Scheduling system for repetitive unit construction using line‐of‐balance technology
Engineering, Construction and Architectural Management, Vol. 8, No. 2, Şubat 2001, s. 90-103, ISSN: 0969-9988
ARDITI DAVID,TOKDEMİR ONUR BEHZAT,SUH KANGSUK
|
Effect of learning on line-of-balance scheduling
International Journal of Project Management, Vol. 19, No. 5, Temmuz 2001, s. 265-277, ISSN: 02637863
ARDİTİ DAVİD,TOKDEMİR ONUR BEHZAT,SUH KANGSUK
|
VALUE STREAM MAPPING AND RESOURCE OPTIMIZATION FOR A HIGH-RISE BUILDING USING LINE OF BALANCE
Fen Bilimleri Enstitüsü, Orta Doğu Teknik Üniversitesi, 2019
LEART GORANA
|
Determination of last glacial equilibrium line altitudes of Turkey by glacial mass balance model
Avrasya Yerbilimleri Enstitüsü, İstanbul Teknik Üniversitesi, 2018
SAVAŞ GÜNDÜZ
|
DETERMINATION OF LAST GLACIAL EQUILIBRIUM LINE ALTITUDES OF TURKEY BY GLACIAL MASS BALANCE MODEL
TURQUA TÜRKİYE KUVATERNER SEMPOZYUMU, İSTANBUL/TÜRKİYE, 2 Mayıs 2018, s. 155-155
GÜNDÜZ SAVAŞ,CANDAŞ ADEM,SARIKAYA MEHMET AKİF
|
Impacts of different objective functions on resource leveling in Line of Balance scheduling
KSCE Journal of Civil Engineering, Vol. 20, No. 1, Ocak 2016, s. 58-67, ISSN: 1226-7988
DAMCI ATİLLA,ARDİTİ DAVİD,POLAT TATAR GÜL
|
Scheduling Asphalt Highway Construction Operations Using the Combination of Line of Balance and Discrete Event Simulation Techniques
IEEM International Conference on Industrial Engineering and Engineering Management (IEEM09), 8 Aralık 2009
POLAT TATAR GÜL,BUYUKSARACOGLU YALCİN,DAMCI ATİLLA
|
Resource Leveling in Line of Balance Scheduling
Computer-Aided Civil and Infrastructure Engineering, Vol. 28, No. 9, Ekim 2013, s. 679-692, ISSN: 10939687
DAMCI ATİLLA,ARDİTİ DAVİD,POLAT TATAR GÜL
|
Challenges in Line-of-Balance Scheduling
Journal of Construction Engineering and Management, Vol. 128, No. 6, Aralık 2002, s. 545-556, ISSN: 0733-9364
ARDİTİ DAVİD,TOKDEMİR ONUR BEHZAT,SUH KANGSUK
|
ALISS: Advanced Linear Scheduling System
Construction Management and Economics, Vol. 24, No. 12, Ekim 2006, s. 1253-1267, ISSN: 0144-6193
TOKDEMİR ONUR BEHZAT,ARDİTİ DAVİD,BALCİK CENK
|
Scheduling system for high rise building construction
Construction Management and Economics, Vol. 20, No. 4, Haziran 2002, s. 353-364, ISSN: 0144-6193
ARDİTİ DAVİD,SİKANGWAN PİRASAK,TOKDEMİR ONUR BEHZAT
|
Resource Leveling in Line of Balance Scheduling
Computer-Aided Civil and Infrastructure Engineering, Vol. 28, No. 9, Ekim 2013, s. 679-692, ISSN: 10939687
DAMCI ATİLLA,ARDITI DAVID,POLAT TATAR GÜL
|
Revisiting the concept of natural rhythm of production in line of balance scheduling
International Journal of Construction Management, Vol. 22, No. 12, Temmuz 2022, s. 2335-2344, ISSN: 1562-3599","2331-2327
DAMCI ATİLLA
|
Multiresource Leveling in Line of Balance Scheduling
Journal of Construction Engineering and Management, Vol. 139, No. 9, Eylül 2013, s. 1108-1116, ISSN: 0733-9364
DAMCI ATİLLA,ARDITI DAVID,POLAT TATAR GÜL
|
Impacts of different objective functions on resource leveling in Line of Balance scheduling
KSCE Journal of Civil Engineering, Vol. 20, No. 1, Ocak 2016, s. 58-67, ISSN: 1226-7988
DAMCI ATİLLA,ARDITI DAVID,POLAT TATAR GÜL
|
Scheduling Asphalt Highway Construction Operations Using the Combination of Line of Balance and Discrete Event Simulation Techniques
Industrial Engineering and Engineering Management Conference, 8 Aralık 2009
POLAT TATAR GÜL,BÜYÜKSARAÇOĞLU YALÇIN,DAMCI ATİLLA
|
Delay Risk Assessment of Repetitive Construction Projects Using Line-of-Balance Scheduling and Monte Carlo Simulation
Journal of Construction Engineering and Management, Vol. 145, No. 2, Şubat 2019, ISSN: 0733-9364
TOKDEMİR ONUR BEHZAT, EROL HÜSEYİN, DİKMEN TOKER İREM
|