ARAMA SONUÇLARI

Toplam 469 adet sonuçtan 20 tanesi görüntülenmektedir.

Arama









Yıllara göre arama

Özel Aralık Girişi

A New Metric for Labor Productivity: Case Study of a Multi-Family Residential Project
International Conference on Construction in the 21st Century (CITC12), AMMAN/ÜRDÜN, 16 Mayıs 2022, s. 32
YILMAZ NEZİHA, ARİF FARRUKH, BAYRAKTAR MEHMET EMRE, KOLOĞLU BARTU
Digital twin practices for enhanced construction management: a literature review
7th International Project and Construction Management Conference, İstanbul/TÜRKİYE, 20 Ekim 2022
AKTÜRK BERKAY, ÇAKMAK FATMA PINAR
Fatma Pınar Çakmak Tam metin bildiri
Design-construction interface problems in construction projects
7th International Project and Construction Management Conference, İstanbul/TÜRKİYE, 20 Ekim 2022
BUGAN EMİNE ESRA, ÇAKMAK FATMA PINAR
Fatma Pınar Çakmak Tam metin bildiri
A systematic literature review on lean construction for tendering
7th International Project and Construction Management Conference, İstanbul/TÜRKİYE, 20 Ekim 2022
TÜRKMEN ABDULLAH, ÇAKMAK FATMA PINAR
Fatma Pınar Çakmak Tam metin bildiri
Factors Affecting Agile Software Project Success
IEEE Access, Ocak 2024, ISSN: 2169-3536
BİNBOGA BURCU,ALTIN GÜMÜŞSOY ÇİĞDEM
An interactive multi-objective programming approach for project portfolio selection and scheduling
Computers and Industrial Engineering, Vol. 169, Temmuz 2022, ISSN: 0360-8352
ŞAHİN ZORLUOĞLU ÖZGE, KABAK ÖZGÜR
Özgür Kabak Özgün Makale
A comparative analysis of text representation, classification and clustering methods over real project proposals
Emerald, Vol. 16, Şubat 2023, ISSN: 1756-378X
YONTAR MELTEM, YANIK ÖZBAY SEDA, AMASYALI MEHMET FATİH
Seda Yanık Özbay Özgün Makale
Lean Project Management using Unmanned Aerial Vehicles
Tamap Journal of Engineering, Şubat 2019, ISSN: 2602-2362
ERSÖZ AHMET BAHADDİN,PEKCAN ONUR,TOKDEMİR ONUR BEHZAT
Onur Behzat Tokdemir Özgün Makale
Building Information Modelling for Performing AutomatedQuantity Take-Off
5th International Project and Construction Management Conference (IPCMC 2018), 16 Kasım 2018
KULA BEHLÜL,ARTAN DENİZ,ERGEN PEHLEVAN ESİN
Deniz Artan Tam metin bildiri
Impact of Project Characteristics on Risks and Disputes in Subcontractor Contracts
12th International Congress on Advances in Civil Engineering, 21 Eylül 2016
İLTER DENİZ,BAKİOĞLU GÖKÇE
Deniz Artan Tam metin bildiri
Ensemble and Cross-Project Software Reliability Growth Models for Safety-Critical Systems
International Conference on Computer Science and Engineering, 15 Eylül 2021
ÖZTÜRK ELİFNUR, TOSUN KÜHN AYŞE
Ayşe Tosun Kühn Tam metin bildiri
A Semi Automated Rule Based Approach for Safety BasedScheduling
5th International Project and Construction Management Conference (IPCMC 2018), 16 Kasım 2018
SEVİM MERVE,GÜRCANLI GÜRKAN EMRE
Gürkan Emre Gürcanlı Tam metin bildiri
An Industrial Archaeology Project at Thrace Kırklareli Demirköy Samakovcuk
Mimarist, 2005, s. 95-98
DANIŞMAN GÜNHAN,TANYELİ GÜLSÜM
Gülsüm Tanyeli Özgün Makale
Project Crashing with Crash Duration Consumption Rate: An Illustrative Example
Creative Construction e-Conference, 28 Haziran 2020
TÜRKOĞLU HARUN,POLAT TATAR GÜL,DAMCI ATİLLA,AKIN FIRAT DOĞU
Gül Polat Tatar Tam metin bildiri
Job satisfaction of architects according to career stages: An empirical investigation
The 5th International Project and Construction Management Conference (IPCMC2018), 16 Kasım 2018
SAVAŞ SEZER,ACAR EMRAH
Emrah Acar Tam metin bildiri
Architects’ Motivators and Personal Values
5th international Project and Construction Management Conference (IPCMC2018), 16 Kasım 2018
DAMCI ATİLLA,ARDİTİ DAVİD,POLAT TATAR GÜL,TÜRKOĞLU HARUN
Gül Polat Tatar Tam metin bildiri
Emerging model for disaster mitigation in Istanbul International Organizations Project Assemblage and policy mutation
AESOP Conference, Utrecht/Delft/HOLLANDA, 9 Temmuz 2014
DEMİREŞ ÖZKUL BAŞAK,AY DENİZ
Başak Demireş Özkul Özet Bildiri
Personality Effect on Developing Resilience and Managing Stress in Architecture Students
6th International Project and Construction Management Conference, 12 Kasım 2020
ŞANLI ALİME,ÇAKMAK FATMA PINAR
Fatma Pınar Çakmak Tam metin bildiri
Identification of Causes of Delay Factors in Construction Projects
6th International Project and Construction Management Conference, 12 Kasım 2020
ALPTEKİN ASLI,ÇAKMAK FATMA PINAR
Fatma Pınar Çakmak Tam metin bildiri
Towards a Better Understanding of Construction Disputes: A Literature Review
6th International Project and Construction Management Conference, 12 Kasım 2020
TEMİZ ESMA,ÇAKMAK FATMA PINAR
Fatma Pınar Çakmak Tam metin bildiri

İLETİŞİM BİLGİLERİ

İstanbul Teknik Üniversitesi Rektörlüğü İTÜ Ayazağa Kampüsü Rektörlük Binası, Maslak-Sarıyer / İstanbul Tel: +90 212 285 3930