ARAMA SONUÇLARI

Toplam 967 adet sonuçtan 20 tanesi görüntülenmektedir.

Arama









Yıllara göre arama

Özel Aralık Girişi

Modeling and Analyzing the Impact of Technology on Data Capture and Transfer Processes at Construction Sites A Case Study
Journal of Construction Engineering and Management, Vol. 132, No. 11, Kasım 2006, s. 1148-1157, ISSN: 0733-9364
KİZİLTAS SEMİHA,AKİNCİ BURCU,ERGEN ESİN,KARAESMEN ITİR Z,KECELİ FUAT
Esin Ergen Pehlevan Özgün Makale
A rule-based methodology for automated progress monitoring of construction activities: A case for masonry work
Journal of Information Technology in Construction, Vol. 24, No. null, Mayıs 2019, s. 188-208, ISSN: 18744753
GÜVEN IŞIN GÜRŞANS,ERGEN PEHLEVAN ESİN
Esin Ergen Pehlevan Özgün Makale null
Analyzing the benefits of RFID technology for cost sharing in construction supply chains A case study on prefabricated precast components
Automation in Construction, Vol. 24, Temmuz 2012, s. 120-129, ISSN: 09265805
DEMİRALP G,GÜVEN GÜRŞANS,ERGEN ESİN
Esin Ergen Pehlevan Özgün Makale
Tracking major resources for automated progress monitoring of construction activities: masonry work case
Construction Innovation, Vol. 21, No. 4, Ekim 2021, s. 648-667, ISSN: 1471-4175
GÜVEN IŞIN GÜRŞANS, ERGEN PEHLEVAN ESİN
Esin Ergen Pehlevan Özgün Makale
Sensing and Field Data Capture for Construction and Facility Operations
Journal of Construction Engineering and Management, Vol. 137, No. 10, Ekim 2011, s. 870-881, ISSN: 0733-9364
TANEJA SAURABH,AKİNCİ BURCU,GARRETT JAMES H,SOİBELMAN LUCİO,ERGEN ESİN,PRADHAN ANU,TANG PİNGBO,BERGES MARİO,ATASOY GUZİDE,LİU XUESONG,SHAHANDASHTİ SEYED MOHSEN,ANİL ENGİN BURAK
Esin Ergen Pehlevan Özgün Makale
Construction informatics in Turkey strategic role of ICT and future research directions
Journal of Information Technology in Construction, Vol. 14, No. 1, Ağustos 2009, s. 412-428, ISSN: 14036835
UTKU AÇIKALIN, KURUOĞLU MURAT, IŞIKDAĞ ÜMİT, JASON UNDERWOOD, JACK GOULDİNG
Murat Kuruoğlu Özgün Makale
Identification of root causes of construction and demolition (C D) waste: the case of Turkey
Creative Construction Conference 2017, 19 Haziran 2017
POLAT TATAR GÜL,DAMCI ATİLLA,TÜRKOĞLU HARUN,GÜRGÜN ASLI PELİN
Harun Türkoğlu Tam metin bildiri
Mathematical Multiobjective Optimization Model for Trade-Offs in Small-Scale Construction Projects
Journal of Construction Engineering and Management, Vol. 149, No. 7, Temmuz 2023, s. 1-12, ISSN: 0733-9364
TÜRKOĞLU HARUN, ARDİTİ DAVİD, POLAT TATAR GÜL
Harun Türkoğlu Özgün Makale
Crashing construction projects considering schedule flexibility: an illustrative example
International Journal of Construction Management, Vol. 23, No. 4, Nisan 2023, s. 619-628, ISSN: 1562-3599
TÜRKOĞLU HARUN, POLAT TATAR GÜL, AKIN FIRAT DOĞU
Harun Türkoğlu Özgün Makale
An integrative literature review on the causes of delays in construction projects: evidence from developing countries
International Journal of Construction Management, Vol. 24, No. 6, Haziran 2024, s. 610-622, ISSN: 1562-3599
