ARAMA SONUÇLARI

Toplam 26 adet sonuçtan 20 tanesi görüntülenmektedir.

Arama









Yıllara göre arama

Özel Aralık Girişi

Aircraft Scheduled Airframe Maintenance and Downtime Integrated Cost Model
ADVANCES IN OPERATIONS RESEARCH, Haziran 2016
SALTOĞLU REMZİ,HUMAİRA NAZMİA,İNALHAN GÖKHAN
Gökhan İnalhan Özgün Makale
Mathematical model proposal and cost optimization in the creation of an emission reduction roadmap for an industrial enterprise in Turkey
Enerji Enstitüsü, İstanbul Teknik Üniversitesi, 2023
DENİZ CAN
Üner Çolak Tez Yüksek Lisans Tamamlandı
Developing a framework for target cost in post-disaster housing by minimizing time and optimizing cost using 3D model
Lisansüstü Eğitim Enstitüsü, İstanbul Teknik Üniversitesi, 2024
ZAFER ÜZMEZ
Onur Behzat Tokdemir Tez Yüksek Lisans Tamamlandı
Cost based performance evaluation of supply chain types regarding demand uncertainty: A proposed mathematical model
Fen Bilimleri Enstitüsü, İstanbul Teknik Üniversitesi, 2009
HASAN CAN KESKİN
Hür Bersam Sidal Tez Yüksek Lisans Tamamlandı
Cost Analysis for Embedded Systems Experiments with Priced Timed Automata
Electronic Notes in Theoretical Computer Science, Vol. 238, No. 6, Haziran 2010, s. 81-95, ISSN: 15710661
OVATMAN TOLGA,ASKE BREKLİNG,MİCHAEL HANSEN
Computer Aided Design and Cost Estimation Model of Soda Ash Processes From Trona
7 th. International Mineral Processing Symposium
DURMAZHİLMİOĞLU. N,, OKUTAN. H,
Hasan Can Okutan Tam metin bildiri
Computer Aided Design and Cost Estimation model of Commercial Soda Ash Processes For Turkish Trona Mineral
Proceeding of The International Symposium On Modelling, Simulation and Control of Hydrometallurgical Processes,
SAYGILI. G,, OKUTAN. H,
Hasan Can Okutan Tam metin bildiri
A crashing-based time-cost trade-off model considering quality cost and contract clauses
International Journal of Construction Management, Vol. 23, No. 6, Haziran 2023, s. 954-963, ISSN: 1562-3599
AKIN FIRAT DOĞU, POLAT TATAR GÜL, TÜRKOĞLU HARUN, DAMCI ATİLLA
Gül Polat Tatar Özgün Makale
A crashing-based time-cost trade-off model considering quality cost and contract clauses
International Journal of Construction Management, Vol. 23, No. 6, Haziran 2023, s. 954-963, ISSN: 1562-3599
AKIN FIRAT DOĞU, POLAT TATAR GÜL, TÜRKOĞLU HARUN, DAMCI ATİLLA
Harun Türkoğlu Özgün Makale
A crashing-based time-cost trade-off model considering quality cost and contract clauses
International Journal of Construction Management, Vol. 23, No. 6, Haziran 2023, s. 954-963, ISSN: 1562-3599
AKIN FIRAT DOĞU, POLAT TATAR GÜL, TÜRKOĞLU HARUN, DAMCI ATİLLA
Atilla Damcı Özgün Makale
Allocation of Returned Products among Different Recovery Options through an Opportunity Cost Based Dynamic Approach
Decision Sciences, Vol. 45, No. 6, Aralık 2014, s. 1083-1116, ISSN: 1540-5915
ÖZDEMİR AKYILDIRIM ÖZNUR,DENİZEL KARAKAYA EMİNE MELTEM,FERGUSON MARK
A fuzzy multi objective model for solving project network problem with bonus and incremental penalty cost
Computers & Industrial Engineering, Vol. 82, Nisan 2015, s. 143-150, ISSN: 03608352
ÇEBİ FERHAN,OTAY İREM
Ferhan Çebi Özgün Makale
A Building Cost Estimation Model Based on Cost Significant Work Packages
Engineering, Construction and Architectural Management, Vol. 12, No. 3, Mayıs 2005, s. 251-263
TAS ELCIN,YAMAN HAKAN
Elçin Filiz Taş Özgün Makale
A Building Cost Estimation Model Based On Functional Elements
A|Z ITU Journal of the Faculty of Architecture, Vol. 4, No. 1, Ocak 2007, s. 73-87
YAMAN HAKAN,TAŞ ELÇİN FİLİZ
Elçin Filiz Taş Özgün Makale
COMPUTER AIDED DESIGN AND COST ESTIMATION MODEL OF COMMERCIAL SODA ASHPROCESSES FOR TURKISH TRONA MINERAL
MODELLING, SIMULATION AND CONTROL HYDROMETALLURGICAL PROCESSES, Vol. 1, No. null, Ocak 1993, s. 213-222
SAYGILI G , OKUTAN H
Hasan Can Okutan Özgün Makale
Versatile Comparison of Different Wastewater Collection and Treatment Scenarios on a Campus Model
International Symposium of Scientific Research and Innovative Studies, Balıkesir/TÜRKİYE, 22 Şubat 2021
KÖSE MUTLU BÖRTE
Time Cost Quality Trade off Model for Subcontractor Selection Using Discrete Particle Swarm Optimization Algorithm
31st Annual ARCOM Conference, 7 Eylül 2015
BİNGÖL BEFRİN NEVAL,POLAT TATAR GÜL
Gül Polat Tatar Tam metin bildiri
Cost Model Approach for Next Generation Emergency Call Systems - Italy Case Study (WOS:000391099300016)
VEHITS 2016 2nd International Conference on Vehicle Technology and Intelligent Transport Systems, Roma/İTALYA, 23 Nisan 2016, s. 130-137
APAK AHMET,ÜSTOĞLU İLKER
İlker Üstoğlu Tam metin bildiri
The University of Wisconsin Breast Cancer Epidemiology Simulation Model: An Update
MEDICAL DECISION MAKING, Vol. 38, No. null, Nisan 2018, s. 99-111, ISSN: 0272-989X
ALAGOZ OGUZHAN,ERGÜN MEHMET ALİ,ÇEVİK MÜCAHİT,SPRAGUE BRİAN L.,FRYBACK DENNİS G.,GANGNON RONALD E.,HAMPTON JOHN M.,STOUT NATASHA K.,TRENTHAM-DİETZ AMY
Maintenance stop time influence on aircraft total maintenane cost with downtime integrated cost model
7th International Conference on Mechanical and Aerospace Engineering (ICMAE), 18 Temmuz 2016
SALTOĞLU REMZİ,HUMAİRA NAZMİA,İNALHAN GÖKHAN
Gökhan İnalhan Tam metin bildiri

İLETİŞİM BİLGİLERİ

İstanbul Teknik Üniversitesi Rektörlüğü İTÜ Ayazağa Kampüsü Rektörlük Binası, Maslak-Sarıyer / İstanbul Tel: +90 212 285 3930