2023, ISSN: 0733-9364
ERK ERALP, BUDAYAN CENK, KOÇ KERİM, TOKDEMİR ONUR BEHZAT
|
Scheduling system for high rise building construction
Construction Management and Economics, Vol. 20, No. 4, Haziran 2002, s. 353-364, ISSN: 0144-6193
ARDİTİ DAVİD,SİKANGWAN PİRASAK,TOKDEMİR ONUR BEHZAT
|
A lean thinking perspective towards K12 classroom design in Turkey
Journal of Construction Engineering, Management Innovation, Vol. 3, No. 3, Eylül 2020, s. 232-248, ISSN: 2630-5771
TAŞKIN GÖKÇE NİHAN,TOKDEMİR ONUR BEHZAT
|
Quality Failures-Based Critical Cost Impact Factors: Logistic Regression Analysis
Journal of Construction Engineering and Management, Vol. 148, Aralık 2022, ISSN: 0733-9364
KAZAR GÖKHAN, DOĞAN NEŞET BERKAY, AYHAN BİLAL UMUT, TOKDEMİR ONUR BEHZAT
|
Risk Management of Construction Projects by Implementation of Lean Construction and Building Information Modelling
IES’20 International Engineering Symposium | Engineering Applications in Industry (Virtual), İzmir/TÜRKİYE, 5 Aralık 2020
COŞKUN CANSU, TOKDEMİR ONUR BEHZAT
|
Turkish Architectural and Civil Engineering Education within the Scope of Sustainable Construction
5. International Project Construction Management Conference, Girne/KUZEY KIBRIS TÜRK CUMHURİYETİ, 16 Kasım 2018, s. 200-208
TOPAK FATİH,TOKDEMİR ONUR BEHZAT,PEKERİÇLİ MEHMET KORAY,TANYER ALİ MURAT
|
A unified approach to evaluate green hospitals’ certification criteria
Journal of Construction Engineering, Management Innovation, Vol. 2, No. 3, Eylül 2019, s. 157-166, ISSN: 2630-5771
CANDAŞ ALİ BEDİİ,TOKDEMİR ONUR BEHZAT
|
Effect of organizational culture on delay in construction
International Journal of Project Management, Vol. 35, No. 2, Şubat 2017, s. 136-147, ISSN: 02637863
ARDITI DAVID,NAYAK SHRUTI,DAMCI ATİLLA
|
Construction Project Managers’ Motivators and Human Values
Journal of Construction Engineering and Management, Vol. 143, No. 4, Nisan 2017, s. 4016115, ISSN: 0733-9364
WANG DI,ARDITI DAVID,DAMCI ATİLLA
|
Generating synthetic data with variational autoencoder to address class imbalance of graph attention network prediction model for construction management
Advanced Engineering Informatics, Vol. 62, Ekim 2024, ISSN: 1474-0346
MOSTOFİ FATEMEH,TOKDEMİR ONUR BEHZAT,TOĞAN VEDAT
|