SELCUK ONUR, TÜRKOĞLU HARUN, POLAT TATAR GÜL, HAJDU MİKLOS
Harun Türkoğlu Özgün Makale
Introducing Sustainable And Innovative Materials To Construction Industry: Lessons Learned From A Research Project
6th International Project and Construction Management Conference - eIPCMC 2020, 12 Kasım 2020
İLTER AKIN TOLGA, YONAR FATİH
Akın Tolga İlter Tam metin bildiri
Evaluation of Construction and Demolition Wastes in the Context of the Waste Framework Directive of the European Union Member States
7th International Project and Construction Management Conference (IPCMC2022), İstanbul/TÜRKİYE, 21 Ekim 2022
SÖNMEZ NURŞEN, MAÇKA KALFA SİBEL
Nurşen Sönmez Tam metin bildiri
Electronic Procurement Systems and Building Information Modeling Integration in Construction Sector: A Case Study
5th International Project and Construction Management Conference (IPCMC 2018), Girne/KUZEY KIBRIS TÜRK CUMHURİYETİ, Vol. 1, No. 1, 16 Kasım 2018, s. 290-297
SARAÇ ÇIRACIOĞLU AYŞEN,YAMAN HAKAN
Hakan Yaman Tam metin bildiri
A Proposed Model for Estimation of Ideal Construction Duration in Housing Projects
IPCMC 2022 - 7th International Project and Construction Management Conference, İSTANBUL/TÜRKİYE, Vol. 1, No. 1, 20 Ekim 2022, s. 216-231
TIRATACI HAKAN, YAMAN HAKAN
Hakan Yaman Tam metin bildiri
Research trends analysis using text mining in construction management: 2000–2020
Engineering, Construction and Architectural Management, Vol. 29, No. 8, Ağustos 2022, s. 3210-3232, ISSN: 0969-9988
BİLGE EYMEN ÇAĞATAY, YAMAN HAKAN
Hakan Yaman Özgün Makale
The Turkish Construction Sector from a Macroeconomic Perspective
IPCMC 2022 - 7th International Project and Construction Management Conference, İSTANBUL/TÜRKİYE, Vol. 1, No. 1, 20 Ekim 2022, s. 545-562
BÜYÜKYORAN FARUK, YAMAN HAKAN
Hakan Yaman Tam metin bildiri
Currency Risk Analysis on Construction Cash Flows
IPCMC 2022 - 7th International Project and Construction Management Conference, İSTANBUL/TÜRKİYE, Vol. 1, No. 1, 20 Ekim 2022, s. 1138-1144
TÜZ ÖZLEM, YAMAN HAKAN
Hakan Yaman Tam metin bildiri
A comparative input output analysis of the construction sector in Turkey and EU countries
Engineering, Construction and Architectural Management, Vol. 18, No. 3, Mayıs 2011, s. 248-265, ISSN: 0969-9988
İLHAN BAHRİYE,YAMAN HAKAN
Hakan Yaman Özgün Makale
Estimation of ideal construction duration in tender preparation stage for housing projects
Organization, Technology and Management in Construction: an International Journal, Vol. 15, No. 1, Ocak 2023, s. 192-212, ISSN: 1847-6228
TIRATACI HAKAN, YAMAN HAKAN
Hakan Yaman Özgün Makale
A building material evaluation and selection model for the Turkish construction sector
Engineering, Construction and Architectural Management, Vol. 15, No. 2, Mart 2008, s. 149-163, ISSN: 0969-9988
TAŞ ELÇİN FİLİZ,YAMAN HAKAN,TANAÇAN LEYLA
Hakan Yaman Özgün Makale

İLETİŞİM BİLGİLERİ

İstanbul Teknik Üniversitesi Rektörlüğü İTÜ Ayazağa Kampüsü Rektörlük Binası, Maslak-Sarıyer / İstanbul Tel: +90 212 285 3930