ARAMA SONUÇLARI

Toplam 24 adet sonuçtan 20 tanesi görüntülenmektedir.

Arama









Yıllara göre arama

Özel Aralık Girişi

Synchronization of Planning and Production Processes in a Large Mine
INFORMS, Austin/AMERİKA BİRLEŞİK DEVLETLERİ, 7 Kasım 2010
KAHRAMAN MUHAMMET MUSTAFA,DESSUREAULT SEAN
Bottleneck identification and ranking model for mine operations
Production Planning & Control, Vol. 31, No. 14, Ekim 2020, s. 1178-1194, ISSN: 0953-7287","1366-5871
KAHRAMAN MUHAMMET MUSTAFA,ROGERS W. PRATT,DESSUREAULT SEAN
Increasing adherence to mine plan through data integration and process change
INTERNATIONAL JOURNAL OF MINING RECLAMATION AND ENVIRONMENT, Vol. 32, No. 5, Ocak 2018, s. 341-354, ISSN: 1748-0930
KAHRAMAN MUHAMMET MUSTAFA,DESSUREAULT SEAN
IT enabled Changes to Frontline Mine Planning in Large Coal Mines to Balance Production Efficiency, Long-term Schedules in Real-time
SME Annual Meeting Exhibit, Colorado/AMERİKA BİRLEŞİK DEVLETLERİ, 28 Şubat 2011
KAHRAMAN MUHAMMET MUSTAFA,DESSUREAULT SEAN
Development of Performance Prediction Models for Block-Cutting Machines (S/T) with Circular Saws Used in Natural Stone Factories
26th International Symposium on Mine Planning Equipment Selection (MPES 2017), Lulea/İSVEÇ, 29 Ağustos 2017, s. 239-244
TUMAÇ DENİZ,CEVİM KAMİL CENGİZ,SHATERPOUR MAMAGHANİ AYDIN
Deniz Tumaç Tam metin bildiri
Cutting Performance of Chain Saws in Quarries and Laboratory
Fifteenth International Symposium MPES 2006 on Mine Planning and Equipment Selection, 15 Mayıs 2006, s. 1324-1329
ÇOPUR HANİFİ,BALCI CEMAL,BİLGİN NUH,TUMAÇ DENİZ,FERİDUNOGLU CENK,DİNCER TURGAY,SERTER AHMET
Deniz Tumaç Tam metin bildiri
Factors Affecting the Selection and Performance of Raise Boring Machines (RBMs) and Case Studies from Turkey
26th International Symposium on Mine Planning Equipment Selection Conference (MPES 2017), Luleå/İSVEÇ, 29 Ağustos 2017, s. 153-161, ISSN: 978-91-7583-935-3
SHATERPOUR MAMAGHANİ AYDIN,ÇOPUR HANİFİ
Hanifi Çopur Tam metin bildiri
Flow behaviour of tailing paste in surface paste disposal technology
23rd International Symposium on Mine Planning & Equipment Selection (MPES 2015), 9 Kasım 2015
ÖZDEMİR ORHAN,BAŞÇETİN ATAÇ,ADIGÜZEL DENİZ,TÜYLÜ SERKAN
Orhan Özdemir Tam metin bildiri
An investigation of crack formation in surface paste disposal
23rd International Symposium on Mine Planning & Equipment Selection (MPES 2015), 9 Kasım 2015
BAŞÇETİN ATAÇ,ÖZDEMİR ORHAN,TÜYLÜ SERKAN,ADIGÜZEL DENİZ
Orhan Özdemir Tam metin bildiri
Factors Affecting the Selection and Performance of Raise Boring Machines (RBMs) and Case Studies from Turkey
26th International Symposium on Mine Planning Equipment Selection Conference (MPES 2017), Luleå/İSVEÇ, 29 Ağustos 2017, s. 153-161, ISSN: 978-91-7583-935-3
SHATERPOUR MAMAGHANİ AYDIN,ÇOPUR HANİFİ
Aydın Shaterpour Mamaghanı Tam metin bildiri
Development of Performance Prediction Models for Block-Cutting Machines (S/T) with Circular Saws Used in Natural Stone Factories
