ARAMA SONUÇLARI

Toplam 31 adet sonuçtan 20 tanesi görüntülenmektedir.

Arama









Yıllara göre arama

Özel Aralık Girişi

A fuzzy logic framework to handle uncertainty in remote sensing-based hydrological data for water budget improvement across mid- and small-scale basins
HYDROLOGICAL PROCESSES, Vol. 36, No. 11, Kasım 2022, ISSN: 0885-6087
KAYAN GÖKHAN, TÜRKER UMUT, ERTEN ESRA
Investigation Anthropogenic Impacts and Climate Factors on Drying up of Urmia Lake using Water Budget and Drought Analysis
WATER RESOURCES MANAGEMENT, Vol. 32, No. 1, 2018, s. 325-337, ISSN: 0920-4741
GHALE YUSUF ALİZADE GOVARCHİN,ALTUNKAYNAK ABDÜSSELAM,UNAL ALPER
Modeling the hydroclimatic effects of local land use and land cover changes on the water budget in the upper Euphrates - Tigris basin
JOURNAL OF HYDROLOGY, Vol. 576, No. null, Eylül 2019, s. 596-609, ISSN: 0022-1694
YİLMAZ YELİZ A.,ŞEN ÖMER LÜTFİ,TURUNCOGLU UFUK UTKU
Uncertainty quantification of multi-source hydrological data products for the improvement of water budget estimations in small-scale Sakarya basin, Turkey
HYDROLOGICAL SCIENCES JOURNAL-JOURNAL DES SCIENCES HYDROLOGIQUES, Vol. 67, No. 10, Haziran 2022, s. 1609-1622, ISSN: 0262-6667
KAYAN GÖKHAN, TÜRKER UMUT, ERTEN ESRA
Investigation Anthropogenic Impacts and Climate Factors on Drying up of Urmia Lake using Water Budget and Drought Analysis
WATER RESOURCES MANAGEMENT, Vol. 32, No. 1, Ocak 2018, ISSN: 0920-4741
YUSUF ALIZADE GOVARCHIN GHALE, ALTUNKAYNAK ABDÜSSELAM, ÜNAL ALPER
Interest Expenditure of Central Government Budget in Some Emerging Economies
INSAC: International Science and Academic Congress, KONYA/TÜRKİYE, 19 Nisan 2019
ÖVENÇ GÖKHAN
Gökhan Övenç Tam metin bildiri
Extended water budget equation based on the fuzzy regression and implementation for lake Van
Lisansüstü Eğitim Enstitüsü, İstanbul Teknik Üniversitesi, 2021
ECEM UYSAL
Abdüsselam Altunkaynak Tez Yüksek Lisans Tamamlandı
Opportunities of cost reduction and risks of budget overrun in maintenance spending of an airline in the current market conditions
Fen Bilimleri Enstitüsü, İstanbul Teknik Üniversitesi, 2019
REMZİ SALTOĞLU
Gökhan İnalhan Tez Doktora Tamamlandı
Factors causing time slippages and budget overruns in it projects
Fen Bilimleri Enstitüsü, İstanbul Teknik Üniversitesi, 2003
ÇİĞDEM ALTIN
Fethi Çalışır Tez Yüksek Lisans Tamamlandı
Influences of buyer-supplier relationships and managers' conflict management styles on time and budget performances of construction projects
Fen Bilimleri Enstitüsü, İstanbul Teknik Üniversitesi, 2004
ÖZGÜR YALÇINKAYA
Murat Baskak Tez Yüksek Lisans Tamamlandı
Earthquake performance and project budget comparison of a conventional building and a seismically isolated building
Lisansüstü Eğitim Enstitüsü, İstanbul Teknik Üniversitesi, 2021
OĞUZCAN ÇATLIOĞLU
Arcan Yanık Tez Yüksek Lisans Tamamlandı
Improving the performance of remote sensing-based water budget components across mid- and small- scale basins
Lisansüstü Eğitim Enstitüsü, İstanbul Teknik Üniversitesi, 2022
GÖKHAN KAYAN
Esra Erten Tez Doktora Tamamlandı
Earthquake performance and project budget comparison of a conventional building and a seismically isolated building
Lisansüstü Eğitim Enstitüsü, İstanbul Teknik Üniversitesi, 2021
OĞUZCAN ÇATLIOĞLU
Senem Bilir Mahçiçek Tez Yüksek Lisans Tamamlandı
Ground-Water Seepage Losses Estimation In Terkos Lake Using Water Budget Analysis and Analytical Solution
E.J. Engineering Sciences and Technology, 8 Mayıs 2017
KHANSAA A AHMED,ALTUNKAYNAK ABDÜSSELAM,HASAN G ELMAZOGHİ
Abdüsselam Altunkaynak Tam metin bildiri
Effect of lake-water budget management preferences on optimum operating conditions and neighboring basins interacting: case of Lake Beyşehir (Turkey)
Sustainable Water Resources Management, Vol. 8, Ocak 2021, ISSN: 2363-5037
ŞANLI AHMET SANCAK, KESGİN ERDAL, TAN KESGİN REMZİYE İLAYDA, AĞAÇCIOĞLU HAYRULLAH, SİNAN İLKE
Erdal Kesgin Özgün Makale
Electricity consumption analysis based on Turkish Household Budget Surveys
ENERGY ECOLOGY AND ENVIRONMENT, Vol. 5, No. 6, Aralık 2020, s. 444-455, ISSN: 2363-7692
KAYALICA MEHMET ÖZGÜR,ÖZÖZEN AVNİ,GÜVEN DENİZHAN,KAYAKUTLU GÜLGÜN,BAYAR AYŞE AYLİN
Denizhan Güven Özgün Makale
Determinants of budget overruns on IT projects
Technovation, Vol. 25, No. 6, Haziran 2005, s. 631-636, ISSN: 01664972
ÇALIŞIR FETHİ,ALTIN GÜMÜŞSOY ÇİĞDEM
Investigation Anthropogenic Impacts and Climate Factors on Drying up of Urmia Lake using Water Budget and Drought Analysis
Water Resources Management, Vol. 32, No. 1, Ocak 2018, s. 325-337, ISSN: 0920-4741
GOVARCHİN GHALE YUSUF ALİZADE,ALTUNKAYNAK ABDÜSSELAM,ÜNAL ALPER
Alper Ünal Özgün Makale
Electricity consumption analysis based on Turkish Household Budget Surveys
ENERGY ECOLOGY AND ENVIRONMENT, Vol. 5, No. 6, Aralık 2020, s. 444-455, ISSN: 2363-7692
KAYALICA MEHMET ÖZGÜR,ÖZÖZEN AVNİ,GÜVEN DENİZHAN,KAYAKUTLU GÜLGÜN,BAYAR AYŞE AYLİN
Mehmet Özgür Kayalıca Özgün Makale
LAND COVER LAND USE CHANGE IN THE EUPHRATES AND TIGRIS BASIN HOW DOES IT AFFECT THE REGIONAL WATER BUDGET UNDER A CHANGING CLIMATE
MedClivar 2016, 26 Eylül 2016
YILMAZ YELİZ,ŞEN ÖMER LÜTFİ,TURUNÇOĞLU UFUK UTKU
Ömer Lütfi Şen Özet Bildiri

İLETİŞİM BİLGİLERİ

İstanbul Teknik Üniversitesi Rektörlüğü İTÜ Ayazağa Kampüsü Rektörlük Binası, Maslak-Sarıyer / İstanbul Tel: +90 212 285 3930