ARAMA SONUÇLARI

Toplam 267 adet sonuçtan 20 tanesi görüntülenmektedir.

Arama









Yıllara göre arama

Özel Aralık Girişi

Preliminary Resuls of 3D Full Seismic Waveform tomography of NW Turkey The EU Framework Programme HORIZON 2020 COST Actions Earth System Science and Environmental Management COST Action ES1401 Time Dependent Seismology TIDES 1st Advanced Training School on Seismic Data 01 05 May 2015 Bertinoro Italy
EU Framework Programme – HORIZON 2020 – COST Actions: Earth System Science and Environmental Management COST Action ES1401 – Time Dependent Seismology (TIDES) 1st Advanced Training School on Seismic Data, BERTINORO/İTALYA, 1 Mayıs 2015
ÇUBUK YEŞİM,FICHTNER ANDREAS,TAYMAZ TUNCAY
Tuncay Taymaz Özet Bildiri
Identification of cost factors for integrated alternative cost and time analysis in pre-construction stage
Fen Bilimleri Enstitüsü, İstanbul Teknik Üniversitesi, 2017
GÜLSÜM SEVDE BALTAŞI
Esin Ergen Pehlevan Tez Yüksek Lisans Tamamlandı
A Performance Analysis of Low Cost GPS Receivers in Kinematic Applications
Journal of Navigation, Vol. 62, No. 4, Mayıs 2009, s. 687-697, ISSN: 0373-4633
ALKAN REHA METİN,SAKA MEHMET HALİS
A building cost estimation model based on cost significant work packages
Engineering, Construction and Architectural Management, Vol. 12, No. 3, Haziran 2005, s. 251-263, ISSN: 0969-9988
TAŞ ELÇİN FİLİZ,YAMAN HAKAN
Hakan Yaman Özgün Makale
TEM characterization of free standing Ni nanowire structures obtained from different nickel electroplating baths and utilization of these structures as visible photocatalysts for nanorobotic applications
COST Action MP1407: Electrochemical processing methodologies and corrosionprotection for device and systems miniaturization: 3rd COST Workshop, Barcelona/İSPANYA, 25 Ekim 2017
AVCI BURÇAK,VİDAL SALVADOR PANE,ÜRGEN MUSTAFA KAMİL
Burçak Avcı Özet Bildiri
Quantifying the value of SHM for emergency management of bridges at-risk from seismic damage
JOINT COST TU1402 - COST TU1406 - IABSE WC1 WORKSHOP: The Value of Structural Health Monitoring for the Reliable Bridge Management., 2 Mart 2017
OMENZETTER PİOTR,YAZGAN UFUK,SOYÖZ SERDAR,LİMONGELLİ MARİA
Ufuk Yazgan Tam metin bildiri
Measuring galvanic current by Zero Resistance Ammeter can be misleading when polarization of anode is low A case study TiN Carbon Steel Couple
COST Action MP1407: Electrochemical processing methodologies and corrosionprotection for device and systems miniaturization: 2nd COST Workshop, Atina/YUNANİSTAN, 12 Ekim 2016
ÜRGEN MUSTAFA KAMİL,AVCI BURÇAK
Burçak Avcı Özet Bildiri
Cost Effectiveness of Frequent HIV Testing of High Risk Populations in the United States
JAIDS Journal of Acquired Immune Deficiency Syndromes, Vol. 71, No. 3, Ocak 2016, s. 323-330, ISSN: 1525-4135
HUTCHİNSON ANGELA,FARNHAM PAUL G,SANSOM STEPHANİE L,YAYLALI EMİNE,MERMİN JONATHAN H
Maintenance stop time influence on aircraft total maintenane cost with downtime integrated cost model
7th International Conference on Mechanical and Aerospace Engineering (ICMAE), 18 Temmuz 2016
SALTOĞLU REMZİ,HUMAİRA NAZMİA,İNALHAN GÖKHAN
Gökhan İnalhan Tam metin bildiri
A Building Cost Estimation Model Based on Cost Significant Work Packages
Engineering, Construction and Architectural Management, Vol. 12, No. 3, Mayıs 2005, s. 251-263
TAS ELCIN,YAMAN HAKAN
Elçin Filiz Taş Özgün Makale
Electrochemical Behaviours of Ferrocene Containing Methylacrylate Electrospun Nanofibers
COST MP1206 Workshop Textile Applications of Electrospun Nanofibers, 11 Eylül 2015
GÜMRÜKÇÜ SELİN,ARSLANOĞLU YASİN,SARAÇ ABDÜLKADİR SEZAİ
Cost Analyses of LED Luminaires in Road Lighting
27th Session of the CIE, Sun City/GÜNEY AFRİKA, 9 Temmuz 2011
ONAYGİL SERMİN, GÜLER ÖNDER, ERKİN EMRE
Önder Güler Tam metin bildiri
An Overview of Wind and Solar Energies Usage in Turkey
COST Action ES1002 Workshop, Nice/FRANSA, 22 Mart 2011
İNCECİK SALAHATTİN,KAHYA CEYHAN,TOROS HÜSEYİN
Ceyhan Kahya Tam metin bildiri
An Evaluation of Cost and Pricing Structures of Capital Market Insfrastructure Institutios
Istanbul Finance Congress, 1 Kasım 2018
İPEK SEVEN,EKİNCİ CUMHUR ENİS
Cumhur Enis Ekinci Özet Bildiri
Scheduled Maintenance and Downtime Cost in Aircraft Maintenance Management
International Journal of Mechanical, Aerospace, Industrial, Mechatronic and Manufacturing Engineering, Haziran 2016
SALTOĞLU REMZİ,HUMAİRA NAZMİA,İNALHAN GÖKHAN
Gökhan İnalhan Özgün Makale
Cost-effectiveness of Hepatitis C Treatment among persons who inject drugs in Turkey
2018 IISE Annual Conference, 19 Mayıs 2018
YAYLALI EMİNE,BAŞLAR EFE,ÜSER ÜLKÜ
Emine Yaylalı Özet Bildiri
Cost Evaluation Of Sludge Treatment Options And Energy Recovery From Wastewater Treatment Plant Sludge Treating Leather Tanning Wastewaters
II.Eurocongress IULTCS, 24 Mayıs 2006
GÖRGÜN ERDEM
Hüseyin Erdem Görgün Özet Bildiri
A Comparison of Wind Energy Investment Alternatives Using Interval Valued Intuitionistic Fuzzy Benefit Cost Analysis
SUSTAINABILITY, Vol. 8, No. 2, Şubat 2016
KAHRAMAN CENGİZ,ÇEVİK ONAR SEZİ,ÖZTAYŞİ BAŞAR
Cengiz Kahraman Özgün Makale
Mobility Narratives Commuting experiences of women domestic workers in Istanbul
Training School for Early Stage Researchers, COST Action TA1201, genderSTE, 2 Kasım 2015
BEYAZIT EDA
Optimal Trajectory Planning based on Wind-Optimal Cost Index
2018 Aviation Technology, Integration, and Operations Conference, 25 Haziran 2018
ALİZADEH ALİ, UZUN MEVLÜT, KOYUNCU EMRE
Emre Koyuncu Tam metin bildiri

İLETİŞİM BİLGİLERİ

İstanbul Teknik Üniversitesi Rektörlüğü İTÜ Ayazağa Kampüsü Rektörlük Binası, Maslak-Sarıyer / İstanbul Tel: +90 212 285 3930