The Selection of Bi-Fractional Order Reference Model Parameters for Minimum Settling Time
XV International Conference on Electronics, Telecommunications, Automatics and Informatics (ETAI) 2021, Vol. 2, No. 1, 23 Eylül 2021, ISSN: 2545-4889
KEÇECİ ERTUĞRUL, YUMUK ERHAN, GÜZELKAYA MÜJDE, EKSİN İBRAHİM
|
Multi criteria supplier selection using fuzzy AHP
Logistics information management, Vol. 16, No. 6, 2003, s. 382-394
KAHRAMAN CENGİZ,CEBECİ UFUK,ULUKAN HAKKI ZİYA
|
A multi-criteria based selection method using non-dominated sorting for genetic algorithm based design
Optimization and Engineering, Vol. 21, No. 4, Aralık 2020, s. 1319-1357, ISSN: 1389-4420
GÜNPINAR ERKAN,KHAN SHAHROZ
|
Formal Assessment and Measurement of Data Utilization and Value for Mines
MINING METALLURGY EXPLORATION, Vol. 36, No. 2, 2019, s. 257-268, ISSN: 2524-3462
ROGERS W. PRATT,KAHRAMAN MUHAMMET MUSTAFA,DESSUREAULT SEAN
|
Analysis of Formwork System Selection Criteria for Building Construction Projects: A Comparative Study
Buildings, Vol. 11, No. 12, Aralık 2021, s. 1-28, ISSN: 2075-5309
TERZİOGLU TAYLAN, POLAT TATAR GÜL, TÜRKOĞLU HARUN
|
Site selection of the Turkish Antarctic Research station using Analytic Hierarchy Process
Polar Science, Vol. 22, Aralık 2019, s. 100473, ISSN: 1873-9652
YAVAŞOĞLU HASAN HAKAN,KARAMAN HİMMET,ÖZSOY ÇİÇEK BURCU,BİLGİ SERDAR,TUTAK BİLGE,GÜLNERMAN AYŞE GİZ,OKTAR ÖZGÜN,YİRMİBEŞOĞLU SİNAN
|
Research and Development Project Selection: A Comprehensive Analysis of the Trends and Methods
South African Journal of Industrial Engineering, Vol. 32, No. 4, Aralık 2021, s. 24-43, ISSN: 2224-7890
FİLİZ TÜRKMEN GİZEM, TOPCU YUSUF İLKER
|
Solar energy project selection by using hesitant Pythagoreanfuzzy TOPSIS
The 13rd International FLINS Conference on Data Science and Knowledge Engineering for Sensing Decision Support (FLINS2018), 2018
ÖZTAYŞİ BAŞAR,ÇEVİK ONAR SEZİ,KAHRAMAN CENGİZ,ÇOBAN VEYSEL
|
R&D Management in the Knowledge Era Selection of Gamification Elements for Demand Side Energy Management: An Application Using Hesitant Fuzzy AHP
2019, s. 299-322, Springer
ÖZTAYŞİ BAŞAR,DOĞAN ONUR,GÜL HAKAN
|
A semi-systematic literature review on supplier selection in construction projects
Journal of Construction Engineering, Management & Innovation, Vol. 4, No. 4, Aralık 2021, s. 256-266, ISSN: 2630-5771
POLAT TATAR GÜL
|
A building material evaluation and selection model for the Turkish construction sector
Engineering, Construction and Architectural Management, Vol. 15, No. 2, Mart 2008, s. 149-163, ISSN: 0969-9988
TAŞ ELÇİN FİLİZ,YAMAN HAKAN,TANAÇAN LEYLA
|
Offshore wind farm site selection using interval rough numbers based Best-Worst Method and MARCOS
Applied Soft Computing, Vol. 109, Ocak 2021, s. 1-28, ISSN: 1568-4946
DEVECİ MUHAMMET, ÖZCAN ENDER, CHANDRAN ROBERT JOHN, PAMUCAR DRAGAN, KARAMAN HİMMET
|
Selection of VFQ Consultant by Using Integrated Fuzzy AHP and Fuzzy TOPSIS
European Journal of Science and Technology, No. 24, Ocak 2021, s. 262-267, ISSN: 2148-2683
KEKİLLİ EZGİ, CEBECİ UFUK, SILAY LEVENT
|
GIS-based maritime spatial planning for site selection of offshore wind farms with exergy efficiency analysis: a case study
International Journal of Exergy, Vol. 34, No. 2, Ocak 2021, s. 255-267, ISSN: 1742-8297
İŞİAÇIK ÇOLAK TUGSAN, ŞENEL GİZEM, GÖKSEL ÇİĞDEM
|
A novel interval-valued spherical fuzzy EDAS: An application to IT auditor selection
Global Joint Conference on Industrial Engineering and Its Application Areas, 30 Ekim 2021
MENEKŞE AKIN, CAMGÖZ AKDAĞ HATİCE
|
Computer Design and Operation of Quarries for Non-metallic Mineral Industries - A case study at Lafarge Limestone Deposit in Turkey.
9 th Int. Symp. on Mine Planning and Equipment Selection, Athens/YUNANİSTAN, Vol. 1, 10 Ekim 2000, s. 6-12
ERGİN HASAN, BAŞARAN M
|
A Fuzzy Integrated Approach for Project Selection
Journal of Enterprise Information Management, Vol. 27, No. 3, Nisan 2014, s. 247-260, ISSN: 1741-0398
BOLAT HÜR BERSAM,ÇEBİ FERHAN,TEMUR GÜL TEKİN,OTAY İREM
|
Selection of Effective Roll Stabilizing Device for Special Purpose Ships Using Fuzzy Topsis
II. International Scientific and Vocational Studies Congress, Nevşehir/TÜRKİYE, 5 Temmuz 2018
DEMİREL HAKAN,BALIN ABİT
|
Applying Fuzzy Analytic Hierarchy Process Approach for a ShipType Selection
1. Uluslararası GAP Matematik - Mühendislik- Fen ve Sağlık Bilimleri Kongresi, 4 Ekim 2018
DEMİREL HAKAN,KOÇAL TARIK,BALIN ABİT
|
Multi Criteria and Multi Stage Facility Location Selection under Interval Type 2 Fuzzy Environment: A Case Study for a Cement Factory
INTERNATIONAL JOURNAL OF COMPUTATIONAL INTELLIGENCE SYSTEMS, Vol. 8, No. 2, Mart 2015, s. 330-344, ISSN: 1875-6891
ÇEBİ FERHAN,OTAY İREM
|