26th International Symposium on Mine Planning Equipment Selection (MPES 2017), Lulea/İSVEÇ, 29 Ağustos 2017, s. 239-244
TUMAÇ DENİZ,CEVİM KAMİL CENGİZ,SHATERPOUR MAMAGHANİ AYDIN
Aydın Shaterpour Mamaghanı Tam metin bildiri
Computer Design and Operation of Quarries for Non-metallic Mineral Industries - A case study at Lafarge Limestone Deposit in Turkey.
9 th Int. Symp. on Mine Planning and Equipment Selection, Athens/YUNANİSTAN, Vol. 1, 10 Ekim 2000, s. 6-12
ERGİN HASAN, BAŞARAN M
Hasan Ergin Tam metin bildiri
The use of fuzzy logic methods to predict specific energy for roadheaders
10th International Symposium on Mine Planning and Equipment Selection (MPES), New Delhi/HİNDİSTAN, Vol. 1, 19 Kasım 2001, s. 173-179
ACAROĞLU ERGÜN ÖMÜR, ERGİN HASAN, ESKİKAYA ŞİNASİ
Hasan Ergin Tam metin bildiri
Determination of The Optimum Design Parameters of Pb-Zn Mine Tailing Dam Using 2D Modelling
26th International Symposium On Mine Planning and Equipment Selection (MPES 2017), Lulea/İSVEÇ, 29 Ağustos 2017, s. 353-355
BAŞÇETİN ATAÇ,ADIGÜZEL DENİZ,ODABAŞ EREN,TÜYLÜ SERKAN,EKER HASAN
Ataç Başçetin Tam metin bildiri
The Study Of Relationships Between Economical And Environmental Parameters For Sustainable Resources Management
Eighteenth International Symposium on Mine Planning & Equipment Selection (MPES 2009), 16 Kasım 2009, s. 107-119
BAŞÇETİN ATAÇ,NİETO ANTONİO,TÜYLÜ SERKAN
Ataç Başçetin Tam metin bildiri
Flow behaviour of tailing paste in surface paste disposal technology
23rd International Symposium on Mine Planning & Equipment Selection (MPES 2015), Johannesburg/GÜNEY AFRİKA, 9 Kasım 2015, s. 1027-1032
ÖZDEMİR ORHAN,BAŞÇETİN ATAÇ,ADIGÜZEL DENİZ,TÜYLÜ SERKAN
Ataç Başçetin Tam metin bildiri
An investigation of crack formation in surface paste disposal
23rdInternational Symposium on Mine Planning & Equipment Selection (MPES 2015), 9 Kasım 2015, s. 35-40
BAŞÇETİN ATAÇ,ÖZDEMİR ORHAN,TÜYLÜ SERKAN,ADIGÜZEL DENİZ
Ataç Başçetin Tam metin bildiri
Factors Affecting the Selection of Raise Boring Machines (RBMs) and Case Studies from Turkey
26th International Symposium on Mine Planning Equipment Selection, Lulea/İSVEÇ, 29 Ağustos 2017
SHATERPOUR MAMAGHANİ AYDIN,ÇOPUR HANİFİ
Hanifi Çopur Tam metin bildiri
A mine induced environmental problem: ground vibration as a result of quarry blasting operations on nearby structures in Istanbul metropolitan area
MPES 2001-10th Int. Symposium on Mine Planning and Equipment Selection, New Delhi, New Delhi/HİNDİSTAN, 19 Kasım 2001, s. 427-431
KUZU CENGİZ
Cengiz Kuzu Tam metin bildiri
Application of sublevel caving with high-pressure air blasting into steeply dipping hard coal seam at Zonguldak colliery
The MPES 2001-10th International Symposium on Mine Planning and Equipment Selection, New Delhi, New Delhi/HİNDİSTAN, 19 Kasım 2001, s. 911-916
KUZU CENGİZ,FİŞNE ABDULLAH
Cengiz Kuzu Tam metin bildiri

İLETİŞİM BİLGİLERİ

İstanbul Teknik Üniversitesi Rektörlüğü İTÜ Ayazağa Kampüsü Rektörlük Binası, Maslak-Sarıyer / İstanbul Tel: +90 212 285 3930